What changed — page 13
Older changes to PermitBase’s verified permit dataset, newest first. The most recent changes are on the first page.
July 20, 2026
- Fee updated
Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: Idaho DOPL Electrical Permit — Other Installation (Including Industrial and Commercial) fee schedule (applies to solar/renewable energy interconnection since Kellogg has no local electrical-permitting program) (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,000–$100,000: $260 plus 1% of the amount over $10,000; over $100,000: $1,160 plus 0.5% of the amount over $100,000; small work under $500 not involving a service change: $10)
- Fee updated
Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: Idaho DOPL Plan Check Fee ($65 minimum for one hour or less, plus $65 per additional hour)
- Fee updated
Kellogg, Idaho — Solar Photovoltaic (PV) Permit fee record added: Idaho DOPL Requested Inspection Permit ($65 per inspection)
- Permit type added
Unincorporated Churchill County, Nevada — Solar Photovoltaic (PV) Permit record added
- Permit type added
Unincorporated Bannock County, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Town of Carbondale, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Provo, Utah — Sign Permit record added
- Permit type added
Riverton, Utah — Sign Permit record added
- Permit type added
Salt Lake City, Utah — Sign Permit record added
- Fee updated
Larkspur, Colorado — Rooftop Solar Photovoltaic (PV) Permit fee record added: Solar/Photovoltaic Permit (separate form, same underlying DORA valuation formula as the general Electrical Permit) (Valuation-based: $100 base fee for job valuation up to $2,000, plus $10 per $1,000 (rounded up) of job valuation above $2,000 — e.g., a $5,150 job rounds to $6,000 and totals $100 + (6 x $10) = $160.00 — capped in aggregate at $500 (residential) / $1,000 (commercial) by Colorado's statewide C.R.S. § 24-48.5-113)
- Fee updated
Larkspur, Colorado — Rooftop Solar Photovoltaic (PV) Permit fee record removed: Solar/Photovoltaic Permit (separate form; no dollar figure published on Larkspur's own site)
- Permit type added
Superior, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Carlin, Nevada — EV Charger / EVSE Permit record added
- Permit type added
Nibley, Utah — EV Charger / EVSE Permit record added
- Permit type added
Scottsdale, Arizona — EV Charger / EVSE Permit (Electrical Minimum Permit) record added
- Fee updated
Centerville, Utah — Sign Permit fee record added: Sign Permit Fee (standard) (Based on Building Valuation — same fee table as CFS 4 (Building Permit Fees))
- Fee updated
Centerville, Utah — Sign Permit fee record added: Temporary Sign Permit Fee ($30.00)
- Fee updated
Centerville, Utah — Sign Permit fee record added: Street Signs (See CFS 17 (Street and Excavation Permit Fees))
- Fee updated
Centerville, Utah — Sign Permit fee record removed: Sign Permit Fee
- Permit type added
Billings, Montana — EV Charger / EVSE Installation Permit record added
- Permit type added
Fountain Hills, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Unincorporated Ada County, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Ak-Chin Indian Community, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Storey County (includes Virginia City), Nevada — EV Charger / EVSE Permit record added
- Permit type added
Dewey-Humboldt, Arizona — EV Charger / EVSE Permit (via Over-the-Counter Electrical Permit) record added
- Permit type added
Milliken, Colorado — Electric Vehicle (EV) Charger Permit record added
- Permit type added
Unincorporated Millard County, Utah — EV Charger / EVSE Permit record added
- Permit type added
Windsor, Colorado — EV Charger Installation Permit record added
- Permit type added
Winslow, Arizona — EV Charger Installation Permit record added
- Permit type added
Lafayette, Colorado — EV Charger / EVSE Permit record added
- Fee updated
Jerome, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Existing Residential Dwelling Unit Permit (DOPL) — applies to an EV charger circuit added to an existing home ($65 per inspection)
- Fee updated
Jerome, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Other Installation (Including Industrial and Commercial) Permit (DOPL) — applies to commercial/multi-family EV charging installations (Wiring cost not exceeding $10,000: $60 plus 2% of wiring cost. $10,001-$100,000: $260 plus 1% of the amount over $10,000. Over $100,000: $1,160 plus 0.5% of the amount over $100,000.)
