What changed — page 22
Older changes to PermitBase’s verified permit dataset, newest first. The most recent changes are on the first page.
July 20, 2026
- Permit type added
Roy, Utah — Fire Sprinkler System Permit record added
- Permit type added
Cripple Creek, Colorado — Electric Vehicle Charging Station Permit record added
- Permit type added
Cut Bank, Montana — Electric Vehicle Charging Station Permit (State-Issued Electrical Permit) record added
- Permit type added
East Helena, Montana — EV Charger / EVSE Permit — State-Issued Electrical Permit (No Distinct Line Item) record added
- Permit type added
Rigby, Idaho — EV Charging Station Permit (State-Issued Electrical Permit) record added
- Permit type added
Vernal, Utah — EV Charger / EVSE Permit record added
- Permit type added
Unincorporated Bingham County, Idaho — EV Charger / EVSE Electrical Permit record added
- Permit type added
Calhan, Colorado — EV Charger / EVSE Permit record added
- Permit type added
Toole County (Unincorporated), Montana — Residential/Commercial Solar Photovoltaic (PV) Permit (State-Issued) record added
- Permit type added
Lewistown, Montana — EV Charger / Electric Vehicle Charging Station Permit record added
- Permit type added
Salmon, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Jerome, Arizona — Electric Vehicle (EV) Charger / EVSE Permit record added
- Permit type added
Bernalillo, New Mexico — EV Charger / EVSE Installation Permit record added
- Permit type added
Richland County (Unincorporated Areas and Towns, excluding Sidney), Montana — Solar PV / Alternative Energy Permit (County Structural + State-Issued Electrical) record added
- Permit type added
Unincorporated Gila County, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Bullhead City, Arizona — EV Charger / EVSE Permit record added
- Fee updated
Colstrip, Montana — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Single Family Interior/Exterior Wire or Rewire -- item H: 1 additional circuit or piece of equipment ($45)
- Fee updated
Washington City, Utah — Sign Permit fee record added: Sign Permit (Planning Review Fee) ($35.00)
- Fee updated
Washington City, Utah — Sign Permit fee record added: Conditional Use Permit - Signs ($100.00)
- Fee updated
Washington City, Utah — Sign Permit fee record added: Building Permit Fee Table (if the sign also requires a building permit) (Per the city's duly adopted Building Permit Fee Table (see the residential/commercial building permit entries in this file), plus a 45% plan review fee)
- Fee updated
Washington City, Utah — Sign Permit fee record removed: Sign Permit Fee
- Permit type added
Unincorporated Kane County, Utah — Sign Permit record added
- Permit type added
Unincorporated Salt Lake County, Utah — Sign Permit record added
- Permit type added
Malad City, Idaho — Solar PV Permit record added
- Permit type added
Melba, Idaho — EV Charger / EVSE Permit record added
- Permit type added
Missoula, Montana — Electric Vehicle (EV) Charger Permit record added
- Permit type added
Bloomfield, New Mexico — Solar PV Permit record added
- Permit type added
Eagle, Idaho — EV Charger / EVSE Permit (Electrical Permit) record added
- Permit type added
Wilder, Idaho — Solar Photovoltaic (PV) Permit record added
- Permit type added
Bow Mar, Colorado — Solar Photovoltaic (PV) Permit record added
- Fee updated
Yuma, Arizona — EV Charger / Electric Vehicle Charging Station Permit fee record added: Power Apparatus (kW/HP/kVA/kVAR-rated equipment — most specifically applicable Table 1-A bracket for the EVSE unit itself) (Up to and including 1 kW/HP/kVA: $5.00; over 1 to 10: $13.00; over 10 to 50: $25.00; over 50 to 100: $50.00; over 100: $67.00)
- Permit type added
Centerville, Utah — Sign Permit record added
- Permit type added
Coalville, Utah — Sign Permit record added
- Fee updated
Unincorporated Sanpete County, Utah — Solar PV Permit fee record added: Building Permit Fee (Valuation-based per ICC Building Valuation Data, run through the county's Building Permit Fee Calculator, with a 1.5x 'county factor' for unincorporated land)
- Permit type added
Rifle, Colorado — Solar PV Permit (Building Permit + State-Issued Electrical, Statewide Fee Cap) record added
- Permit type added
South Tucson, Arizona — Solar Photovoltaic (PV) Permit record added
- Permit type added
Sandy, Utah — Sign Permit record added
- Permit type added
Saratoga Springs, Utah — Sign Permit (Permanent Sign) record added
- Permit type added
Pinetop-Lakeside, Arizona — EV Charger / EVSE Permit record added
- Permit type added
Laramie, Wyoming — EV Charger / EVSE Permit record added
July 19, 2026
- Permit type added
Ephraim, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Payson, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Tremonton, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Unincorporated Grand County, Utah — Solar Permit record added
- Permit type added
Vernal, Utah — Solar Panel (PV) Permit record added
- Permit type added
Brigham City, Utah — Residential Solar / PV System (Distributed Generation Interconnection) record added
- Fee updated
Logan, Utah — Solar Panel Permit fee record added: Solar Permit (Commercial — Building Division only) ($200.00)
- Fee updated
