What changed — page 15
Older changes to PermitBase’s verified permit dataset, newest first. The most recent changes are on the first page.
July 20, 2026
- Permit type added
Unincorporated Power County, Idaho — Solar PV Permit record added
- Permit type added
Riverdale, Utah — Fire Sprinkler & Fire Alarm Permit record added
- Permit type added
Unincorporated Jefferson County, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Minidoka County (Building Authority for Unincorporated County and the Cities of Acequia, Minidoka, Paul, and Rupert), Idaho — Solar PV Permit record added
- Permit type added
Cottonwood Heights, Utah — Sign Permit record added
- Permit type added
Draper, Utah — Sign Permit record added
- Permit type added
Unincorporated Fremont County, Wyoming — EV Charger / EVSE Permit record added
- Permit type added
Kimberly, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Yavapai-Apache Nation, Arizona — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Payson, Utah — Automatic Fire Sprinkler System Permit record added
- Permit type added
Payson, Utah — Fire Alarm System Permit record added
- Permit type added
Albuquerque, New Mexico — EV Charger / EVSE Permit record added
- Permit type added
Livingston, Montana — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Las Cruces, New Mexico — EV Charger / EVSE Permit record added
- Permit type added
Delta, Colorado — Solar Permit record added
- Permit type added
Sidney, Montana — EV Charger / EVSE Permit record added
- Permit type added
Mountain Home, Idaho — Solar Photovoltaic (PV) Permit record added
- Codes updated
Taylorsville, Utah — adopted-codes record updated
- + 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle statewide. CORRECTION (2026-07-20, supersedes the 2026-07-16 note below): the 07-16 edit claimed Taylorsville's page had been updated to 'correctly' list 2023 N.E.C. and that the prior 2020-NEC lag was resolved — that was wrong. The page genuinely contradicts itself and still does as of this re-check: a summary table near the top states the statewide-adopted codes verbatim ('2024 I.B.C., 2021 I.R.C., 2024 I.P.C., 2024 I.M.C., 2024 I.F.G.C., 2024 I.E.C.C., 2023 N.E.C.'), but the page's own FAQ section separately answers 'What codes and standards does the building department use?' with: 'Currently we are using the 2021 I-codes with 2017 A.N.S.I. 117.1 as the accessibility standard, and the 2020 National Electrical Code.' Confirmed via a 2026-07-08 Wayback snapshot (predating the 07-16 edit) already showing that exact FAQ text, and independently re-confirmed live 2026-07-20 — the page has not changed; the 07-16 edit simply picked one side of an internal contradiction and declared it resolved. Reported here as-is rather than guessing which statement the department actually enforces in practice.
- + NOTE (2026-07-20, supersedes the 2026-07-16 corpus-staleness note below): the IBC/IRC/IPC/IMC/IFGC/IECC lines above match the page's top summary table verbatim, independently re-confirmed 2026-07-20. But that table is not the whole story — see the NEC line's correction above for the page's separate, contradicting FAQ answer, which claims the department is 'currently using' the 2021 I-codes generally (not just for NEC). Treat every 'current as of 7/1/2026' framing above as citing the summary table specifically, not as a claim that Taylorsville's practice has been independently confirmed to match it. The International Fire Code (IFC) is not adopted anywhere in §15A-2-103 and is not listed on Taylorsville's page either — that part of the original 07-16 note still holds.
- − 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle. NOTE (2026-07-16 re-verification): a prior version of this file recorded Taylorsville's building page as referencing '2020 NEC,' but the page re-fetched live 2026-07-16 now correctly lists '2023 N.E.C.' verbatim — the city-page lag previously flagged here has been resolved by the city and no longer exists.
- − NOTE (2026-07-16 corpus-staleness fix): This file previously stated the 2021 editions of IBC/IPC/IMC/IFGC/IECC as current (citing a 2026-06-30 fetch of Taylorsville's building page) with only a forward-looking NOTE about the 7/1/2026 flip. Re-fetched live 2026-07-16: Taylorsville's own building department page has since been updated by the city to display the current 2024 editions (plus 2021 IRC and 2023 NEC) verbatim, matching Utah Code § 15A-2-103 exactly — Taylorsville is NOT lagging the statewide mandate. The International Fire Code (IFC) is not adopted anywhere in §15A-2-103 and is not listed on Taylorsville's page either.