- Fee updated
Jerome, Idaho — Electric Vehicle (EV) Charger / EVSE Permit fee record removed: Electrical Permit (DOPL, valuation-based)
- Permit type added
Cascade, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Conrad, Montana — Solar PV / Alternative Energy Permit (State-Issued) record added
- Permit type added
Unincorporated Piute County, Utah — Sign Permit record added
- Permit type added
Unincorporated Rich County, Utah — Sign Permit record added
- Permit type added
Longmont, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Harrison, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Mead, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Worley, Idaho — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Clinton, Utah — Automatic Fire Extinguishing (Sprinkler) and Alarm System Permit record added
- Permit type added
Columbia Falls, Montana — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Kaysville, Utah — EV Charger / EVSE Permit record added
- Permit type added
Unincorporated Mineral County, Nevada — Solar PV Permit record added
- Permit type added
Blackfoot, Idaho — EV Charger / EVSE Installation Permit record added
- Permit type added
Gila River Indian Community, Arizona — Residential Solar Photovoltaic (PV) Permit and GRICUA Interconnection record added
- Permit type added
Yerington, Nevada — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
West Bountiful, Utah — EV Charger / EVSE Permit record added
- Permit type added
Priest River, Idaho — EV Charging Station Permit (State-Issued Electrical Permit) record added
- Permit type added
Ronan, Montana — EV Charger / EVSE Permit (State-Issued Electrical) record added
- Permit type added
Kayenta Township, Arizona — Solar Photovoltaic (PV) / Renewable Energy Permit record added
- Permit type added
Middleton, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Carlin, Nevada — Solar Photovoltaic (PV) Permit record added
- Permit type added
Payson, Utah — EV Charger / EVSE Permit record added
- Permit type added
Grangeville, Idaho — Solar Photovoltaic (PV) Permit record added
- Fee updated
Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Building Permit Fee (structural/racking scope, valuation-based) (Minimum charge $43.50 (a $20.00 Processing Fee + $23.50 Permit Fee) for valuations of $1-$500; rises per the Resolution 19-04 Fees Valuation Table, e.g. $391.25 for a $25,000 valuation, $993.75 for a $100,000 valuation, up to $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000 above that)
- Fee updated
Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Plan Check / Plan Review Fee (65% of the Building Permit Fee)
- Fee updated
Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Electrical Permit Processing Fee ($20.00)
- Fee updated
Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Electrical Permit — Service fee (PV interconnection/service, if a new/upgraded service is part of the installation) ($27.25 (services 600V or less, up to 200 amps); $55.50 (600V or less, over 200 to 1,000 amps); $111.00 (over 600V or over 1,000 amps))
- Fee updated
Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Electrical Permit — Power Apparatus / Miscellaneous apparatus fee (inverter or PV equipment not separately categorized) ($4.25 to $66.50 depending on rated HP/kW/kVA tier (Power Apparatus), or a flat $16.25 catch-all fee if no other listed category applies (Miscellaneous apparatus, conduits and conductors))
- Permit type added
Chubbuck, Idaho — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Wickenburg, Arizona — Residential Solar Photovoltaic (PV) Permit record added
- Permit type added
Heyburn, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Florence, Colorado — EV Charger / Electric Vehicle Charging Station Permit (State-Administered) record added
- Permit type added
Jackson, Wyoming — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Kalispell, Montana — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Page, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Mapleton, Utah — EV Charger / EVSE Permit record added
- Permit type added
Farmington, Utah — EV Charger / EVSE Permit record added
- Permit type added
Springville, Utah — Fire Sprinkler, Alarm, and Hood Plan Review Permit record added
- Fee updated
Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Feeder and Branch Circuits — Residential (closest published category for a new EV charger circuit; formula is per heated sq ft, structured for new-construction wiring rather than a single retrofit circuit) ($0.03 per heated sq ft)
- Fee updated
Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Administrative Fee ($40.00)
- Fee updated
Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Electric Service under 100 amps (minimum) — if a new/upgraded service is also required ($60.00)
- Fee updated
Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Reinspection Fee ($75.00)
- Permit type added
Lehi, Utah — EV Charger / EVSE Permit record added
- Permit type added
Carefree, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Fort McDowell Yavapai Nation, Arizona — Residential/Small Solar Photovoltaic (PV) Installation (via General Building Permit Pipeline) record added
