What changed — page 10
Older changes to PermitBase’s verified permit dataset, newest first. The most recent changes are on the first page.
August 1, 2026
- Permit type added
Santa Fe, New Mexico — Commercial Tenant Improvement Permit (Commercial Interior/Exterior Remodel/Addition) record added
- Permit type added
Unincorporated White Pine County, Nevada — Commercial Building Permit record added
- Permit type added
Winnemucca, Nevada — Commercial / Industrial Building Permit record added
- Permit type added
Yerington, Nevada — Commercial Building Permit (New Construction, IBC 2018) record added
- Permit type added
Yerington, Nevada — Commercial Tenant Improvement (TI) Permit record added
- Permit type added
Deming, New Mexico — Commercial Building Permit (New Construction, Additions & Remodels/Tenant Improvements) record added
- Permit type added
Edgewood, New Mexico — Commercial Building Permit (State of NM Construction Industries Division — New Construction, Additions & Remodels/Tenant Improvements) record added
- Timeline updated
Edgewood, New Mexico — plan-review timeline record updated: 3–4 business days
- Fee updated
Española, New Mexico — Site & Land Use Development Permit fee record added: Site & Land Use Development Permit (flat — same for residential and commercial) ($75)
- Fee updated
Española, New Mexico — Site & Land Use Development Permit fee record added: Commercial Site Plan review (Planning Commission — only when required for the property/use) ($500 plus $100 per 1,000 square feet)
- Fee updated
Española, New Mexico — Site & Land Use Development Permit fee record added: Infrastructure engineering review and inspection (projects with infrastructure improvements) (3% of total project infrastructure cost (on-site and off-site improvements))
- Fee updated
Española, New Mexico — Site & Land Use Development Permit fee record removed: Site & Land Use Development Permit
- Permit type added
Española, New Mexico — Commercial Building Permit (New Construction, Additions & Remodels/Tenant Improvements) record added
- Permit type added
Unincorporated Elko County, Nevada — Commercial / Industrial Building Permit (includes Tenant Improvements) record added
- Permit type added
Ely, Nevada — Commercial Building Permit (No Dedicated Commercial Track — Universal Joint Application) record added
- Permit type added
Fallon, Nevada — Commercial Building Permit (New Construction & Tenant Improvement) record added
- Permit type added
Sunland Park, New Mexico — Commercial Building Permit (New Construction / Remodel / Tenant Improvement) record added
- Permit type added
Town of Taos, New Mexico — Commercial Building Permit (Zoning Review Application — Commercial, Industrial & Large-Scale Residential; includes Tenant Improvements/Alterations) record added
- Permit type added
Unincorporated Bernalillo County, New Mexico — Commercial Building Permit record added
- Fee updated
San Luis, Arizona — Residential Building Permit (New Construction) fee record updated: $75 → $100
- Fee updated
San Luis, Arizona — Residential Building Permit (New Construction) fee record updated: $50 → $100
- Fee updated
San Luis, Arizona — Commercial Building Permit fee record updated: $50 → $100
- Fee updated
Unincorporated Greenlee County, Arizona — Commercial Building Permit fee record added: OSFM plan review / permit fees (state-level, per A.A.C. R4-36-202) ($210 plan submission per plan (+$30 per plan supplement or re-review), PLUS per-system plan review fees (a separate fee for each fire-protection system reviewed, even if in one submitted plan — e.g., new automatic fire sprinkler system $375 under 10,000 sq ft / $450 for 10,000–50,000 sq ft plus $450 per additional 50,000 sq ft and $200 per floor above/below ground level; new fire alarm system $225–$500 by area; new fire pump $250 first/$150 each additional; underground fire line/hydrants $300 up to 500 lineal ft; clean-agent/dry-chemical extinguishing system $200 up to 5,000 sq ft; hood extinguishing system $150 new/$75 modification; standpipes $200 up to four), PLUS permit issuance fees of $30 per fire-protection system permitted; most specialty permits (underground/above-ground fuel tanks, pyrotechnics, special-event tents, hydrogen fuel cell, fair/trade show, explosives storage, compressed gases, cryogens, LPG tanks) $164 each (tire storage $82); re-inspection minimum $164 plus $82 per 25 miles beyond the first 25)