- Permit type added
Herriman, Utah — EV Charger / EVSE Permit record added
- Permit type added
Midvale, Utah — EV Charger / EVSE Permit record added
- Permit type added
Greeley, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Dacono, Colorado — Electric Vehicle Charging Station Permit record added
- Permit type added
Shelley, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Holyoke, Colorado — Rooftop Solar Photovoltaic Permit record added
- Permit type added
Steamboat Springs, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Gallup, New Mexico — Residential Solar Photovoltaic (PV) Permit record added
- Permit type added
Rathdrum, Idaho — EV Charging Station Permit (State-Issued Electrical Permit) record added
- Permit type added
Unincorporated Nez Perce County, Idaho — Solar PV Permit record added
- Fee updated
Fruit Heights, Utah — Solar Panel (PV) Permit fee record added: Building/Electrical Permit Fee (valuation-based tiered table) ($28.30 for the first $500 of valuation, rising per tier to $6,730.50 for the first $1,000,000 plus $4.38 per additional $1,000 (full table: $501-$2,000 = $28.30 + $23.66/$1,000; $2,001-$25,000 = $83.10 + $16.80/$1,000; $25,001-$50,000 = $470.10 + $12.12/$1,000; $50,001-$100,000 = $772.50 + $8.40/$1,000; $100,001-$500,000 = $1,192.50 + $6.72/$1,000; $500,001-$1,000,000 = $3,880.50 + $5.70/$1,000; over $1,000,000 = $6,730.50 + $4.38/$1,000))
- Fee updated
Fruit Heights, Utah — Solar Panel (PV) Permit fee record added: New Application Fee ($250.00)
- Fee updated
Fruit Heights, Utah — Solar Panel (PV) Permit fee record added: Building Permit Review/Inspection Fee (remodels/re-roofs/retrofits, incl. electrical/solar) ($100.00)
- Fee updated
Fruit Heights, Utah — Solar Panel (PV) Permit fee record added: Inspection For Which No Fee Is Specifically Indicated (catch-all) ($125.00 per hour (minimum charge 0.5 hours))
- Fee updated
Fruit Heights, Utah — Solar Panel (PV) Permit fee record added: Additional Plan Review Required By Revisions ($135.00 per hour (minimum charge 0.5 hours))
- Permit type added
Somerton, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Unincorporated Wayne County, Utah — EV Charger / EVSE Permit record added
- Permit type added
South Tucson, Arizona — EV Charger / EVSE Permit record added
- Fee updated
Monticello, Utah — Sign Permit fee record updated: Set by resolution of the Monticello City Council → $20.00
- Permit type added
Post Falls, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Centennial, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Woodland Park, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Safford, Arizona — Solar PV Permit record added
- Permit type added
Cheyenne Wells, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added
- Fee updated
Unincorporated Albany County, Wyoming — Electric Vehicle (EV) Charger Permit (State Program) fee record added: All other electrical installations (statutory category covering a new EV charger branch circuit) ($20.00 plus $0.50 per ampere rating of the electrical service)
- Permit type added
Woods Cross, Utah — Fire Sprinkler System Permit record added
- Permit type added
Woods Cross, Utah — Fire Alarm System Permit record added
- Permit type added
Walsh, Colorado — Solar PV Installation (Building Permit) record added
- Permit type added
Morrison, Colorado — Electric Vehicle (EV) Charger Permit record added
- Permit type added
San Luis, Arizona — EV Charger / EVSE Permit (Electrical Permit) record added
- Permit type added
Parker, Arizona — Residential Solar Photovoltaic (PV) Permit record added
- Permit type added
Glenwood Springs, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Unincorporated Yellowstone County, Montana — Electric Vehicle (EV) Charging Station / EVSE Permit (State Electrical Permit) record added
- Permit type added
Nunn, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Midvale, Utah — Fire Sprinkler / Fire Alarm System Peer Review and Permit record added
- Permit type added
Walsh, Colorado — Electric Vehicle (EV) Charging Station / EVSE Permit record added
- Permit type added
Unincorporated Washoe County, Nevada — EV Charger (EVSE) Permit record added
