July 20, 2026

  • Permit type added

    Duncan, Arizona — EV Charger / EVSE Permit (via General Building Permit) record added

  • Permit type added

    Federal Heights, Colorado — EV Charger / Electric Vehicle Charging Station Permit (State-Administered) record added

  • Permit type added

    Spirit Lake, Idaho — Electric Vehicle (EV) Charging Station Permit record added

  • Permit type added

    Huachuca City, Arizona — Solar Photovoltaic (PV) Permit record added

  • Fee updated

    Mountain View, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Electrical Fee (solar interconnection scope) (Statewide valuation-based schedule under C.R.S. § 12-23-117: base fee ~$100-$120 for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, which any Colorado local government (including Mountain View) may scale up to 1.15x — capped in aggregate at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113)

  • Fee updated

    Mountain View, Colorado — Rooftop Solar / Photovoltaic Permit fee record removed: Electrical Fee

  • Permit type added

    Malad City, Idaho — EV Charger / EVSE Permit record added

  • Permit type added

    Washington Terrace, Utah — EV Charger / EVSE Permit record added

  • Fee updated

    Lovington, New Mexico — Solar PV Permit fee record added: State Building Permit (CID) Fee — structural/racking scope ($3.00 per $1,000 of valuation up to $15,000, plus $1.00 per $1,000 of valuation over $15,000, plus a 20% plan review fee on top of the building permit fee)

  • Fee updated

    Lovington, New Mexico — Solar PV Permit fee record added: State Electrical Permit (CID) Fee — PV interconnection scope (Residential, by service size: 100A or less $45.00; over 100-200A $72.00; over 200-320A $99.00; over 320-400A $225.00; over 400A $360.00 (live CID rate, includes the 1.8x multiplier applied to the base NMAC rate); plus $40.00/hr for plan review)

  • Fee updated

    Lovington, New Mexico — Solar PV Permit fee record removed: State Building Permit (CID) Fee (electrical/structural, PV interconnection and racking)

  • Permit type added

    Unincorporated Cache County, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Choteau, Montana — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Fort Mojave Indian Tribe, Arizona — Residential/Small Solar Photovoltaic (PV) Installation (via General Building Permit) record added

  • Permit type added

    Hardin, Montana — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Unincorporated Davis County, Utah — Fire Sprinkler and Fire Alarm System Permit record added

  • Permit type added

    City of Globe, Arizona — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Soda Springs, Idaho — EV Charger / EVSE Permit record added

  • Permit type added

    Gila Bend, Arizona — Residential Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Rathdrum, Idaho — Solar PV Permit (City Building Permit + State-Issued Electrical) record added

  • Permit type added

    City of Fountain, Colorado — Solar PV Permit record added

  • New jurisdictions

    1 new Montana jurisdictions: Missoula County (Unincorporated)

  • Timeline updated

    Coalville, Utah — plan-review timeline record updated: 30–30 business days

  • Permit type added

    Farr West, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    Farr West, Utah — Fire Alarm System Permit record added

  • Permit type added

    West Wendover, Nevada — EV Charger Installation (Building + Electrical Permit) record added

  • Permit type added

    Unincorporated Albany County, Wyoming — Solar Energy Permit record added

  • Permit type added

    Douglas, Arizona — EV Charger / EVSE Permit (Electrical Permit) record added

  • Permit type added

    Darby, Montana — Solar PV Permit (via Town Electrical Permit) record added

  • Permit type added

    Vernal, Utah — Sign Permit record added

  • Permit type added

    Washington Terrace, Utah — Sign Permit record added

  • Permit type added

    American Fork, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Carlsbad, New Mexico — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Millcreek, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Idaho Falls, Idaho — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Fee updated

    West Bountiful, Utah — Fire Sprinkler System Permit fee record added: Sprinkler Plan Review ($100 per hour, minimum 1 hour ($100 minimum))

  • Fee updated

    West Bountiful, Utah — Fire Sprinkler System Permit fee record added: Fire Sprinkler System Permit ($300)

