Skip to main content
PermitBase

What changed — page 14

Older changes to PermitBase’s verified permit dataset, newest first. The most recent changes are on the first page.

July 20, 2026

  • Permit type added

    Blackfoot, Idaho — EV Charger / EVSE Installation Permit record added

  • Permit type added

    Gila River Indian Community, Arizona — Residential Solar Photovoltaic (PV) Permit and GRICUA Interconnection record added

  • Permit type added

    Yerington, Nevada — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    West Bountiful, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Priest River, Idaho — EV Charging Station Permit (State-Issued Electrical Permit) record added

  • Permit type added

    Ronan, Montana — EV Charger / EVSE Permit (State-Issued Electrical) record added

  • Permit type added

    Kayenta Township, Arizona — Solar Photovoltaic (PV) / Renewable Energy Permit record added

  • Permit type added

    Middleton, Idaho — EV Charger / EVSE Permit record added

  • Permit type added

    Carlin, Nevada — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Payson, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Grangeville, Idaho — Solar Photovoltaic (PV) Permit record added

  • Fee updated

    Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Building Permit Fee (structural/racking scope, valuation-based) (Minimum charge $43.50 (a $20.00 Processing Fee + $23.50 Permit Fee) for valuations of $1-$500; rises per the Resolution 19-04 Fees Valuation Table, e.g. $391.25 for a $25,000 valuation, $993.75 for a $100,000 valuation, up to $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000 above that)

  • Fee updated

    Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Plan Check / Plan Review Fee (65% of the Building Permit Fee)

  • Fee updated

    Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Electrical Permit Processing Fee ($20.00)

  • Fee updated

    Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Electrical Permit — Service fee (PV interconnection/service, if a new/upgraded service is part of the installation) ($27.25 (services 600V or less, up to 200 amps); $55.50 (600V or less, over 200 to 1,000 amps); $111.00 (over 600V or over 1,000 amps))

  • Fee updated

    Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) fee record added: Electrical Permit — Power Apparatus / Miscellaneous apparatus fee (inverter or PV equipment not separately categorized) ($4.25 to $66.50 depending on rated HP/kW/kVA tier (Power Apparatus), or a flat $16.25 catch-all fee if no other listed category applies (Miscellaneous apparatus, conduits and conductors))

  • Permit type added

    Chubbuck, Idaho — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Wickenburg, Arizona — Residential Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Heyburn, Idaho — EV Charger / EVSE Permit record added

  • Permit type added

    Florence, Colorado — EV Charger / Electric Vehicle Charging Station Permit (State-Administered) record added

  • Permit type added

    Jackson, Wyoming — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Kalispell, Montana — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Page, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Mapleton, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Farmington, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Springville, Utah — Fire Sprinkler, Alarm, and Hood Plan Review Permit record added

  • Fee updated

    Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Feeder and Branch Circuits — Residential (closest published category for a new EV charger circuit; formula is per heated sq ft, structured for new-construction wiring rather than a single retrofit circuit) ($0.03 per heated sq ft)

  • Fee updated

    Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Administrative Fee ($40.00)

  • Fee updated

    Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Electric Service under 100 amps (minimum) — if a new/upgraded service is also required ($60.00)

  • Fee updated

    Aztec, New Mexico — EV Charger / EVSE Installation Permit fee record added: Reinspection Fee ($75.00)

  • Permit type added

    Lehi, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Carefree, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Fort McDowell Yavapai Nation, Arizona — Residential/Small Solar Photovoltaic (PV) Installation (via General Building Permit Pipeline) record added

  • Fee updated

    Kimberly, Idaho — Sign Permit fee record added: Sign Permit Fee (null)

  • Permit type added

    Ivins, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    Ivins, Utah — Fire Alarm System Permit record added

  • Permit type added

    Pershing County (includes Lovelock), Nevada — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Johnstown, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Fee updated

    Unincorporated Albany County, Wyoming — Solar Energy Permit fee record updated: $50.00 (per this database's electrical-wiring-permit-state-program record for Albany County; NOT re-confirmed as still published on the current WSFM site as of this review) → $50.00

  • Permit type added

    Unincorporated Washington County, Utah — EV Charger / EVSE Permit record added

  • Fee updated

    Plummer, Idaho — EV Charger / EVSE Permit fee record added: Electrical Permit — Existing Residence / Detached Shop (State of Idaho DOPL) ($65 flat fee, includes one branch circuit; plus $10 for each additional branch circuit)

