July 23, 2026

  • Codes updated

    Federal Heights, Colorado — adopted-codes record updated

    • + 2018 International Fuel Gas Code (IFGC), including appendices A, B and C — DRIFT FIX 2026-07-23: prior entry incorrectly said '2021 IFGC'; the actual text of Ordinance 23-02 §1(6) (verified directly against the ordinance PDF via Municode) and the current Municode codification (Sec. 10-16(6), Supp. 42, online content updated May 28, 2026) both read 'International Fuel Gas Code, 2018 Edition' — Federal Heights retained the 2018 IFGC alongside the 2018 IECC rather than elevating it to 2021 with the rest of the 2021-cycle codes in Ordinance 23-02
    • 2021 International Fuel Gas Code (IFGC), amended — Ordinance 23-02
  • Fee updated

    Frederick, Colorado — Demolition Permit fee record updated: Amount not itemized as a standalone line in the accessible portion of the 2026 Fee Schedule; the schedule lists a 'Demolition of Structure' heading immediately preceding the Foundation Only Permit Fee entry but the specific dollar figure was not legible in the extracted text → $200.00

  • Codes updated

    Garden City, Colorado — adopted-codes record updated

    • + 2024 International Building Code (IBC), as adopted by reference with local amendments — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025
    • + 2024 International Residential Code (IRC), as adopted by reference with local amendments — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025
    • + 2024 International Mechanical Code (IMC), as adopted by reference with local amendments — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025
    • + 2024 International Fuel Gas Code (IFGC), as adopted by reference with local amendments — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025
    • + 2024 International Plumbing Code (IPC), as adopted by reference with local amendments — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025
    • + 2024 International Energy Conservation Code (IECC) — UPDATED 2026-07-23: Ordinance No. 11-2025 adopts the FULL 2024 IECC by reference (with local amendments to R402.5.1.3 air-leakage testing — 3 ACH50 detached / 5 ACH50 attached — and R403.3.7 duct-leakage testing), superseding the prior 2020-era ordinance's deletion of IRC Chapter 11 in favor of the 2012 IECC. The prior file version's '7 air changes per hour' IRC R303.4 mechanical-ventilation amendment was searched for in the full text of Ordinance 11-2025 and NOT found — it does not appear to carry forward into the current adopted energy code; treated as superseded rather than re-asserted.
    • + 2024 International Property Maintenance Code (IPMC), as adopted by reference with local amendments — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025; IPMC Section 604.2 still replaces 'NFPA 70' with 'Electrical Code adopted by the State of Colorado' (unchanged from the prior ordinance)
    • + 2024 International Existing Building Code (IEBC), as adopted by reference with local amendments — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025
    • + 2024 International Swimming and Spa Code (ISPSC), adopted by reference — UPDATED 2026-07-23: superseded the 2018 edition via Ordinance No. 11-2025
    • + Colorado Model Electric and Solar Ready Code, 2023 Edition, adopted by reference via Ordinance No. 11-2025 (NEW 2026-07-23 finding) — this appears to be Garden City's HB22-1362-triggering energy-code update (see localAmendments note on HB22-1362 below)
    • + Colorado Wildfire Resiliency Code, 2025 Edition, adopted by reference via Ordinance No. 11-2025 (NEW 2026-07-23 finding)
    • + National Electrical Code (NEC), 2017 Edition, CORRECTED 2026-07-23: Garden City DOES maintain its own locally-codified Electrical Code — Municipal Code Chapter 18, Article 3, Section 18-3-10 — adopted by reference via Ordinance No. 04-2020 ('AN ORDINANCE ADOPTING BY REFERENCE THE NATIONAL ELECTRIC CODE, 2017 EDITION'), effective October 15, 2020, and re-codified without a base-edition change by Ordinance No. 04-2023 (May 2, 2023). Both ordinances build in an auto-update float: 'The effective edition shall be replaced by subsequent edition(s) of the National Electrical Code adopted by the State of Colorado Electrical Board... and such subsequent editions shall be effective one (1) year after' state adoption. This CORRECTS the prior version of this file, which incorrectly stated Garden City 'has not adopted its own local NEC edition' based solely on the IPMC 604.2 cross-reference to 'Electrical Code adopted by the State of Colorado' — that IPMC phrase does not negate the Town's own codified Chapter 18 Article 3 NEC adoption. What remains true and unchanged: Garden City has NOT established its own local electrical CONTRACTOR licensing board — contractor licensure still runs through the Colorado State Electrical Board (DORA), consistent with the Contemporaneous Review procedure documented elsewhere in this file. Sources: https://www.townofgardencity.com/files/3e62c10e8/ordinance-04-2020-2017-national-electric-code.pdf.pdf and https://www.townofgardencity.com/files/3d5c2fc4d/ordinance-04-2023-ordinance-amending-electrical-code.pdf.pdf
    • + Source: Ordinance No. 11-2025 ('AN ORDINANCE ADOPTING BY REFERENCE THE INTERNATIONAL BUILDING CODE, 2024 EDITION...'), read and introduced November 18, 2025, public hearing December 9, 2025, passed and adopted, signed and approved December 9, 2025, effective 30 days after publication (i.e., on or about early January 2026) — repeals Ordinance No. 02-2020 and any amendments thereto in their entirety. Confirmed live on the Town's own site (https://www.townofgardencity.com/files/18063c2b6/Ordinance+11-2025+International+Building+Code.pdf) as of 2026-07-23, listed on the Town's Ordinances and Resolutions page. This is now the governing code-adoption ordinance; Ordinance No. 02-2020 (2018-edition cycle) is retained in individual permitType `sources` arrays below only as superseded historical reference where still cited. Local-amendment SUBSTANCE (climatic/geographic design table values, sewer/gas-piping depths, gas test pressure, CO-detector distance, foundation/soils-report requirement, R309 residential fire-sprinkler deletion, deck/retaining-wall/shingle permit-exempt thresholds) was diffed against the new ordinance's full text and found IDENTICAL in substance; only code-section numbers shifted with the 2024 ICC renumbering in a few places (documented inline below where it affects a citation). HB22-1362's statewide model energy/low-carbon code requirement now DOES appear to have been triggered and satisfied — see the Colorado Model Electric and Solar Ready Code, 2023 Edition entry above and the dated HB22-1362 note in localAmendments.
    • 2018 International Building Code (IBC), as adopted by reference with local amendments
    • 2018 International Residential Code (IRC), as adopted by reference with local amendments
    • 2018 International Mechanical Code (IMC), as adopted by reference with local amendments
    • 2018 International Fuel Gas Code (IFGC), as adopted by reference with local amendments
    • 2018 International Plumbing Code (IPC), as adopted by reference with local amendments
    • 2012 International Energy Conservation Code (IECC) — NOTE: Garden City's 2020 code-adoption ordinance explicitly adopts the 2012 IECC edition (not 2018), and further amends IRC Chapter 11 (Energy Efficiency) by deleting it in its entirety and replacing it with the 2012 IECC. This is an older energy-code edition than most Front Range peers in this corpus.
    • 2018 International Property Maintenance Code (IPMC), as adopted by reference with local amendments
    • 2018 International Existing Building Code (IEBC), as adopted by reference with local amendments
    • 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference with no local amendments
    • Electrical work is governed by the electrical code adopted by the State of Colorado (the Town's own IPMC amendment to Section 604.2 explicitly replaces the referenced 'NFPA 70' with 'Electrical Code adopted by the State of Colorado' rather than a locally-adopted NEC edition), consistent with Garden City deferring electrical licensing/code authority to the state rather than adopting its own NEC edition.
    • Source: Ordinance No. 02-2020 ('AN ORDINANCE ADOPTING BY REFERENCE THE INTERNATIONAL BUILDING CODE, 2018 EDITION...'), read and introduced March 3, 2020, passed and adopted April 7, 2020, effective 12:01 a.m. June 1, 2020, repealing and replacing prior code-adoption provisions of Ordinance No. 03-2016. This is the most recent code-adoption ordinance found after full search of the Town's Ordinances and Resolutions archive and Municode; no more recent adoption ordinance (e.g., updating to a 2021/2024 ICC cycle) was located as of this review, and HB22-1362's statewide model energy/low-carbon code requirements (which apply prospectively when a jurisdiction next updates its energy code) do not appear to have yet been triggered by any subsequent Garden City ordinance found in this search.
  • Codes updated