  • Fee updated

    West Bountiful, Utah — Fire Sprinkler System Permit fee record removed: Suppression Review (plan review + 2 inspections)

  • Permit type added

    Kimberly, Idaho — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Sedona, Arizona — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Unincorporated Box Elder County, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Montrose, Colorado — Electric Vehicle (EV) Charger Permit record added

  • Permit type added

    City of St. Johns, Arizona — Electric Vehicle (EV) Charging Station Permit record added

  • Permit type added

    Kersey, Colorado — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Roy, Utah — Fire Alarm System Permit record added

  • Permit type added

    Roy, Utah — Fire Sprinkler System Permit record added

  • Permit type added

    Cripple Creek, Colorado — Electric Vehicle Charging Station Permit record added

  • Permit type added

    Cut Bank, Montana — Electric Vehicle Charging Station Permit (State-Issued Electrical Permit) record added

  • Permit type added

    East Helena, Montana — EV Charger / EVSE Permit — State-Issued Electrical Permit (No Distinct Line Item) record added

  • Permit type added

    Rigby, Idaho — EV Charging Station Permit (State-Issued Electrical Permit) record added

  • Permit type added

    Vernal, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Unincorporated Bingham County, Idaho — EV Charger / EVSE Electrical Permit record added

  • Permit type added

    Calhan, Colorado — EV Charger / EVSE Permit record added

  • Permit type added

    Toole County (Unincorporated), Montana — Residential/Commercial Solar Photovoltaic (PV) Permit (State-Issued) record added

  • Permit type added

    Lewistown, Montana — EV Charger / Electric Vehicle Charging Station Permit record added

  • Permit type added

    Salmon, Idaho — EV Charger / EVSE Permit record added

  • Permit type added

    Jerome, Arizona — Electric Vehicle (EV) Charger / EVSE Permit record added

  • Permit type added

    Bernalillo, New Mexico — EV Charger / EVSE Installation Permit record added

  • Permit type added

    Richland County (Unincorporated Areas and Towns, excluding Sidney), Montana — Solar PV / Alternative Energy Permit (County Structural + State-Issued Electrical) record added

  • Permit type added

    Unincorporated Gila County, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Bullhead City, Arizona — EV Charger / EVSE Permit record added

  • Fee updated

    Colstrip, Montana — Electric Vehicle (EV) Charger / EVSE Permit fee record added: Single Family Interior/Exterior Wire or Rewire -- item H: 1 additional circuit or piece of equipment ($45)

  • Fee updated

    Washington City, Utah — Sign Permit fee record added: Sign Permit (Planning Review Fee) ($35.00)

  • Fee updated

    Washington City, Utah — Sign Permit fee record added: Conditional Use Permit - Signs ($100.00)

  • Fee updated

    Washington City, Utah — Sign Permit fee record added: Building Permit Fee Table (if the sign also requires a building permit) (Per the city's duly adopted Building Permit Fee Table (see the residential/commercial building permit entries in this file), plus a 45% plan review fee)

  • Fee updated

    Washington City, Utah — Sign Permit fee record removed: Sign Permit Fee

  • Permit type added

    Unincorporated Kane County, Utah — Sign Permit record added

  • Permit type added

    Unincorporated Salt Lake County, Utah — Sign Permit record added

  • Permit type added

    Malad City, Idaho — Solar PV Permit record added

  • Permit type added

    Melba, Idaho — EV Charger / EVSE Permit record added

  • Permit type added

    Missoula, Montana — Electric Vehicle (EV) Charger Permit record added

  • Permit type added

    Bloomfield, New Mexico — Solar PV Permit record added

  • Permit type added

    Eagle, Idaho — EV Charger / EVSE Permit (Electrical Permit) record added

  • Permit type added

    Wilder, Idaho — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Bow Mar, Colorado — Solar Photovoltaic (PV) Permit record added

  • Fee updated

    Yuma, Arizona — EV Charger / Electric Vehicle Charging Station Permit fee record added: Power Apparatus (kW/HP/kVA/kVAR-rated equipment — most specifically applicable Table 1-A bracket for the EVSE unit itself) (Up to and including 1 kW/HP/kVA: $5.00; over 1 to 10: $13.00; over 10 to 50: $25.00; over 50 to 100: $50.00; over 100: $67.00)