Logan, Utah — Solar Panel Permit fee record updated: $200.00 → Based on Project Value
- Fee schedule re-verified
Midvale, Utah — fee schedule re-verified across 1 permit type
- Permit type added
Murray, Utah — EV Charger / EVSE Permit record added
- Permit type added
Unincorporated Carbon County, Utah — Solar Panel (PV) Permit record added
- Permit type added
North Logan, Utah — Photovoltaic (PV) System Permit record added
- Permit type added
Unincorporated Wasatch County, Utah — Solar PV Permit record added
- Fee updated
Alpine, Utah — Commercial Building Permit fee record updated: Same graduated table as residential: $1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation for commercial buildings is computed via Appendix A using the applicable ICC occupancy-group rate — e.g., Group B (Business), Type VB construction: $108.47/sq ft; Type IA: $161.16/sq ft (Appendix A, 'Square Foot Construction Costs,' 2008 ICC Building Valuation Data table). → Same graduated table as residential: $1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation for commercial buildings is computed via Appendix A using the applicable ICC occupancy-group rate — e.g., Group B (Business), Type VB construction: $109.47/sq ft; Type IA: $161.10/sq ft (Appendix A, 'Square Foot Construction Costs,' 2008 ICC Building Valuation Data table).
- Fee updated
Alpine, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: Same graduated table as new construction: $1–$500: $24, up to $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation is computed via Appendix A using the applicable commercial occupancy group (e.g., Group B Business: $108.47/sq ft, Type VB) — Appendix A's footnote (c) states 'Per shell only buildings deduct 20 percent,' which may be relevant if the tenant space was previously unfinished shell. → Same graduated table as new construction: $1–$500: $24, up to $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation is computed via Appendix A using the applicable commercial occupancy group (e.g., Group B Business: $109.47/sq ft, Type VB) — Appendix A's footnote (c) states 'Per shell only buildings deduct 20 percent,' which may be relevant if the tenant space was previously unfinished shell.
- Fee updated
Cedar City, Utah — Commercial Building Permit fee record updated: $636.00 per 1,000 sq ft → $2,516.00 per 1,000 sq ft
- Fee updated
Cedar City, Utah — Commercial Building Permit fee record updated: 1-inch meter $1,935.00; up to larger meter sizes priced proportionally per the schedule's meter-size table → 1-inch meter $3,892.00; up to larger meter sizes priced proportionally per the schedule's meter-size table
- Fee updated
Layton, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record added: Fire Sprinkler — Existing System Remodel (commercial tier) ($100 (0–3,000 sq ft); $150 (3,001–10,000 sq ft); $150 + $0.005/sq ft over 10,000 sq ft; $50 for minor relocation of 10 heads or fewer)
- Fee updated
Layton, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record removed: Fire Sprinkler — Existing System Remodel (relevant where the tenant space has existing sprinklers)
- Fee updated
Pleasant Grove, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: $250.00 → $250.00 per fee_schedule.php, but $75.00 per building.php — the city's own two pages disagree
- Fee updated
Roosevelt, Utah — Commercial Building Permit fee record updated: $5,000.00 (includes $3,500.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line → $3,000.00 (includes $3,000.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line
- Fee updated
Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: $5,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures → $3,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures
- Fee updated
South Weber, Utah — Commercial Building Permit fee record removed: SWPPP Inspection (per year) — Commercial/Multi-Family Site
- Fee updated
South Weber, Utah — Commercial Building Permit fee record removed: SWPPP Violation Bond (refundable) — Commercial
- Fee updated
South Weber, Utah — Commercial Building Permit fee record removed: Site Plan Improvements Inspection (Commercial & Multi-Family)
- Fee updated
Unincorporated Wasatch County, Utah — Commercial Building Permit fee record removed: Plan Review Fee
- New jurisdictions
2 new Idaho jurisdictions: Rupert, City of St. Maries
- Permit type added
Unincorporated Garfield County, Utah — Solar Permit record added
- New jurisdictions
1 new Arizona jurisdictions: City of St. Johns
- Permit type added
North Salt Lake, Utah — Solar Panel (PV) Permit record added
- Permit type added
Payson, Utah — Solar Distributed Generation (Solar PV) Permit record added
- Fee updated
Town of Carbondale, Colorado — Residential Addition Building Permit fee record updated: Per the same valuation-based bracket table as new residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as new residential construction (see residential-building-permit)
- Fee updated
Town of Carbondale, Colorado — Residential Remodel Building Permit fee record updated: Per the same valuation-based bracket table as new residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as new residential construction (see residential-building-permit)
- Fee updated