    Holyoke, Colorado — adopted-codes record updated

    • + RE-CHASE 2026-07-23 — GAP CLOSED: Municode's Holyoke, CO library (library.municode.com/co/holyoke), previously returning 401/403 to automated tools, loaded successfully via a live browser session on this pass. The Holyoke Municipal Code, Title 15 - BUILDINGS AND CONSTRUCTION, is codified as Supplement 2, 'Online content updated on December 13, 2024,' 'Codified through Ordinance No. 1-2024, enacted September 17, 2024.' Holyoke has adopted, by reference, as its own local code (each chapter states a certified copy is on file with the city clerk): International Building Code, 2018 edition, incl. appendices C/E/I/J (Sec. 15.04.010); International Residential Code, 2018 edition (Sec. 15.08.010); International Mechanical Code, 2018 edition, incl. appendix A (Sec. 15.12.010); International Fire Code, 2018 edition, incl. appendices B/C/D/I (Sec. 15.16.010); International Energy Conservation Code, 2018 edition (Sec. 15.20.010); International Existing Building Code, 2018 edition (Sec. 15.22.010); 'the most recent edition of the Colorado Plumbing Code as adopted by the state plumbing board' as the city's own Plumbing Code, no fixed year — floats to whatever edition the state plumbing board currently has in effect (Sec. 15.24.010); and the National Electrical Code, 2017 edition, 'as adopted by the state' (Sec. 15.26.010). Quoted directly from the live Municode page.
    • + Local modifications on file (2026-07-23 re-chase): IBC 2018 Sec. 101.1 retitled 'Building Code of the City of Holyoke'; Sec. 103 deleted; Sec. 105.2 (Work Exempt from Permit) amended so 'fences not over six feet, three inches high' and 'retaining walls...not over four feet' are REMOVED from the exempt list (i.e., these now DO require a permit; see chapter 17.28 for fencing). IRC 2018 Sec. 101.1 retitled 'Residential Code of the City of Holyoke'; Sec. 104.10.1 (Flood Hazard Areas) deleted; Sec. 105.2 amended — exempt from permit: one-story detached accessory structures ≤120 sq ft; and 'decks not exceeding 120 square feet in area, that are not more than 18 inches above grade at any point, are not attached to a dwelling and do not serve the exit door required by section R311.4'; also exempt: like-for-like window/door replacement with no framing change; Sec. R313 (Automatic Fire Sprinkler Systems) deleted; Sec. N1102.4.1.2 (Testing) deleted. IMC 2018 Sec. 106.2 amended to exempt like-for-like category-one furnace/water-heater and A/C replacement (R-3 occupancies, prior install permitted/inspected/approved) from a new permit, and adds 'Sec. 106.5.2 Fee schedule. Fees for any permit, plan review or inspection required by this code shall be established from time to time by resolution of the city council' (confirms the fee-setting MECHANISM — a standalone council resolution, not a codified table — while the dollar figures themselves remain unpublished online; see the fee-schedule note below). IFC 2018 and IECC 2018 each retitled to the City of Holyoke's name in Sec. 101.1/C101.1 with no other substantive local modification noted.
    • + HB22-1362 (Colorado's statewide low-energy/carbon code requirement) and its predecessor HB19-1260 both operate on a 'when a jurisdiction updates its building code, the energy code update must accompany it' trigger — neither is a blanket mandate independent of a local update, and neither contains a population-based exemption threshold. The 2026-07-23 re-chase confirms the IECC edition currently on Holyoke's books is 2018 (not a newer low-energy cycle), but it could NOT establish exactly when Title 15's ICC chapters were last substantively enacted/updated: none of the Sec. 15.04.010 through 15.26.010 adoption sections carry an inline '(Ord. No. ___, ____)' legislative-history citation in the Municode text (unlike, e.g., the Mobile Home chapter at Sec. 15.28.010, which cites 'Ord. No. 5-1975'), and the code's front-matter 'codified through Ordinance No. 1-2024' banner reflects the single most-recent ordinance affecting ANY part of the whole Municipal Code, not necessarily Title 15 specifically. Whether HB22-1362 currently binds Holyoke therefore remains genuinely unresolved after this chase — recorded as such, not assumed either way — though it is now pinned down that whatever cycle IS in force is the 2018 ICC family, a materially more precise fact than the prior 'no edition found' state.
    • + RE-CHASE 2026-07-23 — GAP CLOSED (supersedes the DORA-vs-city ambiguity flagged in the prior 2026-07-06 pass): Holyoke Municipal Code Title 15 contains the City's OWN codified Electrical Code chapter (Sec. 15.26.010, adopting NEC 2017 'as adopted by the state,' expressly 'to provide for the issuance of permits and collection of fees therefor') and Plumbing Code chapter (Sec. 15.24.010, adopting by reference the state plumbing board's current Colorado Plumbing Code 'as the plumbing code of the CITY... providing for the issuance of permits and collection of fees therefor'). Both are codified as the City's own local ordinances under Title 15 - Buildings and Construction (footnoted to C.R.S. § 31-15-601 et seq., municipal building/fire-regulation power, and C.R.S. § 31-16-202, authority to adopt codes by reference) — not merely descriptive cross-references to a separate state process. This directly corroborates, on a live primary legal source, the City's own Forms & Documents page listing 'wiring' and 'plumbing' among its administered Building Department permit types, and as a home-rule municipality Holyoke has independent authority to run its own electrical/plumbing permitting program regardless of whether DORA's 'no state inspections in these counties' list includes Phillips County — that DORA list concerns default authority over UNINCORPORATED county land, not an incorporated home-rule city's own adopted code. Electrical and plumbing permits in Holyoke are therefore treated in this file as CITY-issued (City of Holyoke Building Department), under Secs. 15.26.010 and 15.24.010 respectively — not State of Colorado (DORA) issued. Remaining open, NOT resolved by the ordinance text: whether the City's own staff performs the physical inspections in-house or engages a state-certified/contract inspector — an operational detail the ordinance does not address.