- Permit type added
Unincorporated Greenlee County, Arizona — Solar PV Permit record added
- Permit type added
Marana, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Roosevelt, Utah — EV Charger / EVSE Permit record added
- Permit type added
Palisade, Colorado — Solar Photovoltaic (PV) Permit — Town Planning Clearance + Mesa County Building Permit record added
- Permit type added
Preston, Idaho — Solar PV Permit (State-Issued Electrical + City Building Permit) record added
- Permit type added
Quartzsite, Arizona — EV Charging Station Permit (Electrical Permit) record added
- Fee updated
Unincorporated Coconino County, Arizona — Solar PV Permit — Self-Issue Residential Rooftop (Grid-Tied) and Residential Miscellaneous (All Other Solar) fee record added: Photovoltaic systems up to 10 kilowatt (kW) ($75.00)
- Fee updated
Unincorporated Coconino County, Arizona — Solar PV Permit — Self-Issue Residential Rooftop (Grid-Tied) and Residential Miscellaneous (All Other Solar) fee record added: Photovoltaic systems over 10 kilowatt (kW) ($75.00 each plus $5.00 for each additional kW over 10)
- Fee updated
Unincorporated Coconino County, Arizona — Solar PV Permit — Self-Issue Residential Rooftop (Grid-Tied) and Residential Miscellaneous (All Other Solar) fee record removed: Photovoltaic system, up to 10 kW / over 10 kW (unit fee, two tiers)
- Permit type added
Cortez, Colorado — Electric Vehicle Charging Station Permit (State-Issued Electrical Permit) record added
- Permit type added
Cheyenne, Wyoming — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Logan, Utah — EV Charger / EVSE Permit record added
- Permit type added
Show Low, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Lone Tree, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Sandpoint, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Syracuse, Utah — EV Charger / EVSE Permit record added
- Permit type added
Colorado City, Arizona — Solar Photovoltaic (PV) Permit record added
- Permit type added
Unincorporated Uinta County, Wyoming — Solar / Alternative Energy PV Permit (State Plan Review) + Land Use Certificate record added
- Permit type added
Harrison, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Delta, Colorado — EV Charger / EVSE Permit (Electrical Permit) record added
- Permit type added
Holbrook, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Carson City, Nevada — EV Charger / EVSE Permit record added
- Permit type added
Alpine, Utah — EV Charger / EVSE Permit record added
- Permit type added
Cascade, Idaho — EV Charger / EVSE Permit record added
- Fee updated
Bloomfield, New Mexico — Sign Permit fee record added: Sign Permit Application (City of Bloomfield, zoning) ($3.00 per square foot of sign area)
- Fee updated
Bloomfield, New Mexico — Sign Permit fee record added: Sign Permit (San Juan County, structural/building) — Building Permit Fee (Project valuation x 0.005)
- Fee updated
Bloomfield, New Mexico — Sign Permit fee record added: Sign Permit (San Juan County) — Building Plan Review Fee (Project valuation x 0.0012)
- Fee updated
Bloomfield, New Mexico — Sign Permit fee record removed: Sign Permit Application
- Fee updated
Tooele, Utah — Sign Permit fee record updated: Per IBC → Calculated from project valuation using IBC-established rate tables ("Per IBC")
- Permit type added
Saguache, Colorado — Solar PV Permit (Town Building Permit, Statewide Fee Cap) record added
- Permit type added
Richfield, Utah — Change of Use (Conditional C-1/C-2 Use Application) record added
- Permit type added
Wheat Ridge, Colorado — Electric Vehicle Charger Permit record added
- Permit type added
Sterling, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Salmon, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Unincorporated Ada County, Idaho — EV Charger / EVSE Electrical Permit record added
- Permit type added
Hayden, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Kuna, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Unincorporated San Juan County, New Mexico — EV Charger / EVSE Permit record added
- Permit type added
Eloy, Arizona — EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished) record added