- Fee updated
Unincorporated Greenlee County, Arizona — Commercial Building Permit fee record removed: OSFM plan review / permit fees (state-level)
- Permit type added
Page, Arizona — Commercial Building Permit record added
- Permit type added
Paradise Valley, Arizona — Commercial Building Permit (New Construction, Resort/Hotel, and Tenant Improvement) record added
- Permit type added
Parker, Arizona — Commercial Building Permit record added
- Permit type added
Prescott Valley, Arizona — Commercial Building Permit (New Construction) record added
- Permit type added
Prescott Valley, Arizona — Commercial Tenant Improvement (T.I.) Permit record added
- Permit type added
Prescott, Arizona — Commercial Building Permit (New Commercial & Multi-Family Construction) record added
- Permit type added
Prescott, Arizona — Commercial Tenant Improvement Permit record added
- Permit type added
Quartzsite, Arizona — Commercial Building Permit (New Construction / Improvement / Tenant Improvement) record added
- Permit type added
Wellton, Arizona — Commercial Building Permit (New Construction / Tenant Improvement) record added
- Permit type added
Wickenburg, Arizona — Commercial Building Permit (New Construction) record added
- Permit type added
Wickenburg, Arizona — Commercial Tenant Improvement / Remodel Permit (filed as 'Commercial Remodel/Addition') record added
- Permit type added
Willcox, Arizona — Commercial Building Permit record added
- Permit type added
Unincorporated Doña Ana County, New Mexico — Commercial Building Permit record added
- Permit type added
Unincorporated San Juan County, New Mexico — Commercial Building Permit record added
July 31, 2026
- Fee updated
Silverthorne, Colorado — New Residential Construction Building Permit (SFR Attached and Detached) fee record updated: $0.55 per square foot of impermeable surface → $0.58 per square foot of impermeable surface (new impervious areas over 120 square feet)
- Timeline updated
Youngtown, Arizona — plan-review timeline record updated: 37–37 business days
July 30, 2026
- Timeline updated
Reno, Nevada — plan-review timeline record updated: 10–10 business days
- Fee updated
Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: EV Charger Permit (Non-Valuation Based Permit — Electrical Vehicle Charger) ($150.00 (flat))
- Fee updated
Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: Residential Plan Review Fee (40% of the permit fee)
- Fee updated
Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: State construction surcharge (1% of the permit fee)
- Fee updated
Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: First Reinspection Fee (if required) ($50.00 per trade)
- Fee updated
Sandy, Utah — EV Charger / EVSE Permit fee record updated: Valuation/category-tiered fee — exact base figure not confirmed → $105.00 (flat)
- Fee updated
Evanston, Wyoming — Fire Sprinkler / Fire Alarm Permit fee record updated: Valuation-based per the ICC Valuation Table (Department of Fire Prevention and Electrical Safety Rules, Chapter 2, Section 3) — no flat published dollar figure → Valuation-based plan review fee — $1.00-$499.99: $16.03 | $500.00-$1,999.99: $16.03 for the first $500.00 plus $2.08 per additional $100.00 or fraction | $2,000.00-$24,999.99: $47.22 for the first $2,000.00 plus $9.55 per additional $1,000.00 or fraction | $25,000.00-$49,999.99: $267.12 for the first $25,000.00 plus $6.90 per additional $1,000.00 | $50,000.00-$99,999.99: $438.95 for the first $50,000.00 plus $4.78 per additional $1,000.00 | $100,000.00-$499,999.99: $677.60 for the first $100,000.00 plus $3.82 per additional $1,000.00 | $500,000.00-$999,999.99: $2,204.94 for the first $500,000.00 plus $3.25 per additional $1,000.00 | $1,000,000.00 and up: $3,824.33 for the first $1,000,000.00 plus $2.49 per additional $1,000.00
- Fee updated