    • + Fee-schedule mechanism CONFIRMED via primary ordinance text (2026-07-23), even though the dollar figures remain unpublished online: IMC Sec. 106.5.2 ('Fees...shall be established from time to time by resolution of the city council'); Zoning Sec. 17.44.050, Building permit—Fee ('A fee for the examination and administration of a building permit shall be payable to the city upon receipt of the application. The fee shall be as set from time to time by action of the city council and set out in the fee schedule.'); and the Mobile Home Regulations chapter, which repeatedly references applicants paying 'a fee in an amount set out in the consolidated fee schedule' (Secs. 15.28.040, 15.28.090). All three confirm Holyoke fees are set by a standalone CITY COUNCIL RESOLUTION establishing a 'consolidated fee schedule' — a document that is NOT part of the codified ordinances Municode publishes and was not located published online after this re-chase: checked the live city_council.php and city_clerk.php pages (no agendas/minutes/resolutions posted), ran a fresh Wayback Machine CDX index of the entire cityofholyoke-co.gov domain (562 archived URLs, filtered for fee/resolution/schedule/budget/council/minutes/agenda — the only hit was an unrelated 'Records Request Fees Schedule.pdf,' a CORA records-request fee document, not a building-permit fee schedule), and a live web search for 'City of Holyoke Colorado fee schedule resolution building permit' (returned only the already-flagged wrong-jurisdiction holyoke.org Massachusetts site plus unrelated other-Colorado-jurisdiction fee schedules). The consolidated fee schedule is confirmed to exist as a real governing document by council resolution, but its actual dollar figures remain genuinely unrecoverable via public online sources as of this pass.
    • No specific adopted building code edition (e.g., a numbered IBC/IRC year) could be found published anywhere on the City of Holyoke, CO website, in its Forms & Documents Building Department document center, in its downloadable permit applications, or in its Municipal Ordinances page (which links out to Municode's Holyoke, CO library at library.municode.com/co/holyoke, but that library's actual code text is served through an authenticated Angular/API-driven interface that returned 401/403 to both automated fetch and direct API queries — the ordinance text itself could not be retrieved through any available channel after multiple chase attempts, including a same-origin-style browser User-Agent request and direct Municode API endpoints).
    • The city's own downloadable 'Building Guides' (Addition, Basement, Garage, Patio Covers/Carport, Roof, Uncovered Decks, Enclosing Patio — bilingual English/Spanish, all dated 8/30/03 in the PDF footer) are generic templates published by the 'Colorado Chapter of the International Conference of Building Officials' (ICC Colorado Chapter, P.O. Box 961, Arvada CO 80001) as a 'basic plan submission under the International Residential Code' — they reference 'el I.R.C.' (the IRC) generically and cite IRC Table R404.1.1(2) for crawlspace reinforcement, but never name a specific code YEAR/edition. This is the same generic statewide building-guide series used by many small Colorado jurisdictions and does not by itself establish which edition Holyoke has locally adopted.
    • The 2020 Building Permit Application and 2020 Re-siding/Re-roofing/Soffit Permit Application (the city's own downloadable PDF forms) likewise contain no code-edition citation; they reference only 'laws and ordinances governing this type of work' generically and require a 180-day permit expiration (work must commence within 180 days or the permit becomes null and void).
    • Given the complete absence of any publicly accessible adopted-code-edition citation after chasing the city website, its full document center, its Municipal Ordinances page, Municode (blocked), and multiple web searches for 'Holyoke Colorado' + specific IBC/IRC edition years, this file does NOT assert a specific adopted code edition. It is plausible (consistent with a real pattern already documented elsewhere in this corpus, e.g. Burlington, CO) that Holyoke has not formally re-adopted a current-cycle IBC/IRC/IECC and instead administers permitting under long-standing general ordinances plus the 2003-era ICC Colorado Chapter building-guide program — but this could not be confirmed as fact, so codesAdopted is left honestly incomplete rather than invented.
    • HB22-1362 (Colorado's statewide low-energy/carbon code requirement) and its predecessor HB19-1260 (statewide IECC-adoption trigger) BOTH operate on a 'when a jurisdiction updates its building code, the energy code update must accompany it' trigger — neither law imposes a blanket energy-code mandate independent of a local code update, and neither law contains a population-based municipal exemption threshold (a prior premise assuming a flat 2,500-population exemption was confirmed WRONG in the task brief; that threshold belongs to SB25-141, a bill that was never enacted, and this file does not repeat that error). Since no evidence was found that Holyoke has recently updated its building code (its published building-guide materials and permit forms date to 2003-2020 with no visible current-cycle code citation), this file cannot honestly assert that Holyoke is either bound by or exempt from HB22-1362's energy-code floor — that status is recorded as unresolved after full chasing, not assumed either way.
    • Electrical and Plumbing permitting authority: the Colorado Division of Professions and Occupations (DORA), State Electrical Board and State Plumbing Board, publish an official FAQ list titled 'NO STATE ELECTRICAL INSPECTIONS IN THESE COUNTIES' and 'NO STATE PLUMBING INSPECTIONS IN THESE COUNTIES' (dora.state.co.us/pls/real/ep_web_faq_gui.show_page, retrieved directly) — these are the Colorado counties that have requested and run their OWN local electrical/plumbing inspection programs, so the State Boards do NOT issue permits there. Phillips County does not appear on EITHER list (the electrical list is: Arapahoe, Eagle, Pueblo, Boulder, El Paso, Routt, Broomfield, Jefferson, Summit, Chaffee, Douglas, Teller, Denver, Adams, Weld, Pitkin; the plumbing list is: Adams, Douglas, La Plata, Rio Blanco, Arapahoe, Eagle, Lake, Routt, Baca, El Paso, Larimer, San Juan, Boulder, Elbert, Mesa, Rio Grande, Broomfield, Garfield, Moffat, Summit, Chaffee, Gilpin, Pueblo, Teller, Cheyenne, Grand, Denver, Jefferson, Clear Creek, Jackson, Pitkin, Weld). This means Phillips County — and Holyoke within it — defaults to STATE-issued electrical and plumbing permits (Colorado State Electrical Board / State Plumbing Board, DORA) UNLESS Holyoke independently runs its own certified local inspection program that opted out at the city (not county) level. No evidence of a Holyoke-specific local electrical or plumbing inspection program was found anywhere on the city's website (the city's Electric Department page describes only its municipal electric utility/power-line service since 1909, with no mention of an inspection program, permitting, or licensing function). The city's own Re-siding/Re-roofing/Soffit and general Building Permit applications include a generic 'License: Class/No./Exp.' field without specifying state vs. local licensure. Based on the DORA county-list evidence and absence of any Holyoke-specific electrical/plumbing inspection program on the city's site, electrical and plumbing permits for Holyoke are treated in this file as issued by the State of Colorado (DORA State Electrical Board / State Plumbing Board), not the City Building Department — noted as partial confidence given the city's own materials do not explicitly confirm this deferral in writing.
  • Fee updated