- Permit type added
Basalt, Colorado — EV Charger / EVSE Installation Permit record added
- Permit type added
Garden City, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Santa Fe, New Mexico — EV Charger / EVSE Permit (Electrical Permit) record added
- Permit type added
Farmington, New Mexico — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Winnemucca, Nevada — Solar Photovoltaic (PV) Permit record added
- Fee updated
American Falls, Idaho — EV Charger / EVSE Permit fee record added: Existing Residence / Detached Shop — additional branch circuit (covers a standalone EV charger circuit; no EV-specific line item published) ($65 flat (includes one circuit), plus $10 per additional branch circuit, up to the maximum of the corresponding square footage of the building)
- Fee updated
American Falls, Idaho — EV Charger / EVSE Permit fee record removed: DOPL electrical permit fee (no EV-specific line item found)
- Fee updated
Unincorporated Fremont County, Wyoming — EV Charger / EVSE Permit fee record added: All other electrical installations (statutory category covering a new EV charger branch circuit) ($20.00 plus $0.50 per ampere rating of the electrical service)
- Permit type added
Unincorporated Iron County, Utah — EV Charger / EVSE Permit record added
- Permit type added
Haxtun, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Riverton, Utah — EV Charger / EVSE Permit record added
- Permit type added
Clarkdale, Arizona — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Woodland Park, Colorado — Solar Photovoltaic (PV) Permit record added
- Permit type added
Coalville, Utah — EV Charger / EVSE Permit record added
- Permit type added
Parker, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Fort Mojave Indian Tribe, Arizona — EV Charger / Electric Vehicle Charging Station Installation (via General Building Permit) record added
- Permit type added
Youngtown, Arizona — EV Charger / Electric Vehicle Charging Station Permit record added
- Fee updated
Victor, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: State Electrical Permit — Existing Dwelling Unit Permit (residential EVSE circuit added to an existing home) ($65.00 per inspection (flat; no per-branch-circuit surcharge))
- Fee updated
Victor, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record added: DOPL Electrical Permit — Other Installations (Including Industrial and Commercial) Permit (new construction, commercial, or multi-family EVSE) (Wiring cost up to $10,000: $60 plus 2% of total wiring cost; $10,001-$100,000: $260 plus 1% of excess over $10,000; over $100,000: $1,160 plus 0.5% of excess over $100,000)
- Fee updated
Victor, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit fee record removed: State Electrical Permit Fee (EV charger/EVSE circuit)
- Permit type added
Blue River, Colorado — EV Charger / EVSE Installation Permit record added
- Permit type added
Wallace, Idaho — Solar PV Installation (Building Permit + Certificate of Appropriateness) record added
- Permit type added
Emmett, Idaho — EV Charger / EVSE Permit (Billed as Residential/Commercial Building Permit) record added
- Permit type added
Riverton, Wyoming — EV Charging Station Permit (Electrical Permit) record added
- Fee updated
Nephi, Utah — Sign Permit fee record added: Sign Permit Fee (Sign on Pole) ($0.00 base; additional fee determined by the Building Inspector based on valuation)
- Fee updated
Nephi, Utah — Sign Permit fee record removed: Sign Permit Fee
- Permit type added
Forsyth, Montana — EV Charger / Electric Vehicle Charging Circuit Permit (State-Issued) record added
- Fee updated
Ketchum, Idaho — Electric Vehicle (EV) Charger / EVSE Permit (State of Idaho) fee record added: Existing Residential Dwelling Unit Permit ($65 per inspection)
- Fee updated
Ketchum, Idaho — Electric Vehicle (EV) Charger / EVSE Permit (State of Idaho) fee record removed: Existing Residence / Detached Shop / Modular, Manufactured or Mobile Home
- Permit type added
Sheridan, Wyoming — EV Charger / EVSE Permit (Electrical Simple Permit) record added
- Permit type added
Unincorporated Valley County, Idaho — Electric Vehicle (EV) Charging Station / EVSE Permit record added