- Fee updated
Kimberly, Idaho — Sign Permit fee record added: Sign Permit Fee (null)
- Permit type added
Ivins, Utah — Fire Sprinkler System Permit record added
- Permit type added
Ivins, Utah — Fire Alarm System Permit record added
- Permit type added
Pershing County (includes Lovelock), Nevada — Solar Photovoltaic (PV) Permit record added
- Permit type added
Johnstown, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added
- Fee updated
Unincorporated Albany County, Wyoming — Solar Energy Permit fee record updated: $50.00 (per this database's electrical-wiring-permit-state-program record for Albany County; NOT re-confirmed as still published on the current WSFM site as of this review) → $50.00
- Permit type added
Unincorporated Washington County, Utah — EV Charger / EVSE Permit record added
- Fee updated
Plummer, Idaho — EV Charger / EVSE Permit fee record added: Electrical Permit — Existing Residence / Detached Shop (State of Idaho DOPL) ($65 flat fee, includes one branch circuit; plus $10 for each additional branch circuit)
- Fee updated
Plummer, Idaho — EV Charger / EVSE Permit fee record added: Building Permit — valuation-based (1997 UBC table, plus City's 25% surcharge) ($69.25 for the first $2,000 of valuation, plus $14 for each additional $1,000 or fraction thereof, plus the City's 25% surcharge)
- Fee updated
Plummer, Idaho — EV Charger / EVSE Permit fee record removed: Building Permit — valuation-based (1997 UBC table, plus City's 25% surcharge) — no EV-specific or general electrical fee line found
- Permit type added
Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) record added
- Permit type added
Coeur d'Alene, Idaho — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Carlsbad, New Mexico — EV Charger / EVSE Permit record added
- Permit type added
San Carlos Apache Tribe, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Edgewater, Colorado — EV Charger / EVSE Permit (Billed as General Electrical Work) record added
- Permit type added
Saratoga Springs, Utah — Automatic Fire Sprinkler Permit record added
- Permit type added
Saratoga Springs, Utah — Fire Alarm System Permit record added
- Permit type added
Cottonwood Heights, Utah — EV Charger / EVSE Permit record added
- Permit type added
Clifton, Arizona — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Denver, Colorado — EV Charger / EVSE Permit record added
- Permit type added
West Jordan, Utah — EV Charger / EVSE Permit record added
- Permit type added
Aztec, New Mexico — EV Charger / EVSE Installation Permit record added
- Permit type added
Flagstaff, Arizona — EV Charger / Electric Vehicle Charging Circuit Permit record added
- Permit type added
Larkspur, Colorado — EV Charger / EVSE Permit record added
- Timeline updated
Lewiston, Idaho — plan-review timeline record updated: 8–14 business days
- Permit type added
North Logan, Utah — Sign Permit record added
- Permit type added
Ogden, Utah — Sign Permit record added
- Permit type added
Orem, Utah — Sign Permit record added
- Permit type added
Sidney, Montana — Solar Photovoltaic (PV) Permit record added
- Permit type added
Commerce City, Colorado — Solar PV Permit record added
- Permit type added
Unincorporated Yavapai County, Arizona — Residential Solar PV Permit (Grid-Tied Exemption / Off-Grid / Panel Upgrade) record added
- Permit type added
Donnelly, Idaho — EV Charger / EVSE Permit (State of Idaho Electrical Permit) record added
- Permit type added
Unincorporated Davis County, Utah — EV Charger / EVSE Permit record added
- Permit type added
City of Deer Lodge, Montana — Solar PV / Alternative Energy Permit (State-Issued) record added
- Permit type added
Lakewood, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Laurel, Montana — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
City of Fountain, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Youngtown, Arizona — Residential/Commercial Solar Photovoltaic (PV) Permit record added
- Permit type added
Wellington, Colorado — Electric Vehicle (EV) Charging Station / EVSE Permit record added
- Fee updated
Dacono, Colorado — Rooftop Solar Photovoltaic (PV) Permit fee record added: Statewide aggregate fee cap on active solar energy system installs (reference only — does not currently bind Dacono's own fee) ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
- Permit type added
Unincorporated Greenlee County, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Monticello, Utah — EV Charger / EVSE Permit record added
- Permit type added
Brigham City, Utah — EV Charger / EVSE Permit record added
- Permit type added
St. George, Utah — Sign Permit record added
- Permit type added
Taylorsville, Utah — Sign Permit record added
- Fee updated
Springville, Utah — Fire Sprinkler, Alarm, and Hood Plan Review Permit fee record updated: No fire-marshal-specific dollar figure was found published on springvilleutah.gov or in the FY2025 Comprehensive Fee Schedule (Exhibit B). → No fire-marshal-specific dollar figure was found published on springvilleutah.gov or in either the FY2025 or the newer FY2026 Comprehensive Fee Schedule.
- Permit type added
Unincorporated Tooele County, Utah — Fire Sprinkler & Fire Alarm System Permit record added