    Holyoke, Colorado — Electrical Permit fee record added: Electrical Permit Fee (null)

  • Fee updated

    Holyoke, Colorado — Plumbing Permit fee record added: Plumbing Permit Fee (null)

  • Fee updated

    Holyoke, Colorado — Electrical Permit fee record removed: State Electrical Permit Fee

  • Fee updated

    Holyoke, Colorado — Plumbing Permit fee record removed: State Plumbing Permit Fee

  • Fee updated

    Hudson, Colorado — Plumbing Permit fee record added: One Stop Permit — Sanitary Sewer/Water Repair (Variable (billed under the general valuation-based Building Permit Fee; no flat dollar figure published for this category, unlike Hot Water Heater Replacement/Reroof))

  • Fee updated

    Pueblo, Colorado — Residential Building Permit (New Construction) fee record added: New Residence — Finished Existing Basement ($19.50 per square foot)

  • Codes updated

    Cocopah Indian Tribe, Arizona — adopted-codes record updated

    • + Re-chased exhaustively 2026-07-23 via genuinely new avenues beyond cocopah.com: Cocopah Indian Housing and Development (CIHAD) -- the Tribe's separate housing authority, established by Tribal Ordinance per its own published Tribal Housing Code -- was located as a distinct department on the Tribe's live Departments page, operating its own website (cocopahcihad.org, serving the same content as ontherez.org) with its own Document Library. CIHAD's published 'Property Management Policies and Procedures' manual (dated 1-31-2007, live and current on CIHAD's Document Library as of 2026-07-23) states, under Section 'Construction/Building Code Requirements' governing resident-initiated structural modifications to CIHAD-administered housing units: 'All construction shall be done in accordance with the International Residential Code. CIHAD shall be given the opportunity to inspect the work during all phases of completion.' This is the first live source located anywhere in Cocopah's public online presence naming a specific building-code family (the IRC), confirming at least CIHAD housing-authority-administered residential construction is governed by the International Residential Code -- however, no edition year is stated, and this citation is scoped to CIHAD's own housing stock; it is not independently confirmed to be identical to the Planning Department's separately-referenced 'Cocopah Tribe Building Code standards' governing the general Land Use/Building Permit (which also covers non-residential commercial and community construction). Also checked in this pass and confirmed NOT to hold the missing information: the Bureau of Indian Affairs' Fort Yuma Agency (256 S 2nd Avenue, Suite D, Yuma, AZ 85364, 928-782-1202), confirmed via bia.gov as the BIA agency office serving the Cocopah Tribe, which handles trust-land realty functions rather than building-permit issuance or code adoption and publishes no building code or fee schedule; Municode, American Legal Publishing, and Sterling Codifiers tribal-code hosting libraries (no Cocopah Tribe listing on any of the three); the Cocopah TERO (Tribal Employment Rights Office) (no published ordinance or fee schedule located online); and a full Wayback Machine capture-history scan of cocopah.com (4,353 unique URLs captured across the site's history) for any fee-schedule or building-code document (none found; only two irrelevant circa-1999/2000 pheasant-hunting-permit PDFs turned up under generic 'permit'-named filenames). None of these additional avenues surfaced a numeric Planning Department fee schedule or a code edition year for the general Land Use/Building Permit -- that remains a confirmed gap. Sources: CIHAD Property Management Policies and Procedures, https://ontherez.org/wp-content/uploads/2024/12/Property-Management-Policies-and-Procedures-1-31-2007.pdf, fetched live 2026-07-23; Cocopah Indian Tribe Departments page (CIHAD listing), https://www.cocopah.com/departments.html, fetched live 2026-07-23; BIA Fort Yuma Agency, https://www.bia.gov/regional-offices/western/fort-yuma-agency, fetched live 2026-07-23.
  • Fee updated

