What changed — page 12
Older changes to PermitBase’s verified permit dataset, newest first. The most recent changes are on the first page.
July 20, 2026
- Fee updated
Littleton, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record updated: $25.85 minimum, scaling per valuation tiers → $25.85 for the first $500, plus $3.35 for each additional $100 or fraction thereof up to $2,000 (higher tiers scale further for larger-valuation projects)
- Permit type added
Palisade, Colorado — EV Charger / EVSE Permit — Mesa County Building Permit (Electrical) record added
- Permit type added
Middleton, Idaho — Solar PV Permit record added
- Permit type added
Gunnison, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- Fee updated
Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) fee record added: General valuation-based permit fee (Table B) — applies to a standalone EV charger circuit addition (not a Table C fixed-fee category) (Up to $500 valuation: $33.08 flat. $501-$2,000: $33.08 for the first $500 plus $2.21 per additional $100 or fraction thereof. $2,001-$25,000: $66.15 for the first $2,000 plus $9.92 per additional $1,000 or fraction thereof.)
- Fee updated
Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) fee record added: SoCoBD Residential Electrical Only Permit (Table C) — Upgrade/Replace Service (if the charger install requires a service/panel upgrade) ($55.13 flat)
- Fee updated
Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) fee record removed: SoCoBD Residential Electrical Only Permit (Table C) — no confirmed dedicated EV/EVSE line item
- Permit type added
Tooele, Utah — Fire Plan Review Permit (Fire Sprinkler & Fire Alarm Systems) record added
- Permit type added
Rifle, Colorado — EV Charging Station Permit (Issued by the State of Colorado, Not the City) record added
- Permit type added
Heyburn, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Bow Mar, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Santa Clara, Utah — Fire Sprinkler System Permit record added
- Permit type added
Santa Clara, Utah — Fire Alarm System Permit record added
- Permit type added
Louisville, Colorado — Solar PV Permit (Roof Top Unit/Solar/Telecommunication) record added
- Permit type added
Rexburg, Idaho — EV Charging Station Permit (City Electrical Permit) record added
- Permit type added
Moscow, Idaho — Residential Solar Photovoltaic (PV) Permit record added
- Permit type added
Litchfield Park, Arizona — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Kellogg, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Preston, Idaho — EV Charging Station Permit (State-Issued Electrical Permit) record added
- Fee updated
Lochbuie, Colorado — Rooftop Solar / Photovoltaic Permit fee record updated: Electrical Permit fees as charged by the State of Colorado Electrical Board, plus 15% → State Electrical Board valuation-based schedule, plus 15%: base fee ~$100-$120 (scales to ~$115-$138 with the 15% local surcharge) for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that (roughly $11.50-$13.25 with the 15% surcharge) — capped in aggregate at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113
- Permit type added
Taylorsville, Utah — EV Charger / EVSE Permit record added
- Permit type added
Edgewood, New Mexico — Residential Solar Photovoltaic (PV) Permit (NM Construction Industries Division — Electrical Bureau) record added
- Permit type added
Julesburg, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Yavapai-Apache Nation, Arizona — Solar Photovoltaic (PV) Permit record added
- Fee updated
Winter Park, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record added: State Electrical Board Permit Fee (EV charger circuit/equipment) (Set by the State Electrical Board per C.R.S. § 12-115-121(1) based on actual inspection cost — calculated and charged online at the DPO Online Permitting System, not published as a static table)
- Fee updated
Winter Park, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record removed: State Electrical Board permit fees (EV charger circuit/equipment)
- Timeline updated
Winter Park, Colorado — plan-review timeline record updated: undefined–3 business days
- Permit type added
Tombstone, Arizona — Electric Vehicle (EV) Charger / Charging Station Permit record added
- Permit type added
Westcliffe, Colorado — Solar Photovoltaic (PV) Permit record added
- Permit type added
Notus, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Price, Utah — Sign Permit record added
- Fee updated
Cripple Creek, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Statewide aggregate fee cap on active solar energy system installs ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
- Permit type added
Holyoke, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Quartzsite, Arizona — Solar PV Permit record added
- Permit type added
Sandpoint, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Washington City, Utah — EV Charger / EVSE Permit record added
- Permit type added
Hurricane, Utah — Fire Sprinkler System Permit record added
- Permit type added
Hurricane, Utah — Fire Alarm System Permit record added
- Permit type added
West Point, Utah — Sign Permit record added
- Permit type added
West Valley City, Utah — Sign Permit record added
- Permit type added
Woods Cross, Utah — Sign Permit record added
- Fee updated