Green River, Wyoming — Fire Sprinkler & Fire Alarm System Permit (Wyoming State Fire Marshal's Office) fee record updated: $16.03 for $1.00-$499.99, scaling up per the Department of Fire Prevention and Electrical Safety Rules Chapter 2, Section 3 fee table (e.g., $47.22 for the first $2,000 plus $9.55 per additional $1,000 up to $24,999.99; $267.12 for the first $25,000 plus $6.90 per additional $1,000 up to $49,999.99; continuing up the same valuation-based schedule) → Valuation-based plan review fee — $1.00-$499.99: $16.03 | $500.00-$1,999.99: $16.03 for the first $500.00 plus $2.08 per additional $100.00 or fraction | $2,000.00-$24,999.99: $47.22 for the first $2,000.00 plus $9.55 per additional $1,000.00 or fraction | $25,000.00-$49,999.99: $267.12 for the first $25,000.00 plus $6.90 per additional $1,000.00 | $50,000.00-$99,999.99: $438.95 for the first $50,000.00 plus $4.78 per additional $1,000.00 | $100,000.00-$499,999.99: $677.60 for the first $100,000.00 plus $3.82 per additional $1,000.00 | $500,000.00-$999,999.99: $2,204.94 for the first $500,000.00 plus $3.25 per additional $1,000.00 | $1,000,000.00 and up: $3,824.33 for the first $1,000,000.00 plus $2.49 per additional $1,000.00
- Fee updated
Unincorporated Churchill County, Nevada — Fire Sprinkler / Fire Alarm System Permit fee record updated: E.g., $531.41 for the first $100,000 of project cost plus $2.69 for each additional $1,000, for the $100,000-$500,000 valuation tier → $633.47 for the first $100,000 of project cost plus $3.22 for each additional $1,000 or fraction (over $100,000 and under $500,000 tier). Lower bands run $87.78 ($1-$4,000) up to $633.47 ($99,001-$100,000); $500,000 to under $1,000,000 is $1,931 for the first $500,000 plus $2.84 per additional $1,000; $1,000,000 or more is $3,337.10 for the first $1,000,000 plus $1.65 per additional $1,000.
- Fee updated
Unincorporated Churchill County, Nevada — Fire Sprinkler / Fire Alarm System Permit fee record updated: $55.00 per hour, per reviewer → $66.00 per hour, per person
- Fee updated
Unincorporated Elko County, Nevada — Fire Sprinkler & Fire Alarm Permit fee record updated: Valuation-tiered per NAC 477.750: $73.15 minimum (up to $4,000) scaling up to $531.41 for the first $100,000 plus $2.69 per additional $1,000 up to $500,000; $1,609.41 for the first $500,000 plus $2.37 per additional $1,000 up to $1,000,000; $2,780.91 for the first $1,000,000 plus $1.65 per additional $1,000 above that → $87.78 ($1-$4,000 valuation) rising per $1,000 band — e.g. $136.96 ($9,001-$10,000), $418.57 ($50,001-$51,000), $633.47 ($99,001-$100,000). Over $100,000 and under $500,000: $633.47 for the first $100,000 plus $3.22 per additional $1,000 or fraction. $500,000 or more and under $1,000,000: $1,931 for the first $500,000 plus $2.84 per additional $1,000. $1,000,000 or more: $3,337.10 for the first $1,000,000 plus $1.65 per additional $1,000. Conferences and State Fire Marshal review triggered by a local waiver/variance are billed at $66 per hour per participating person.
- Fee updated
Lander County (including Battle Mountain), Nevada — Fire Sprinkler & Fire Alarm System Permit fee record updated: Example brackets from the statewide NAC 477.750 'Plans Section' fee schedule (revised 02/14/2002): $1–$4,000 valuation: $73.15; $9,001–$10,000: $114.13; $50,001–$51,000: $348.81; $99,001–$100,000: $527.89; $100,000–$499,999: $531.41 for the first $100,000 plus $2.69 per additional $1,000 or fraction thereof; $500,000–$999,999: $1,609.41 for the first $500,000 plus $2.37 per additional $1,000; $1,000,000+: $2,780.91 for the first $1,000,000 plus $1.65 per additional $1,000. A $55/hour per-attendee fee applies if a plan-review conference is required. → $87.78 ($1-$4,000 valuation) rising per $1,000 band — e.g. $136.96 ($9,001-$10,000), $418.57 ($50,001-$51,000), $633.47 ($99,001-$100,000). Over $100,000 and under $500,000: $633.47 for the first $100,000 plus $3.22 per additional $1,000 or fraction. $500,000 or more and under $1,000,000: $1,931 for the first $500,000 plus $2.84 per additional $1,000. $1,000,000 or more: $3,337.10 for the first $1,000,000 plus $1.65 per additional $1,000. Conferences and State Fire Marshal review triggered by a local waiver/variance are billed at $66 per hour per participating person.