    Gila River Indian Community, Arizona — New Electrical Service (GRICUA Coordination) fee record added: GRICUA Design Fee (new/modified electrical service) ($2.50 per Amp of service disconnect/panel)

  • Fee updated

    Gila River Indian Community, Arizona — New Electrical Service (GRICUA Coordination) fee record added: GRICUA Initial Design Deposit — residential ('Custom Type') (Not a fixed dollar figure — set at GRICUA's sole discretion, Manager approval required)

  • Fee updated

    Hualapai Tribe, Arizona — TERC Development Permit (Low-Impact / General Development Environmental Review) fee record added: TERC development-permit application fee/service charge (None currently codified. VERIFIED NEGATIVE (2026-07-23): TERC Rules Section 405 authorizes the TERC Board to charge application/filing fees and states 'a schedule of application fees and service charges... is set out in Appendix D of these rules,' but the Rules document's own front-matter Table of Contents marks Appendix D 'Fees for Permit Applications' as '[planned, but not yet written]' — and the live PDF (all 65 pages fetched and reviewed 2026-07-23) confirms it ends mid-Appendix C without ever including Appendix D. No TERC development-permit fee schedule has ever been codified.)

  • Fee updated

    Hualapai Tribe, Arizona — EV Charger / EVSE Permit fee record updated: Application cover instructions state 1% of project amount; the fee block on the same application form separately states 'TERO Tax is 5%' -- these two figures conflict within the Tribe's own published document and are not reconciled by any other source located in this research pass → 5% of the total project/contract amount, paid at the beginning of each project. RESOLVED 2026-07-23: the revised Hualapai TERO Ordinance No. 01-80 (Tribal Council Resolution No. 76-2019, April 6, 2019), Section 9, states: 'Every covered construction contractor or enterprise with a contract of $1.00 or more shall pay a TERO tax fee of 5% of the total project/contract amount.' This applies to EV charger/EVSE installation contracts the same as any other construction contract on the Reservation and resolves the prior conflict with the Building Permit Application form's stale 1% cover-page text.

  • Fee updated

    Hualapai Tribe, Arizona — Building Permit (General Construction) fee record updated: Application cover instructions state 1% of project amount; the fee block on the same application form separately states 'TERO Tax is 5%' — these two figures conflict within the Tribe's own published document and are not reconciled by any other source located in this research pass. → 5% of the total project/contract amount, paid at the beginning of each project. RESOLVED 2026-07-23: the revised Hualapai TERO Ordinance No. 01-80 (as amended by Tribal Council Resolution No. 76-2019, April 6, 2019), Section 9 ('Hualapai TERO Tax Fees and Sanctions'), states verbatim: 'Every covered construction contractor or enterprise with a contract of $1.00 or more shall pay a TERO tax fee of 5% of the total project/contract amount. It will be paid at the beginning of each project.' The ordinance's own cover 'TERO Notice' page independently repeats the same figure: 'the ordinance require a 5% of the total construction contract amount as a one-time Employment Administration fee on each construction contract... made payable to the Hualapai Finance Department 1-928-769-2216.' This resolves the prior conflict with the Building Permit Application form's cover-instructions text (which stated 1%) — 5% is the current, codified, governing rate; the 1% figure on the application form's cover page is stale/erroneous.

  • Fee updated

    Hualapai Tribe, Arizona — Solar Photovoltaic (PV) Permit fee record updated: Application cover instructions state 1% of project amount; the fee block on the same application form separately states 'TERO Tax is 5%' — these two figures conflict within the Tribe's own published document and are not reconciled by any other source located in this research pass → 5% of the total project/contract amount, paid at the beginning of each project. RESOLVED 2026-07-23: the revised Hualapai TERO Ordinance No. 01-80 (Tribal Council Resolution No. 76-2019, April 6, 2019), Section 9, states: 'Every covered construction contractor or enterprise with a contract of $1.00 or more shall pay a TERO tax fee of 5% of the total project/contract amount.' This applies to solar construction contracts the same as any other construction contract on the Reservation and resolves the prior conflict with the Building Permit Application form's stale 1% cover-page text.

  • Fee updated

    Unincorporated Santa Cruz County, Arizona — Commercial/Multi-Family Building Permit (New Construction, Tenant Improvement) fee record added: TAC (Technical Advisory Committee) Development Plan Review Fee ($300.00 flat (covers up to 3 reviews); $100.00 for each additional review thereafter)

  • Fee updated

    Unincorporated Santa Cruz County, Arizona — Grading Permit (Standalone / Excavation and Grading) fee record added: TAC (Technical Advisory Committee) Development Plan Review Fee — grading reviewed under Planning and Zoning jurisdiction ($300.00 flat (covers up to 3 reviews); $100.00 for each additional review thereafter)

  • Timeline updated

    Unincorporated Yuma County, Arizona — plan-review timeline record updated: 14–29 business days