Unincorporated Teller County, Colorado — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: Electrical Permit Fee (EV charger/EVSE circuit) (Calculated via the county's online Fee Calculator based on job valuation/scope -- exact dollar figures not independently retrievable)
- Fee updated
Brigham City, Utah — Sign Permit fee record added: Sign Permit Fee — governing figure, confirmed by two independent official sources ($50.00 per hour of inspection time, minimum half hour ($25.00 minimum))
- Fee updated
Brigham City, Utah — Sign Permit fee record added: Sign Permit Fee — superseded/stale figure, NOT the governing fee ($35.25 minimum (do not use))
- Fee updated
Brigham City, Utah — Sign Permit fee record removed: Sign Permit Fee — per city's live-hosted Business License Application info sheet
- Fee updated
Brigham City, Utah — Sign Permit fee record removed: Sign Permit Fee — per archived (2022) bcutah.org sign-permit page
- Permit type added
Trinidad, Colorado — Electric Vehicle (EV) Charger Permit record added
- Permit type added
Calhan, Colorado — Solar Photovoltaic (PV) Permit record added
- Fee updated
Unincorporated Valley County, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: State Electrical Permit — Existing Dwelling Unit Permit (residential EVSE circuit added to an existing home) ($65.00 per inspection (flat; no per-branch-circuit surcharge))
- Fee updated
Unincorporated Valley County, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: DOPL Electrical Permit — Other Installations (Including Industrial and Commercial) Permit (new construction, commercial, or multi-family EVSE) (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,001-$100,000: $260 plus 1% of excess over $10,000; over $100,000: $1,160 plus 0.5% of excess over $100,000)
- Fee updated
Unincorporated Valley County, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record removed: State Electrical Permit Fee (EV charger/EVSE circuit)
- Permit type added
Eagar, Arizona — Solar PV Permit (via Building + Electrical Permits) record added
- Permit type added
Lewistown, Montana — Solar PV Permit (Alternative Energy) record added
- Permit type added
Berthoud, Colorado — EV Charger / EVSE Installation Permit record added
- Permit type added
Town of Payson, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Lander, Wyoming — EV Charger / EVSE Permit record added
- Permit type added
Ogden, Utah — Fire Protection System (Sprinkler & Alarm) Permit record added
- Permit type added
Plummer, Idaho — EV Charger / EVSE Permit record added
- Fee updated
Farmington, Utah — Sign Permit fee record updated: Not separately published → Not separately published (re-chased 2026-07-20, exhausted every reachable avenue)
- Permit type added
Unincorporated Sweetwater County, Wyoming — Solar Energy System — On-Site (Rooftop/Ground-Mount PV) — Zoning Permit record added
- Permit type added
Cheyenne Wells, Colorado — Solar Photovoltaic (PV) Permit record added
- Permit type added
Tucson, Arizona — Electric Vehicle (EV) Charger / Charging Station Permit record added
- Permit type added
Bernalillo, New Mexico — Solar PV Permit record added
- Permit type added
Kersey, Colorado — Rooftop Solar Photovoltaic Permit record added
- Permit type added
Unincorporated Natrona County, Wyoming — EV Charger / EVSE Permit record added
- Permit type added
Holladay, Utah — Fire Sprinkler System Permit record added
- Permit type added
Holladay, Utah — Fire Alarm and Detection System Permit record added
- Permit type added
Fruitland, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Evans, Colorado — EV Charger / EVSE Permit (Billed as Electrical Upgrade / Building One Stop) record added
- Fee updated
Yuma, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record added: State Electrical Board Permit Fee (Set by the State Electrical Board per C.R.S. § 12-115-121(1) based on actual inspection cost — calculated and charged online at the DPO Online Permitting System, not published as a static table)
- Fee updated
Yuma, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record removed: State Electrical Permit Fee
- Timeline updated
Yuma, Colorado — plan-review timeline record updated: undefined–3 business days
- Permit type added
Eagle Mountain, Utah — EV Charger / EVSE Permit record added
- Permit type added
Ammon, Idaho — Solar Array (Photovoltaic) Permit record added
- Permit type added
Sandy, Utah — EV Charger / EVSE Permit record added
- Permit type added
Heber City, Utah — EV Charger / EVSE Permit record added
- Permit type added
Coolidge, Arizona — Electric Vehicle Charging Station Permit record added
- Fee updated
Douglas, Arizona — Electrical Permit fee record updated: $100.00 → $55.00
- Fee updated
Douglas, Arizona — Electrical Permit fee record updated: $30.00 → $100.00
- Permit type added
Clovis, New Mexico — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Payette, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Paradise Valley, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Tempe, Arizona — Electric Vehicle (EV) Charging Station Permit record added
- Permit type added
Unincorporated Sheridan County, Wyoming — EV Charger / EVSE Permit record added
- Permit type added
Red Lodge, Montana — Solar PV / Alternative Energy Permit (State-Issued Electrical + City-Issued Structural) record added
- Permit type added
Los Alamos County, New Mexico — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Broomfield, Colorado — EV Charging Station Permit record added
- Permit type added