- Fee updated
Nye County (Unincorporated, incl. Pahrump), Nevada — Fire Sprinkler & Fire Alarm Permit (Nevada State Fire Marshal Plan Review) fee record updated: Per the NAC 477.750 schedule as codified: for a proposed cost/bid of $100,001-$500,000, $531.41 for the first $100,000 plus $2.69 for each additional $1,000; for $500,001-$1,000,000, $1,609.41 for the first $500,000 plus $2.37 for each additional $1,000; for $1,000,000 and above, $2,780.91 for the first $1,000,000 plus $1.65 for each additional $1,000 (lower graduated tiers apply below $100,000) → $87.78 ($1-$4,000 valuation) rising per $1,000 band — e.g. $136.96 ($9,001-$10,000), $418.57 ($50,001-$51,000), $633.47 ($99,001-$100,000). Over $100,000 and under $500,000: $633.47 for the first $100,000 plus $3.22 per additional $1,000 or fraction. $500,000 or more and under $1,000,000: $1,931 for the first $500,000 plus $2.84 per additional $1,000. $1,000,000 or more: $3,337.10 for the first $1,000,000 plus $1.65 per additional $1,000. Conferences and State Fire Marshal review triggered by a local waiver/variance are billed at $66 per hour per participating person.
- Fee schedule re-verified
Cedar City, Utah — fee schedule re-verified across 2 permit types
- Fee updated
Hobbs, New Mexico — Residential Plumbing Permit fee record added: Domestic Hot Water Heater ($20.00)
- Fee updated
Hobbs, New Mexico — Residential Plumbing Permit fee record added: Radiant Hot Water Heater ($10.00)
- Fee updated
Hobbs, New Mexico — Residential Plumbing Permit fee record added: Roof Drainage System ($10.00)
- Fee updated
Hobbs, New Mexico — Sign Permit fee record added: Sign Permit Fee (valuation-based, Municode 15.28.050 Sign/billboards) ($15.00 (valuation $1.00-$1,000.00) · $30.00 ($1,001.00-$5,000.00) · $50.00 ($5,001.00-$15,000.00) · $65.00 ($15,001.00 and up))
- Fee updated
Hobbs, New Mexico — Sign Permit fee record removed: Sign Permit Fee
- Fee updated
Los Alamos County, New Mexico — Electrical Permit (CID-Administered) fee record added: Customer-Owned Distribution (does not include wiring of a structure) ($45.00 minimum, plus $6.00 per pole or $6.00 per 100 feet of underground)
- Fee updated
Los Alamos County, New Mexico — Plumbing Permit (CID-Administered) fee record added: Each Roof Drainage System ($4.00)
- Fee updated
Los Alamos County, New Mexico — Mechanical / HVAC Permit (CID-Administered) fee record added: Each Steam and Condensate Piping System ($4.00)
- Fee updated
Los Alamos County, New Mexico — Electrical Permit (CID-Administered) fee record updated: $45.00 to $900.00 (tiered by amperage: $45 ≤100A; $72 101-200A; $225 201-400A; $270 401-600A; $360 601-800A; $450 801-1,000A; $630 1,001-2,000A; $900 over 2,000A) → $45.00 to $900.00 (tiered by amperage, quoting the CID schedule's own bracket wording: $45 for 100 Amp Service/Panel and Below; $72 Over 100 Amp Thru 200 Amp; $225 Over 200 Amp Thru 400 Amp; $270 Over 400 Amp Thru 600 Amp; $360 Over 600 Amp Thru 800 Amp; $450 Over 800 Amp Thru 1,000 Amp; $630 Over 1,000 Amp Thru 2,000 Amp; $900 Over 2,000 Amp)
- Fee updated
Mesquite, Nevada — Fire Sprinkler / Fire Alarm Permit fee record updated: Additional fee applies (amount not published) → Hourly rate not published — billed per hour, per person, minimum two (2) hours, including travel time
July 29, 2026
- Permit type added
Colorado River Indian Tribes, Arizona — Commercial Building Permit record added
- Permit type added
Dewey-Humboldt, Arizona — Commercial Building Permit record added
- Permit type added
Douglas, Arizona — Commercial Building Permit record added
- Bulk update
Permit-type records re-verified across 15 jurisdictions
- Permit type added
Duncan, Arizona — Commercial Building Permit (Tenant Improvements Included — Filed Under the General Building Permit) record added
- Permit type added
El Mirage, Arizona — Commercial Building Permit (New Construction, Shell/Grey Buildings, Additions & Alterations) record added
- Permit type added
Eloy, Arizona — Commercial Building Permit record added
- Permit type added
Fort Mojave Indian Tribe, Arizona — Commercial Building Permit record added
- Permit type added
Fountain Hills, Arizona — Commercial Building Permit (New Construction / Tenant Improvements / Additions) record added
- Permit type added
Fredonia, Arizona — Commercial Building Permit (Tenant Improvements Included — Filed Under the General Building Permit) record added