  • Codes updated

    Wickenburg, Arizona — adopted-codes record updated

    • + RE-CHASED 2026-07-23: Chapter 8 (Building), Article 8-1, Section 8-1-1 was read in full live via the Browser pane (the platform IS browser-readable, correcting the prior 'no accessible export' finding for reading purposes). It confirms Wickenburg's adopted suite remains the 2018 IBC (with Appendix C and Appendix I), 2018 IRC (with Appendices A, B, C, H, P, Q, T), 2018 IMC, 2018 IFC, 2018 IPC, 2017 NEC, and 2006 IECC — the same vintage already documented in this file — and that this suite was most recently reconfirmed/re-adopted by Ordinance 1244, approved 12/1/2025 ('Approved by Ord. 1244 on 12/1/2025'), i.e. the Town Council affirmatively kept the 2018/2017/2006 code years as of a Dec 2025 action rather than letting them go stale. The same live Section 8-1-1 also revealed three additional adopted codes/standards not previously captured in this file: the International Existing Building Code, 2018 edition (governs repair/alteration/change-of-occupancy/addition/relocation of existing buildings, per Section 101.4.7 as amended); the International Fuel Gas Code, 2018 edition (with Appendices A and B; governs gas piping from the point of delivery, per Section 101.4.1 as amended); and the Maricopa Association of Governments (MAG) Uniform Standard Specifications and Details for Public Works Construction, 2018 edition. Source: Town Code Section 8-1-1, wickenburg.municipalcodeonline.com/book?type=ordinances#name=CHAPTER_8_BUILDING, live browser fetch 2026-07-23.
    • + International Existing Building Code, 2018 edition, as adopted by the Wickenburg Town Council (Town Code Section 8-1-1; confirmed live 2026-07-23). Governs repair, alteration, change of occupancy, addition to, and relocation of existing buildings per Section 101.4.7 of the amended IBC.
    • + International Fuel Gas Code, 2018 edition, including Appendix A (Sizing and Capacities of Gas Piping) and Appendix B (Sizing of Venting Systems), as adopted by the Wickenburg Town Council (Town Code Section 8-1-1; confirmed live 2026-07-23). Governs gas piping from the point of delivery, gas appliances, and related accessories per Section 101.4.1 of the amended IBC.
    • + Maricopa Association of Governments (MAG) Uniform Standard Specifications and Details for Public Works Construction, 2018 edition, as adopted by the Wickenburg Town Council (Town Code Section 8-1-1; confirmed live 2026-07-23), applicable to public-works construction standards town-wide.
  • Fee schedule re-verified

    Wickenburg, Arizona — fee schedule re-verified across 7 permit types

  • Codes updated

    Town of Winkelman, Arizona — adopted-codes record updated

    • + Per the 2024 AZBO Directory (the same statewide industry directory independently cross-checked for the neighboring City of Globe file, where it was found to be stale and superseded by a 2024 city ordinance), Winkelman's listed adopted codes are the 2006 International Codes (I-Codes) and the 2002 National Electrical Code (NEC). UNLIKE Globe, this research found NO subsequent Winkelman town ordinance, resolution, or published code-update document anywhere (Town of Winkelman website, Town of Winkelman Council Documents page, Arizona Memory Project archive, League of Arizona Cities and Towns records) that supersedes this 2006 I-Codes/2002 NEC listing. This 2006/2002 code-cycle citation should therefore be treated as the best-available but NOT independently re-confirmed-current figure — it could not be verified against a live Winkelman-specific ordinance text because no such published, hosted ordinance/code text (e.g., via Municode, CodePublishing, or the Town's own site) was found to exist for Winkelman as of July 2026. Source: 2024 Arizona Building Officials (AZBO) Directory, Town of Winkelman entry (206 Giffin Avenue, Clerk: Sylvia Kerlock). Re-checked 2026-07-23 against the newly-published 2026 AZBO Directory (azbo.us, live fetch) — the Winkelman entry is unchanged and still lists 2006 I-Codes/2002 NEC, meaning the same figure has now persisted across at least two directory editions (2024 and 2026); this makes it less likely to be a stale one-off data-entry error, but it is still an industry-directory listing, not a Winkelman-issued ordinance text, so it remains the best-available rather than an independently ordinance-confirmed figure.
    • Per the 2024 AZBO Directory (the same statewide industry directory independently cross-checked for the neighboring City of Globe file, where it was found to be stale and superseded by a 2024 city ordinance), Winkelman's listed adopted codes are the 2006 International Codes (I-Codes) and the 2002 National Electrical Code (NEC). UNLIKE Globe, this research found NO subsequent Winkelman town ordinance, resolution, or published code-update document anywhere (Town of Winkelman website, Town of Winkelman Council Documents page, Arizona Memory Project archive, League of Arizona Cities and Towns records) that supersedes this 2006 I-Codes/2002 NEC listing. This 2006/2002 code-cycle citation should therefore be treated as the best-available but NOT independently re-confirmed-current figure — it could not be verified against a live Winkelman-specific ordinance text because no such published, hosted ordinance/code text (e.g., via Municode, CodePublishing, or the Town's own site) was found to exist for Winkelman as of July 2026. Source: 2024 Arizona Building Officials (AZBO) Directory, Town of Winkelman entry (206 Giffin Avenue, Clerk: Sylvia Kerlock).
  • Bulk update

    Permit-type records re-verified across 22 jurisdictions

  • Fee updated

    Artesia, New Mexico — Manufactured / Mobile Home Placement Permit fee record added: Manufactured Home Placement Permit (MHPP) (No dollar figure is codified; verified-negative confirmed 2026-07-23 via City Code Sec. 9-16-2 (Fee Schedule): fees for an MHPP are established and revised by resolution of the City Council (not stated in the ordinance text itself), and 'the fee schedule shall be available for review in the office of the community development director' -- i.e. the governing fee schedule is deliberately not codified or posted online; it must be reviewed in person)

  • Fee updated

    Artesia, New Mexico — Manufactured / Mobile Home Placement Permit fee record removed: Manufactured Home Placement Permit

  • Fee updated

    Bloomfield, New Mexico — Change of Use / Certificate of Occupancy Permit fee record added: Building and Zoning Compliance Application / Certificate of Zoning Compliance (City of Bloomfield) ($25.00)

  • Fee updated

    Bloomfield, New Mexico — Change of Use / Certificate of Occupancy Permit fee record removed: Building and Zoning Compliance Application (City of Bloomfield)

  • Fee updated

    Edgewood, New Mexico — Development Permit (Town Zoning & Floodplain Compliance Review) fee record updated: Not published online → $100.00

  • Fee updated

    Edgewood, New Mexico — Change of Use / Certificate of Occupancy (composite process — no standalone Town permit) fee record updated: Not published online → $100.00

  • Fee updated

    Lochbuie, Colorado — Electrical Permit fee record updated: $15.00 per calendar year → $15.00 per calendar year, flat and NOT prorated by quarter