  • Fee updated

    Plummer, Idaho — EV Charger / EVSE Permit fee record added: Building Permit — valuation-based (1997 UBC table, plus City's 25% surcharge) ($69.25 for the first $2,000 of valuation, plus $14 for each additional $1,000 or fraction thereof, plus the City's 25% surcharge)

  • Fee updated

    Plummer, Idaho — EV Charger / EVSE Permit fee record removed: Building Permit — valuation-based (1997 UBC table, plus City's 25% surcharge) — no EV-specific or general electrical fee line found

  • Permit type added

    Pueblo, Colorado — EV Charging Station Permit (Electrical Permit) record added

  • Permit type added

    Coeur d'Alene, Idaho — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Carlsbad, New Mexico — EV Charger / EVSE Permit record added

  • Permit type added

    San Carlos Apache Tribe, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Edgewater, Colorado — EV Charger / EVSE Permit (Billed as General Electrical Work) record added

  • Permit type added

    Saratoga Springs, Utah — Automatic Fire Sprinkler Permit record added

  • Permit type added

    Saratoga Springs, Utah — Fire Alarm System Permit record added

  • Permit type added

    Cottonwood Heights, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Clifton, Arizona — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Denver, Colorado — EV Charger / EVSE Permit record added

  • Permit type added

    West Jordan, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Aztec, New Mexico — EV Charger / EVSE Installation Permit record added

  • Permit type added

    Flagstaff, Arizona — EV Charger / Electric Vehicle Charging Circuit Permit record added

  • Permit type added

    Larkspur, Colorado — EV Charger / EVSE Permit record added

  • Timeline updated

    Lewiston, Idaho — plan-review timeline record updated: 8–14 business days

  • Permit type added

    North Logan, Utah — Sign Permit record added

  • Permit type added

    Ogden, Utah — Sign Permit record added

  • Permit type added

    Orem, Utah — Sign Permit record added

  • Permit type added

    Sidney, Montana — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Commerce City, Colorado — Solar PV Permit record added

  • Permit type added

    Unincorporated Yavapai County, Arizona — Residential Solar PV Permit (Grid-Tied Exemption / Off-Grid / Panel Upgrade) record added

  • Permit type added

    Donnelly, Idaho — EV Charger / EVSE Permit (State of Idaho Electrical Permit) record added

  • Permit type added

    Unincorporated Davis County, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    City of Deer Lodge, Montana — Solar PV / Alternative Energy Permit (State-Issued) record added

  • Permit type added

    Lakewood, Colorado — EV Charger / EVSE Permit record added

  • Permit type added

    Laurel, Montana — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    City of Fountain, Colorado — EV Charger / EVSE Permit record added

  • Permit type added

    Youngtown, Arizona — Residential/Commercial Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Wellington, Colorado — Electric Vehicle (EV) Charging Station / EVSE Permit record added

  • Fee updated

    Dacono, Colorado — Rooftop Solar Photovoltaic (PV) Permit fee record added: Statewide aggregate fee cap on active solar energy system installs (reference only — does not currently bind Dacono's own fee) ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))

  • Permit type added

    Unincorporated Greenlee County, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Monticello, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Brigham City, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    St. George, Utah — Sign Permit record added

  • Permit type added

    Taylorsville, Utah — Sign Permit record added

  • Fee updated

    Springville, Utah — Fire Sprinkler, Alarm, and Hood Plan Review Permit fee record updated: No fire-marshal-specific dollar figure was found published on springvilleutah.gov or in the FY2025 Comprehensive Fee Schedule (Exhibit B). → No fire-marshal-specific dollar figure was found published on springvilleutah.gov or in either the FY2025 or the newer FY2026 Comprehensive Fee Schedule.

  • Permit type added

    Unincorporated Tooele County, Utah — Fire Sprinkler & Fire Alarm System Permit record added

  • Permit type added

    Unincorporated Grand County, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Alamogordo, New Mexico — EV Charger / EVSE Permit record added

  • Permit type added

    Jerome, Arizona — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Salt River Pima-Maricopa Indian Community, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Severance, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Polson, Montana — EV Charger / EVSE Permit record added

  • Permit type added

    Evanston, Wyoming — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Ephraim, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Colstrip, Montana — Solar PV / Alternative Energy Permit (State-Issued) record added

  • Fee updated

    Kersey, Colorado — Rooftop Solar Photovoltaic Permit fee record added: Electrical interconnection component (statutory statewide fee schedule) (Same valuation-based formula as the DORA/State Electrical Board schedule: $100-$120 base fee for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, capped in aggregate (with all other Kersey solar fees) at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113)