- Permit type added
Gila Bend, Arizona — Commercial Building Permit (New Building — Non-Residential) record added
- Permit type added
Gila Bend, Arizona — Commercial Tenant Improvement Permit record added
- Permit type added
Gila River Indian Community, Arizona — Commercial Building Permit record added
- Permit type added
City of Globe, Arizona — Commercial Building Permit record added
- Permit type added
Flagstaff, Arizona — Commercial Building Permit (New Construction / Addition / Alteration) record added
- Permit type added
Flagstaff, Arizona — Commercial Tenant Improvement (TI) Permit record added
- Permit type added
Florence, Arizona — Commercial Building Permit record added
- Permit type added
Fort McDowell Yavapai Nation, Arizona — Commercial Building Permit (COM-1/COM-2/COM-3 Commercial Construction) record added
- Permit type added
Colorado City, Arizona — Commercial Building Permit record added
- Permit type added
Coolidge, Arizona — Commercial Building Permit record added
- Permit type added
Cottonwood, Arizona — Commercial Building Permit record added
- Permit type added
Cottonwood, Arizona — Commercial Tenant Improvement Permit record added
July 23, 2026
- Codes updated
Aspen, Colorado — adopted-codes record updated
- + Local amendments to all adopted codes are codified in Title 8 (Building and Building Regulations) of the Aspen Municipal Code; Municode's Aspen library is a JavaScript-rendered application that could not be scraped directly in this or the prior session (confirmed again 2026-07-23: raw curl returns only the Angular SPA shell, and the shared browser environment used for the re-chase attempt this session was too unstable to reliably render deep-linked Title pages). However, the City's own 'Currently Adopted Building & Energy Codes' page (aspen.gov/197) directly publishes a 'Climate & Geographical Design Criteria' table (2026-07-23, live-confirmed): Ground snow load 100 psf; Wind Speed/Exposure Category 89 mph / B; Seismic Design Category C; Weathering Severe; Frost line depth 36 inches; Termite None to slight; Decay None to slight; Winter design temp -15°F; Summer design temp 82°F; Ice shield underlayment required Yes; Air Freezing Index 2000; Mean annual temperature 40°F. This resolves the design-criteria gap without needing Title 8/Municode.
- − Local amendments to all adopted codes are codified in Title 8 (Building and Building Regulations) of the Aspen Municipal Code; Municode's Aspen library is a JavaScript-rendered application that could not be scraped directly in this session, so specific structural design values (wind speed, seismic design category, frost depth) beyond the 100 psf ground snow load confirmed in the Roof/Re-Roof Application Checklist were not independently re-verified against Title 8 text itself — see tipsAndGotchas for the chase trail.
- Codes updated
Broomfield, Colorado — adopted-codes record updated
- + Wildland Urban Interface (WUI) Code: a state-mandated model code (Colorado Wildfire Resiliency Code Board) that all Colorado jurisdictions must adopt by March 1, 2026 and enforce by June 1, 2026 (both deadlines confirmed on the City's dedicated 'Broomfield Voice' WUI project page, itself last updated 2026-04-15). The City's Building Division page still carries unchanged 2025-vintage text (re-fetched live 2026-07-23, identical to the 2026-07-18 and 2026-07-03 captures) stating Broomfield had not yet held its adoption hearing and was not expected to consider adoption until early 2026. The dedicated Broomfield Voice WUI page (also re-fetched live 2026-07-23, unchanged since its 2026-04-15 update) is more current and explicit: as of its last update the Wildfire Resilience Code 'has not been adopted by Broomfield,' hearing dates are 'not yet set,' and adoption-ordinance readings 'are not anticipated to occur until the second half of 2026.' Both the March 1, 2026 statewide adoption deadline and the June 1, 2026 enforcement deadline have now passed with no adoption on record on either page — Broomfield's WUI code is not yet in effect as of today. Confirm current status directly with the Building Division before relying on it. Source: City and County of Broomfield Building Division page, 'Wildland Urban Interface Code' notice; City of Broomfield ('Broomfield Voice'), '2025 Colorado Wildfire Resiliency Code' project page and its 'Key Dates' tab.