Prescott Valley, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Unincorporated Jefferson County, Idaho — Solar Permit record added
- Permit type added
Thornton, Colorado — Electric Vehicle (EV) Charging Station Permit record added
- Permit type added
Huachuca City, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Shelby, Montana — Solar Photovoltaic (PV) Permit record added
- Fee updated
Emmett, Idaho — EV Charger / EVSE Permit (State of Idaho DOPL Electrical Permit) fee record added: Existing Dwelling Unit Permit (per inspection) — governing line for a circuit addition like an EV charger on an existing residence ($65.00 per inspection)
- Fee updated
Emmett, Idaho — EV Charger / EVSE Permit (State of Idaho DOPL Electrical Permit) fee record added: New Residential Construction (square-footage based, if the charger is part of new construction rather than an existing-home retrofit) ($130 (up to 1,500 sq ft) to $325 (3,501-4,500 sq ft), plus $65 per additional increment above 4,500 sq ft)
- Fee updated
Emmett, Idaho — EV Charger / EVSE Permit (State of Idaho DOPL Electrical Permit) fee record added: Reinspection Fee ($65.00 per reinspection)
- Permit type added
Hobbs, New Mexico — EV Charger / EVSE Permit record added
- Permit type added
La Verkin, Utah — Fire Sprinkler System Permit record added
- Permit type added
La Verkin, Utah — Fire Alarm System Permit record added
- Permit type added
Toole County (Unincorporated), Montana — Electric Vehicle (EV) Charger Permit (State-Issued) record added
- Fee updated
Eloy, Arizona — Residential Solar Photovoltaic (PV) Permit fee record updated: $60.00 → $135.00
- Fee updated
Eloy, Arizona — Residential Solar Photovoltaic (PV) Permit fee record updated: $30.00 → $60.00
- Permit type added
Star, Idaho — Residential/Commercial Solar Photovoltaic (PV) Permit record added
- Permit type added
Estes Park, Colorado — EV Charger / EVSE Permit (State-Issued — No Town Component) record added
- Fee updated
Wickenburg, Arizona — EV Charger Installation Permit fee record added: Building Permit Fees Based on Valuation (no dedicated EV-charger line item; general table an EV charger circuit/equipment permit would fall under) ($1-$500: $27.00; $501-$2,000: $27.00 + $3.75/additional $100; $2,001-$40,000: $76.75 + $14.25/additional $1,000; $40,001-$100,000: $490.25 + $9.75/additional $1,000; $100,001-$500,000: $1,103.25 + $7.75/additional $1,000; $500,001-$1,000,000: $3,900.00 + $5.50/additional $1,000; $1,000,001-$5,000,000: $6,525.75 + $3.50/additional $1,000; $5,000,000+: $18,327.00 + $1.00/additional $1,000)
- Fee updated
Wickenburg, Arizona — EV Charger Installation Permit fee record added: EV Charger Permit Fee — dedicated line item (None found. Confirmed absent from the FY2022/23 Consolidated Fee Schedule (which does carry dedicated lines for Photovoltaic Permit Residential $150.00 / Commercial $200.00 and a Solar Connect Fee Application $200.00, showing the Town does sometimes publish trade-specific lines — EV charging is not one of them))
- Fee updated
Wickenburg, Arizona — EV Charger Installation Permit fee record removed: EV Charger Permit Fee (building/electrical, valuation-based)
- Permit type added
Red Lodge, Montana — EV Charging Station Permit (State-Issued Electrical Permit) record added
- Permit type added
Bountiful, Utah — EV Charger / EVSE Permit record added
- Permit type added
Conrad, Montana — Electric Vehicle Charging Station Permit (State-Issued Electrical Permit) record added
- Permit type added
Glasgow, Montana — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Libby, Montana — Solar PV Permit (Alternative Energy) record added
- Permit type added
Colorado River Indian Tribes, Arizona — Electric Vehicle Charging Station Installation (via General Building Permit) record added
- Fee updated
Unincorporated La Paz County, Arizona — EV Charger / EVSE Permit fee record updated: Building Permit Fee, per Table M-1 valuation schedule → Building Permit Fee per Exhibit B Valuation and Fee Schedule (e.g. $780.00 for the first $50,000 plus $8.00 per additional $1,000 in the $50,001-$100,000 tier)
- Permit type added
Farmington, Utah — Sign Permit record added
- Permit type added
La Verkin, Utah — EV Charger / EVSE Permit record added
- Permit type added
Nye County (Unincorporated, incl. Pahrump), Nevada — EV Charger / EVSE Permit record added
- Permit type added
Unincorporated Sheridan County, Wyoming — Solar PV Permit record added
- Permit type added
Unincorporated Gem County, Idaho — Solar PV Permit record added
- Permit type added
Village of Corrales, New Mexico — Electric Vehicle Charging Station Permit record added
- Permit type added
Fort Lupton, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Akron, Colorado — EV Charger / EVSE Permit record added
- Fee updated
Buhl, Idaho — Sign Permit fee record added: Sign Permit Fee (valuation-based, per City Building Permit Fee Schedule) ($23.50 minimum (for $1-500 estimated sign value), scaling per the City's tiered Building Permit Fee Schedule table (e.g. $69.25 at $2,000; $181.25 at $10,000; $391.25 at $25,000))
- Fee updated
Buhl, Idaho — Sign Permit fee record added: Plan Check Fee (50% of the Permit Fee)
- Permit type added
Idaho City, Idaho — Solar Photovoltaic (PV) Permit record added
- Fee updated
Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: City of Kellogg building/structural permit fee (mounting/racking portion) (null)