  • Timeline updated

    Heber City, Utah — plan-review timeline record updated: 10–10 business days

  • Permit type added

    Gypsum, Colorado — Solar Photovoltaic (PV) Permit record added

  • Fee updated

    Lamar, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Alternate energy equipment permit fee ($150.00 maximum)

  • Fee updated

    Lamar, Colorado — Rooftop Solar / Photovoltaic Permit fee record removed: Alternate energy equipment permit fee (state cap)

  • Fee updated

    Herriman, Utah — Fire Sprinkler System Permit fee record added: UFA Plan Review / Permit Fee (fire sprinkler systems) ($0 — UFA charges no separate plan-review or permit fee)

  • Fee updated

    Herriman, Utah — Fire Sprinkler System Permit fee record added: Third-Party Peer Review Fee (paid to private reviewer, not UFA) (Not published — set independently by each approved third-party reviewer)

  • Fee updated

    Herriman, Utah — Fire Alarm and Detection System Permit fee record added: UFA Plan Review / Permit Fee (fire alarm systems) ($0 — UFA charges no separate plan-review or permit fee)

  • Fee updated

    Herriman, Utah — Fire Alarm and Detection System Permit fee record added: Third-Party Peer Review Fee (paid to private reviewer, not UFA) (Not published — set independently by each approved third-party reviewer)

  • Permit type added

    South Weber, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Lovington, New Mexico — EV Charger / EVSE Permit record added

  • Permit type added

    Salt River Pima-Maricopa Indian Community, Arizona — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Guadalupe, Arizona — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Taylor, Arizona — Residential/Commercial Solar Photovoltaic (PV) System Permit record added

  • Permit type added

    Fruit Heights, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Wells, Nevada — Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) record added

  • Permit type added

    Eagle, Colorado — EV Charger / EVSE Permit (State of Colorado Electrical Board) record added

  • Fee updated

    Columbine Valley, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Statewide aggregate fee cap on active solar energy system installs ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))

  • Permit type added

    Unincorporated Weber County, Utah — Land Use Permit (Zoning / Change-of-Use Verification) record added

  • Permit type added

    Colorado Springs, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Unincorporated La Paz County, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Platteville, Colorado — EV Charger / EVSE Permit record added

  • Permit type added

    Unincorporated Madison County, Idaho — Solar Permit record added

  • Permit type added

    Crested Butte, Colorado — Electric Vehicle Charging Station Permit record added

  • Permit type added

    Unincorporated Valley County, Idaho — Solar Panel Permit (Panels on Existing Building) record added

  • Fee updated

    Unincorporated Millard County, Utah — Sign Permit (P-1/P-2/C-1 depending on sign type) fee record added: P-1 Permitted Use Permit — Commercial (canopy signs) ($85.00 (After the Fact $170.00))

  • Fee updated

    Unincorporated Millard County, Utah — Sign Permit (P-1/P-2/C-1 depending on sign type) fee record added: P-2 Permitted Use Permit (wall signs) ($130.00 (After the Fact $260.00))

  • Fee updated

    Unincorporated Millard County, Utah — Sign Permit (P-1/P-2/C-1 depending on sign type) fee record added: C-1 Conditional Use Permit (freestanding pylon and monument signs) ($165.00 (After the Fact $330.00))

  • Fee updated

    Unincorporated Millard County, Utah — Sign Permit (P-1/P-2/C-1 depending on sign type) fee record added: Small On-Premises / Freestanding Directional / Temporary Signs (No fee — no land use authority approval required)

  • Fee updated

    Unincorporated Millard County, Utah — Sign Permit (P-1/P-2/C-1 depending on sign type) fee record removed: P-1 Permitted Use/Sign Permit — Commercial

  • Fee updated

    Unincorporated Millard County, Utah — Sign Permit (P-1/P-2/C-1 depending on sign type) fee record removed: After the Fact fee (sign/use already established without a permit)

  • Permit type added

    Missoula County (Unincorporated), Montana — Electric Vehicle (EV) Charger Permit record added

  • Fee updated

    Logan, Utah — Sign Permit fee record added: Plan Review Fee (Sign Permit) (65% of the Sign Permit fee (commercial/non-dwelling plan review rate))

  • Fee updated

    Logan, Utah — Sign Permit fee record updated: Based on the cost of the sign (valuation-based) → Uses the same valuation-based Building Permit Fees table as all other Logan building permits, applied to the sign's cost

  • Permit type added

    North Logan, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Pleasant View, Utah — EV Charger / EVSE Permit record added