- − Wildland Urban Interface (WUI) Code: a state-mandated model code (Colorado Wildfire Resiliency Code Board) that all Colorado jurisdictions must adopt to at least the state model's requirements by March 1, 2026; the City's Building Division page carries unchanged 2025-vintage text (re-fetched live 2026-07-18, identical to the 2026-07-03 capture, and itself referencing a '2025 Colorado Wildfire Resiliency Code Broomfield Voice page') stating Broomfield had not yet held its adoption hearing and was not expected to consider adoption until early 2026, with a public hearing still pending. The March 1, 2026 statewide deadline has now passed with no page update — this notice reads as stale but no superseding adoption notice was found on the same page. Confirm current status directly with the Building Division before relying on it. Source: City and County of Broomfield Building Division page, 'Wildland Urban Interface Code' notice.
- Fee schedule re-verified
Broomfield, Colorado — fee schedule re-verified across 9 permit types
- Timeline updated
Broomfield, Colorado — plan-review timeline record updated: 49–56 business days
- Timeline updated
Broomfield, Colorado — plan-review timeline record updated: 49–56 business days
- Timeline updated
Broomfield, Colorado — plan-review timeline record updated: 49–56 business days
- Fee updated
Driggs, Idaho — Residential Building Permit fee record added: Development Impact Fees — Parks & Recreation (per dwelling unit, under 500 sq ft) ($418)
- Fee updated
Driggs, Idaho — Residential Building Permit fee record added: Development Impact Fees — Transportation/Streets (per dwelling unit, under 500 sq ft) ($1,748)
- Fee updated
Driggs, Idaho — Residential Building Permit fee record removed: Development Impact Fees — Parks (per dwelling unit, one bedroom/studio)
- Fee updated
Driggs, Idaho — Residential Building Permit fee record removed: Development Impact Fees — Transportation/Streets (per dwelling unit, one bedroom/studio)
- Fee updated
Gallup, New Mexico — Residential Building Permit (New Construction) fee record updated: GENUINELY UNPUBLISHED as of lastVerified — the City's transition notice (posted June 8, 2026) announces the new Site Development Permit but the City had not yet published a specific fee schedule/amount for this new permit type as of this review; the pre-transition Resolution R2004-40 Zoning Check Fee ($15 residential / $25 commercial) governed the zoning-review component of the old process and may inform (but does not confirm) the new fee → Valuation-based per Resolution No. R2004-40: $15.00 minimum for $1-$500 valuation, scaling to $3,539.50 for the first $1,000,000 plus $2.00 per additional $1,000; plus a Plan Check Fee (75% new commercial / 55% commercial additions-remodels under $50,000 / 45% residential) and a Zoning Check Fee ($25 commercial / $15 residential)
- Fee updated
Gallup, New Mexico — Residential Addition / Alteration / Remodel Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — see residential-building-permit fee notes for avenues exhausted → Valuation-based per Resolution No. R2004-40 (same schedule as residential-building-permit entry: $15.00 minimum for $1-$500 valuation up to $3,539.50 for the first $1,000,000 plus $2.00 per additional $1,000, plus Plan Check Fee 45% residential/55-75% commercial and Zoning Check Fee $15 residential/$25 commercial)
- Fee updated
Gallup, New Mexico — Residential Solar Photovoltaic (PV) Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified → Valuation-based per Resolution No. R2004-40 (see residential-building-permit entry for the full fee table)
- Fee updated
Gallup, New Mexico — Fence Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — Resolution No. R2004-40 (the City's pre-transition fee schedule) sets a general valuation-based building-permit fee table ($15.00 minimum for $1-$500 valuation) that historically applied to fence permits as a City-issued 'building permit' category, but the City's current published Fee Schedule page (gallupnm.gov/338/Fee-Schedule) does not show building/fence permit fees (it displays unrelated Fitness Center rates), and no updated fee notice specific to fence permits under the post-July-2026 structure was located → Valuation-based per Resolution No. R2004-40: $15.00 minimum for $1-$500 valuation, scaling per the same schedule cited on the residential-building-permit entry
- Fee updated
Gallup, New Mexico — Sign Permit fee record updated: GENUINELY UNPUBLISHED as of lastVerified — no current fee schedule for sign permits was located on the City's Fee Schedule page (338, which shows unrelated Fitness Center rates), Building Permits pages, or the FAQ page → Valuation-based, set by City Resolution (No. R2004-40) per the sign permit's own application instructions; no separate flat fee schedule specific to signs was located
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Timeline updated
Gallup, New Mexico — plan-review timeline record updated: 3–4 business days
- Codes updated
Holbrook, Arizona — adopted-codes record updated
- + The City of Holbrook's own published Fee Schedule (adopted November 15, 2025, superseding the September 1, 2025 edition; figures unchanged between the two) states that Building Permit Fees (Commercial/Residential/New/Remodel/Accessory Building) and the Residential Solar System Fee are calculated 'based on IBC/UBC Building Data-IRC 2018 Charts and Formulas,' confirming the 2018 edition of the ICC family of codes (International Building Code / International Residential Code) is the City's current operative code basis for permit valuation. Source: City of Holbrook Fee Schedule, adopted November 15, 2025 (Section 2-1, Section 2-3).