  • Fee updated

    Lochbuie, Colorado — Demolition Permit fee record updated: Not separately itemized in the April 2026 Fee Schedule; billed under the general Building Permit Fee Schedule or the $50.00 'no fee specifically indicated' catch-all rate → No dedicated dollar figure exists anywhere Lochbuie publishes; billed under the general valuation-based Building Permit Fee Schedule or, absent a stated valuation, the $50.00 'Building permits which no fee is specifically indicated' catch-all rate (Specialized Permit Fee Schedule item 12)

  • Fee updated

    Village of Los Ranchos de Albuquerque, New Mexico — Building Permit (New Construction, Addition, or Alteration) fee record added: Bernalillo County Building Permit Fee (Table 3-A, charged by the Village's designee for issuance) ($30.00 plus $4.00 per $1,000.00 of valuation)

  • Fee updated

    Village of Los Ranchos de Albuquerque, New Mexico — Building Permit (New Construction, Addition, or Alteration) fee record added: Bernalillo County Building Plan Review Fee (Table 3-A) ($30.00 plus $2.00 per $1,000.00 of valuation)

  • Fee updated

    Village of Los Ranchos de Albuquerque, New Mexico — EV Charger / Electric Vehicle Charging Station Permit fee record added: Electrical Permit Fee (EV charger circuit) ($23.50 administrative charge (all electrical permit applications) plus $4.00 for the applicable per-item line -- either 'Outlet: 30 amp or over including panels' or 'Residential Fixed Appliances (30 amps or over),' whichever the Building Official classifies a dedicated EV charger circuit under)

  • Fee updated

    Village of Los Ranchos de Albuquerque, New Mexico — Change of Use / Certificate of Occupancy fee record updated: Valuation-based; no fixed dollar figure published for a standalone change-of-occupancy scope → $30.00 plus $4.00 per $1,000.00 of valuation (Building Permit Fee), plus $30.00 plus $2.00 per $1,000.00 of valuation (Building Plan Review Fee)

  • Fee updated

    Village of Los Ranchos de Albuquerque, New Mexico — EV Charger / Electric Vehicle Charging Station Permit fee record removed: Electrical Permit Fee (EV charger circuit, valuation-based)

  • Fee schedule re-verified

    Lovington, New Mexico — fee schedule re-verified across 2 permit types

  • Fee updated

    Saguache, Colorado — Building Permit fee record added: Town of Saguache Building Permit Fee ($20.00)

  • Fee updated

    Saguache, Colorado — EV Charger / EVSE Permit (Town Building Permit + State Electrical Permit) fee record updated: null → $20.00

  • Fee updated

    Saguache, Colorado — Solar PV Permit (Town Building Permit, Statewide Fee Cap) fee record updated: null → $20.00

  • Fee updated

    Tohono O'odham Nation, Arizona — Residential Building Permit (One- and Two-Family Dwellings) fee record added: TERO Fee (Tribal Employment Rights Ordinance 01-85, §1110) — a parallel TERO fee, NOT a Building Inspection permit fee (One-time fee of 1/2 of 1% (0.5%) of the total contract amount, for construction contracts of $100,000 or more on the Nation; paid by the primary contractor before commencing work)

  • Fee updated

    Tohono O'odham Nation, Arizona — Commercial and Public Building Permit fee record added: TERO Fee (Tribal Employment Rights Ordinance 01-85, §1110) — a parallel TERO fee, NOT a Building Inspection permit fee (One-time fee of 1/2 of 1% (0.5%) of the total contract amount, for construction contracts of $100,000 or more on the Nation; paid by the primary contractor before commencing work)

  • Fee updated

    Tohono O'odham Nation, Arizona — Residential/Commercial Solar Photovoltaic (PV) Permit fee record added: TERO Fee (Tribal Employment Rights Ordinance 01-85, §1110) — a parallel TERO fee, NOT a Building Inspection permit fee (One-time fee of 1/2 of 1% (0.5%) of the total contract amount, for construction contracts of $100,000 or more on the Nation; paid by the primary contractor before commencing work)

  • Fee updated

    Tohono O'odham Nation, Arizona — Electric Vehicle (EV) Charger / Charging Station Permit fee record added: TERO Fee (Tribal Employment Rights Ordinance 01-85, §1110) — a parallel TERO fee, NOT a Building Inspection permit fee (One-time fee of 1/2 of 1% (0.5%) of the total contract amount, for construction contracts of $100,000 or more on the Nation; paid by the primary contractor before commencing work)

  • Permit type added

    Glendale, Arizona — Sign Permit record added

  • Permit type added

    Glendale, Arizona — Fire Sprinkler / Fire Alarm Permit record added

  • Permit type added

    Glendale, Arizona — Certificate of Occupancy / Change of Occupancy record added

  • Permit type added

    City of Globe, Arizona — Sign Permit (Commercial/Business Signage) record added

  • Permit type added

    City of Globe, Arizona — Fire Sprinkler & Fire Alarm System Permit record added

  • Permit type added

    City of Globe, Arizona — Certificate of Occupancy (including Change of Use) record added

July 22, 2026

  • Bulk update

    Permit-type records re-verified across 10 jurisdictions

  • Bulk update

    Permit-type records re-verified across 11 jurisdictions

  • Bulk update

    Permit-type records re-verified across 10 jurisdictions

  • Bulk update

    Permit-type records re-verified across 10 jurisdictions

  • Permit type added

    Moab, Utah — Fire Sprinkler and Fire Alarm System Permit record added

  • Permit type added

    Moab, Utah — Change of Use / Change of Occupancy Permit record added

  • Permit type added

    Monticello, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    Monticello, Utah — Fire Alarm and Detection System Permit record added

  • Permit type added

    Monticello, Utah — Change of Use Permit record added

  • Permit type added

    Murray, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    Murray, Utah — Fire Alarm and Detection System Permit record added

  • Permit type added

    Murray, Utah — Change of Occupancy / Change of Use Permit record added

  • Permit type added

    North Logan, Utah — Change of Use Permit (Business License Relocation / New Occupancy Review) record added

  • Permit type added

    North Ogden, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    North Ogden, Utah — Fire Alarm System Permit record added

  • Permit type added

    North Ogden, Utah — Change of Use / Change of Occupancy Review record added

  • Permit type added

    North Ogden, Utah — Sign Permit record added

  • Fee updated

    North Salt Lake, Utah — Fire Sprinkler & Fire Alarm Permit fee record updated: 00 → $300