Town of Carbondale, Colorado — New Commercial Building Permit fee record updated: Per the same valuation-based bracket table as residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as residential construction (see residential-building-permit)
- Fee updated
Town of Carbondale, Colorado — Commercial Remodel / Tenant Finish Permit fee record updated: Per the same valuation-based bracket table as residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as residential construction (see residential-building-permit)
- Fee updated
Town of Carbondale, Colorado — Commercial Addition Permit fee record updated: Per the same valuation-based bracket table as residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as residential construction (see residential-building-permit)
- Permit type added
Town of Carbondale, Colorado — New Single-Family Dwelling, Duplex, or Townhouse Building Permit record added
- Permit type added
Town of Carbondale, Colorado — Re-roof, Window, and Door Replacement Permit record added
- Permit type removed
Town of Carbondale, Colorado — New Single-Family Dwelling, Duplex, or Townhouse Building Permit record removed
- Permit type removed
Town of Carbondale, Colorado — Re-roof, Window, and Door Replacement Permit record removed
- Permit type added
Edgewood, New Mexico — State Building Permit (NM Construction Industries Division) record added
- Permit type removed
Edgewood, New Mexico — State Building Permit (NM Construction Industries Division) record removed
- Permit type added
Ephraim, Utah — Single-Family Residential Building Permit record added
- Permit type removed
Ephraim, Utah — Single-Family Residential Building Permit record removed
- Permit type added
Roosevelt, Utah — Residential/Duplex Building Permit record added
- Permit type removed
Roosevelt, Utah — Residential/Duplex Building Permit record removed
- Permit type added
Woodland Park, Colorado — Building Permit (Pikes Peak Regional Building Department) record added
- Permit type removed
Woodland Park, Colorado — Building Permit (Pikes Peak Regional Building Department) record removed
- Permit type added
Salt Lake City, Utah — EV Charger / EVSE Permit record added
- Permit type added
Pleasant Grove, Utah — Commercial Building Permit record added
- Permit type added
Pleasant Grove, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Unincorporated Daggett County, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Vernal, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Vineyard, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
- Permit type added
Unincorporated Sanpete County, Utah — Solar PV Permit record added
- Permit type added
Price, Utah — Solar PV Permit record added
- New jurisdictions
5 new Colorado jurisdictions: Town of Carbondale, Englewood, City of Fountain, Gunnison, Woodland Park
- Permit type added
Santa Clara, Utah — Solar PV Permit record added
- Permit type added
Ephraim, Utah — Solar Panel (PV) Permit record added
- Permit type added
Farmington, Utah — Solar Panel (PV) Permit record added
- Permit type added
Springville, Utah — Solar Panel (PV) Permit record added
- Bulk update
Permit-type records re-verified across 73 jurisdictions
- Permit type added
City of St. Maries, Idaho — Building Permit record added
- Permit type removed
City of St. Maries, Idaho — Building Permit record removed
- Fee updated
Gunnison, Colorado — Building Permit fee record updated: null → $1.00-$500.00: $24.00. $501.00-$2,000.00: $24.00 for the first $500 plus $3.00 for each additional $1,000 or fraction thereof. $2,001.00-$40,000.00: $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof. $40,001.00-$100,000.00: $487.00 for the first $40,000 plus $9.00 for each additional $1,000 or fraction thereof. $100,001.00-$500,000.00: $1,027.00 for the first $100,000 plus $7.00 for each additional $1,000 or fraction thereof. $500,001.00-$1,000,000.00: $3,827.00 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof. $1,000,001.00-$5,000,000.00: $6,327.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof. $5,000,001.00 and over: $18,327.00 for the first $5,000,000 plus $1.00 for each additional $1,000 or fraction thereof.
- Fee updated
Gunnison, Colorado — Mechanical Permit fee record updated: null → Permit issuance fee $22.00 (plus $6.50 for each supplemental permit while the original permit has not expired). Itemized fees (do not include the issuance fee): Furnaces (forced air/gravity furnace or burner, incl. ducts/vents) $13.25; suspended heater, recessed wall heater, or floor-mounted unit heater $13.25; Appliance Vents $6.50; Repairs/Additions to a heating, refrigeration, cooling, or absorption unit or system (incl. controls) $12.25; Boilers, Hot Water Heaters, and Compressors $16.50; Air Handler Equipment $16.50; Evaporative Cooler (non-portable) $9.50; ventilation/exhaust fan connected to a single duct $6.50; ventilation/exhaust system not part of a heating/AC system $9.50; mechanical-exhaust hood incl. ductwork $9.50; Solid Fuel Burning Device (chimney-connected) $20.00; Miscellaneous appliance/equipment not otherwise listed $9.50. Other inspections outside normal business hours and re-inspections: $64.25/hr (two-hour minimum for after-hours; one-hour minimum for re-inspection).