- + CONFIRMED 2026-07-23 via live-rendered Municode session (the platform is a JavaScript SPA that returns an empty shell to non-browser requests, but renders fully in a real browser): Holbrook City Code Chapter 5 (Building and Construction), Article 5-2 'Uniform Codes,' was repealed and re-enacted in its entirety by Ordinance No. 25-01, § 1 (adopted January 22, 2025) — replacing the former Art. 5-2 (§§ 5-2-1—5-2-13), which had derived from Ordinance 10-11, Ordinance 11-11, and Ord. No. 24-03, § 1 (adopted May 22, 2024). As codified (Supp. No. 2, Update 1, online content updated February 19, 2026; codified through Ordinance No. 25-09, enacted December 10, 2025), Article 5-2 adopts by reference: § 5-2-1 the 1997 Uniform Code for the Abatement of Dangerous Buildings; § 5-2-2 the 2018 International Building Code (IBC), including Appendix J (Grading) and Appendix K (Administrative Provisions — Mechanisms for Enforcement of NFPA 70 National Electrical Code); § 5-2-3 the 1997 Uniform Code for Building Conservation; § 5-2-4 the 2017 edition of the National Electrical Code (NOT 2018 — this is the one code title in the chapter on an older edition year than the rest); § 5-2-5 the 2018 edition of the NFPA Fire Code; § 5-2-6 the 2018 International Fuel Gas Code (IFGC); § 5-2-7 the 2018 International Mechanical Code (IMC); § 5-2-8 the 2018 International Residential Plumbing Code (the codified section title, verbatim); and § 5-2-9 the 2018 International Residential Code (IRC), including Appendices A, B, G, H, J, L, M, P, and Q. Chapter 5 also contains Article 5-1 'Permits and Fees' (§ 5-1-1: a building/construction permit is required whenever the cost of construction, remodeling, or improvement exceeds $1,000, excepting floor/wall-covering replacement, window replacement, roofing, and painting — Ordinance 10-11; § 5-1-4: permit fees are set from time to time by council resolution, i.e. the Fee Schedule) and Article 5-3 'Drainage and Retention Criteria' (stormwater/grading design criteria, unrelated to permit fees or code editions). No climatic/geographic design-criteria table (wind speed, seismic design category, etc.) or plan-review turnaround-time language exists anywhere in Chapter 5's text. Ordinances subsequent to 25-09 (No. 26-01 and No. 26-02, both adopted May 13, 2026) amend Chapter 6 and Chapter 3 respectively — neither touches Chapter 5, so the code editions above remain the most current. Source: Holbrook, AZ Municode Library, Chapter 5 — Building and Construction (library.municode.com/az/holbrook/codes/city_code?nodeId=CH5BUCO), live-rendered 2026-07-23.
- − The City of Holbrook's own published Fee Schedule (effective September 1, 2025) states that Building Permit Fees (Commercial/Residential/New/Remodel/Accessory Building) and the Residential Solar System Fee are calculated 'based on IBC/UBC Building Data-IRC 2018 Charts and Formulas,' confirming the 2018 edition of the ICC family of codes (International Building Code / International Residential Code) is the City's current operative code basis for permit valuation as of the fee schedule's effective date. Source: City of Holbrook Fee Schedule, effective September 1, 2025 (Section 2-1, Section 2-3).