  • Fee updated

    North Salt Lake, Utah — Fire Sprinkler & Fire Alarm Permit fee record updated: 00 → $200

  • Fee updated

    North Salt Lake, Utah — Fire Sprinkler & Fire Alarm Permit fee record updated: 00 → $100

  • Permit type added

    North Salt Lake, Utah — Change of Use / Change of Occupancy (New Business or Tenant in an Existing Building) record added

  • Permit type added

    Ogden, Utah — Fire Alarm System Permit record added

  • Permit type added

    Ogden, Utah — Change of Use / Change of Occupancy record added

  • Permit type added

    Orem, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    Orem, Utah — Fire Alarm System Permit record added

  • Permit type added

    Orem, Utah — Change of Use / Change of Occupancy (Business License Application) record added

  • Bulk update

    Permit-type records re-verified across 11 jurisdictions

  • Bulk update

    Permit-type records re-verified across 11 jurisdictions

  • Bulk update

    Permit-type records re-verified across 14 jurisdictions

  • Bulk update

    Permit-type records re-verified across 32 jurisdictions

  • Bulk update

    Permit-type records re-verified across 9 jurisdictions

  • Bulk update

    Permit-type records re-verified across 14 jurisdictions

  • Bulk update

    Permit-type records re-verified across 9 jurisdictions

  • Bulk update

    Permit-type records re-verified across 16 jurisdictions

  • Fee updated

    Hurricane, Utah — Sign Permit fee record added: Mailing Fee ($1.50 per address)

  • Fee updated

    Hurricane, Utah — Sign Permit fee record updated: $150.00 → $50.00

  • Fee updated

    Hurricane, Utah — Sign Permit fee record updated: $1.50 per address → $150.00

  • Fee updated

    Hurricane, Utah — Grading Permit fee record updated: $150.00 → $300.00

  • Bulk update

    Permit-type records re-verified across 14 jurisdictions

  • Bulk update

    Permit-type records re-verified across 11 jurisdictions

  • Bulk update

    Permit-type records re-verified across 11 jurisdictions

  • Bulk update

    Permit-type records re-verified across 10 jurisdictions

  • Bulk update

    Permit-type records re-verified across 9 jurisdictions

  • Bulk update

    Permit-type records re-verified across 10 jurisdictions

July 21, 2026

  • Bulk update

    Permit-type records re-verified across 40 jurisdictions

July 20, 2026

  • Permit type added

    Unincorporated Campbell County, Wyoming — EV Charger / EVSE Permit record added

  • Permit type added

    Westcliffe, Colorado — Electric Vehicle (EV) Charging Station Permit record added

  • Permit type added

    Forsyth, Montana — Residential Solar Photovoltaic (PV) Permit — State-Issued Electrical Permit Add-On record added

  • Fee updated

    Unincorporated Jefferson County, Idaho — EV Charger / EVSE Permit fee record added: State Electrical Permit — Existing Dwelling Unit Permit ($65.00 per inspection (flat; no per-branch-circuit surcharge))

  • Fee updated

    Unincorporated Jefferson County, Idaho — EV Charger / EVSE Permit fee record added: DOPL Electrical Permit — Other Installations (Including Industrial and Commercial) Permit (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,001-$100,000: $260 plus 1% of excess over $10,000; over $100,000: $1,160 plus 0.5% of excess over $100,000)

  • Fee updated

    Unincorporated Jefferson County, Idaho — EV Charger / EVSE Permit fee record removed: State Electrical Permit — Existing Residence / Branch Circuit (homeowner)

  • Fee updated

    Unincorporated Jefferson County, Idaho — EV Charger / EVSE Permit fee record removed: DOPL Electrical Permit — 'Other Installations' (contractor-pulled)

  • Fee updated

    Town of Taos, New Mexico — Residential/Commercial Solar Photovoltaic (PV) Permit fee record added: State CID Electrical Permit Fee (interconnection scope) — residential, by service/panel amperage (100 amp service or less: $25.00; over 100 amp through 200 amp: $40.00; over 200 amp through 320 amp: $55.00; over 320 amp through 400 amp: $125.00; over 400 amp: $200.00; plus a plan review fee of $40.00/hour or fraction thereof where plan review is required)

  • Fee updated

    Town of Taos, New Mexico — Residential/Commercial Solar Photovoltaic (PV) Permit fee record removed: State CID Electrical Permit Fee (interconnection scope)

  • Permit type added

    Driggs, Idaho — EV Charger / EVSE Permit (State of Idaho Electrical Permit) record added

  • Permit type added

    Cortez, Colorado — Solar PV Permit (Split City/State Jurisdiction) record added

  • Permit type added

    West Valley City, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Driggs, Idaho — Solar PV Permit (Split City/State Jurisdiction) record added

  • Permit type added

    Vineyard, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    West Haven, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    West Haven, Utah — Fire Alarm System Permit record added

  • Fee updated

    Sandy, Utah — Sign Permit fee record updated: $70 (2025/2026 Approved) → $500

  • Fee updated

    Santaquin, Utah — Sign Permit fee record added: Temporary Sign Permit ($30.00 flat fee)

  • Fee updated

    Santaquin, Utah — Sign Permit fee record added: Permanent Sign Permit (As per Building fees -- valuation-based, determined by structure (same mechanism as the general Building Permit & Inspection Fees))

  • Fee updated

    Santaquin, Utah — Sign Permit fee record removed: Sign Permit Fee

  • Permit type added

    Great Falls, Montana — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Hualapai Tribe, Arizona — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Unincorporated Canyon County, Idaho — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Tusayan, Arizona — Electric Vehicle (EV) Charger / Charging Station Permit record added

  • Permit type added

    Unincorporated Albany County, Wyoming — Electric Vehicle (EV) Charger Permit (State Program) record added

  • Permit type added

    City of St. Maries, Idaho — Electric Vehicle (EV) Charging Station Permit record added

  • Permit type added

    Shelley, Idaho — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Unincorporated Uintah County, Utah — EV Charger / EVSE Permit record added

  • New jurisdictions

    1 new Arizona jurisdictions: Yavapai-Apache Nation