- Fee updated
Gunnison, Colorado — Mobile Home Permit fee record updated: null → Same valuation-based fee structure as the general Building Permit (the 'Appendix L' bracket schedule — see the building-permit permitType's 'Base Building Permit Fee' entry), applied to a valuation equal to the actual cost of the manufactured/mobile home plus the actual cost of the foundation — not the ICC Building Valuation Data Table used for site-built construction.
- Fee updated
Lovington, New Mexico — Water/Sewer Connection Permit fee record added: Water meter fee (new meter cost, by size) (¾ inch meter: $1,000.00; 1 inch meter: $1,000.00; 2 inch meter: $2,050.00; 3 inch meter: $3,500.00; 4 inch meter: $4,500.00; 5 inch meter: $6,000.00)
- Fee updated
Lovington, New Mexico — Water/Sewer Connection Permit fee record removed: Water meter fee
- Permit type added
Moab, Utah — Solar PV Permit record added
- Bulk update
Permit-type records re-verified across 31 jurisdictions
- New jurisdictions
3 new Utah jurisdictions: Ephraim, Kanab, Roosevelt
July 18, 2026
- Timeline updated
Bernalillo, New Mexico — plan-review timeline record updated: not published by the jurisdiction
- Timeline updated
Bernalillo, New Mexico — plan-review timeline record updated: not published by the jurisdiction
- Codes updated
Broomfield, Colorado — adopted-codes record updated
- + Wildland Urban Interface (WUI) Code: a state-mandated model code (Colorado Wildfire Resiliency Code Board) that all Colorado jurisdictions must adopt to at least the state model's requirements by March 1, 2026; the City's Building Division page carries unchanged 2025-vintage text (re-fetched live 2026-07-18, identical to the 2026-07-03 capture, and itself referencing a '2025 Colorado Wildfire Resiliency Code Broomfield Voice page') stating Broomfield had not yet held its adoption hearing and was not expected to consider adoption until early 2026, with a public hearing still pending. The March 1, 2026 statewide deadline has now passed with no page update — this notice reads as stale but no superseding adoption notice was found on the same page. Confirm current status directly with the Building Division before relying on it. Source: City and County of Broomfield Building Division page, 'Wildland Urban Interface Code' notice.
- − Wildland Urban Interface (WUI) Code: a state-mandated model code (Colorado Wildfire Resiliency Code Board) that all Colorado jurisdictions must adopt to at least the state model's requirements by March 1, 2026; as of the City's Building Division page (reviewed 2026-07-03), Broomfield had not yet held its adoption hearing and was not expected to consider adoption until early 2026, with a public hearing still pending. Confirm current status before relying on it. Source: City and County of Broomfield Building Division page, 'Wildland Urban Interface Code' notice.
- New jurisdictions
5 new New Mexico jurisdictions: Aztec, Bernalillo, Bloomfield, Edgewood, Village of Los Ranchos de Albuquerque
- New jurisdictions
2 new New Mexico jurisdictions: Artesia, Lovington
- New jurisdictions
1 new Wyoming jurisdictions: Lander
July 17, 2026
- Bulk update
Adopted-codes records re-verified across 9 jurisdictions
- Fee updated
Arvada, Colorado — Roofing Permit (Re-Roofing) fee record added: Roofing Valuation Basis (per 100 sq ft) — used to compute the Table 18-1 fee when actual contract cost is not documented (3-tab: $187.50/100 sf; Dimensional shingles: $252.00/100 sf; Shakes (untreated): $439.00/100 sf; Light-weight tile: $439.00/100 sf; other/special/treated shakes: use actual contract amount)
- Timeline updated
Arvada, Colorado — plan-review timeline record updated: 5–15 business days
- Timeline updated
Arvada, Colorado — plan-review timeline record updated: 40–70 business days
- Fee updated
Bountiful, Utah — Roofing Permit fee record added: Residential Reroof or Roof Recover Permit (over-the-counter) ($151.50 ($150.00 permit + $1.50 state fee))
- Fee updated
Bountiful, Utah — Roofing Permit fee record added: Commercial Re-Roof Permit (Valuation-based per City and State standards)