- − The City's Chapter 5 (Building and Construction) of the Holbrook City Code, hosted on Municode Library, is the presumed formal adoption vehicle for the specific ICC code titles (IBC, IRC, IMC, IPC, IFGC, NEC) and any local amendments, but the underlying ordinance text could not be directly retrieved: Municode's platform is a JavaScript single-page application that returns only an empty page shell to automated/non-browser HTTP requests (repeatedly confirmed via direct fetch and via a realistic desktop browser User-Agent), its authenticated content API returned HTTP 401 to unauthenticated requests, and no Wayback Machine snapshot of the rendered chapter (nodeId=CH5BUCO) exists. The City's own live codification history shows the most recent full recodification was Ordinance No. 25-09 (enacted December 10, 2025), with subsequently identified amendments limited to Chapter 6 (Planning and Zoning) and Chapter 3 (Public Health and Safety/animal control) — no Chapter 5 (Building and Construction) amendment was identified in that update cycle, consistent with the Fee Schedule's 2018 IRC reference remaining current through at least September 2025. Source: Holbrook, AZ Municode Library index (library.municode.com/az/holbrook/codes/city_code) and City of Holbrook City Code page (holbrookaz.gov/government/city-code/).
- − Because the specific IBC/IRC/IMC/IPC/IFGC/NEC edition years and any City-specific local amendments (climatic/geographic design criteria, wind speed, seismic design category, mandatory-AC-style provisions, permit exemptions, etc.) could not be independently confirmed beyond the Fee Schedule's '2018 IRC' reference, this file does not assert specific section-by-section code adoption citations of the kind available for larger Arizona cities with fully browser-accessible ordinance text (e.g., Buckeye). As of July 2026, the City of Holbrook does not appear to publish a standalone 'Building and Life Safety Codes Update' document of the kind larger cities publish; the only verifiable, City-sourced statement of code edition is the Fee Schedule's 2018 IRC/IBC reference. For binding, section-level code text, contact the Building Department directly at 928-524-6225 or rtissaw@holbrookaz.gov, or consult the Holbrook City Code, Chapter 5 (Building and Construction) directly via library.municode.com/az/holbrook/codes/city_code?nodeId=CH5BUCO using a JavaScript-capable browser.
- Fee updated
Kaysville, Utah — Demolition Permit fee record updated: $200 per structure demolition (or manufactured home set in a manufactured home park) → $200 (UNCONFIRMED as of 2026-07-23 — see note)
- Fee updated
St. George, Utah — Residential Building Permit fee record updated: $391.75 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000 → $391.25 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000
- Fee updated
St. George, Utah — Commercial Building Permit fee record updated: $1–$500: $23.50. $501–$2,000: $23.50 for the first $500 plus $3.05 per additional $100 or fraction, to and including $2,000. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 per additional $1,000 or fraction, to and including $25,000. $25,001–$50,000: $391.75 for the first $25,000 plus $10.10 per additional $1,000 or fraction. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 per additional $1,000 or fraction. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 per additional $1,000 or fraction. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 or fraction. $1,000,001 and up: $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000 or fraction. → $1–$500: $23.50. $501–$2,000: $23.50 for the first $500 plus $3.05 per additional $100 or fraction, to and including $2,000. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 per additional $1,000 or fraction, to and including $25,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 per additional $1,000 or fraction. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 per additional $1,000 or fraction. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 per additional $1,000 or fraction. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 or fraction. $1,000,001 and up: $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000 or fraction.
- Permit type added
Eagar, Arizona — Sign Permit record added
- Permit type added
Eagar, Arizona — Fire Sprinkler / Fire Alarm Permit (via Commercial or Residential Building Permit) record added
- Permit type added
Eagar, Arizona — Change of Use (via Commercial Building Permit) -- No Distinct Certificate of Occupancy Product record added
- Permit type added
El Mirage, Arizona — Commercial Sign Permit (Wall, Monument/Pylon, Awning, Temporary Banner) record added
- Permit type added
El Mirage, Arizona — Fire Sprinkler System & Fire Alarm System Permit record added
- Permit type added
El Mirage, Arizona — Certificate of Occupancy / Change of Occupancy Permit (Commercial & Tenant Improvement) record added
- Permit type added
Eloy, Arizona — Sign Permit record added
- Permit type added
Eloy, Arizona — Fire Sprinkler & Fire Alarm Permit (Eloy Fire District) record added
- Permit type added
Eloy, Arizona — Certificate of Occupancy / Change of Occupancy record added
- Permit type added
Flagstaff, Arizona — Fire Sprinkler & Fire Alarm System Permit record added
- Permit type added
Flagstaff, Arizona — Change of Occupancy / Certificate of Occupancy record added