  • Permit type added

    Centerville, Utah — Sign Permit record added

  • Permit type added

    Coalville, Utah — Sign Permit record added

  • Fee updated

    Unincorporated Sanpete County, Utah — Solar PV Permit fee record added: Building Permit Fee (Valuation-based per ICC Building Valuation Data, run through the county's Building Permit Fee Calculator, with a 1.5x 'county factor' for unincorporated land)

  • Permit type added

    Rifle, Colorado — Solar PV Permit (Building Permit + State-Issued Electrical, Statewide Fee Cap) record added

  • Permit type added

    South Tucson, Arizona — Solar Photovoltaic (PV) Permit record added

  • Permit type added

    Sandy, Utah — Sign Permit record added

  • Permit type added

    Saratoga Springs, Utah — Sign Permit (Permanent Sign) record added

  • Permit type added

    Pinetop-Lakeside, Arizona — EV Charger / EVSE Permit record added

  • Permit type added

    Laramie, Wyoming — EV Charger / EVSE Permit record added

July 19, 2026

  • Permit type added

    Ephraim, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added

  • Permit type added

    Payson, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added

  • Permit type added

    Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added

  • Permit type added

    Tremonton, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added

  • Permit type added

    Unincorporated Grand County, Utah — Solar Permit record added

  • Permit type added

    Vernal, Utah — Solar Panel (PV) Permit record added

  • Permit type added

    Brigham City, Utah — Residential Solar / PV System (Distributed Generation Interconnection) record added

  • Fee updated

    Logan, Utah — Solar Panel Permit fee record added: Solar Permit (Commercial — Building Division only) ($200.00)

  • Fee updated

    Logan, Utah — Solar Panel Permit fee record updated: $200.00 → Based on Project Value

  • Fee schedule re-verified

    Midvale, Utah — fee schedule re-verified across 1 permit type

  • Permit type added

    Murray, Utah — EV Charger / EVSE Permit record added

  • Permit type added

    Unincorporated Carbon County, Utah — Solar Panel (PV) Permit record added

  • Permit type added

    North Logan, Utah — Photovoltaic (PV) System Permit record added

  • Permit type added

    Unincorporated Wasatch County, Utah — Solar PV Permit record added

  • Fee updated

    Alpine, Utah — Commercial Building Permit fee record updated: Same graduated table as residential: $1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation for commercial buildings is computed via Appendix A using the applicable ICC occupancy-group rate — e.g., Group B (Business), Type VB construction: $108.47/sq ft; Type IA: $161.16/sq ft (Appendix A, 'Square Foot Construction Costs,' 2008 ICC Building Valuation Data table). → Same graduated table as residential: $1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation for commercial buildings is computed via Appendix A using the applicable ICC occupancy-group rate — e.g., Group B (Business), Type VB construction: $109.47/sq ft; Type IA: $161.10/sq ft (Appendix A, 'Square Foot Construction Costs,' 2008 ICC Building Valuation Data table).

  • Fee updated

    Alpine, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: Same graduated table as new construction: $1–$500: $24, up to $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation is computed via Appendix A using the applicable commercial occupancy group (e.g., Group B Business: $108.47/sq ft, Type VB) — Appendix A's footnote (c) states 'Per shell only buildings deduct 20 percent,' which may be relevant if the tenant space was previously unfinished shell. → Same graduated table as new construction: $1–$500: $24, up to $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation is computed via Appendix A using the applicable commercial occupancy group (e.g., Group B Business: $109.47/sq ft, Type VB) — Appendix A's footnote (c) states 'Per shell only buildings deduct 20 percent,' which may be relevant if the tenant space was previously unfinished shell.

  • Fee updated

    Cedar City, Utah — Commercial Building Permit fee record updated: $636.00 per 1,000 sq ft → $2,516.00 per 1,000 sq ft

  • Fee updated

    Cedar City, Utah — Commercial Building Permit fee record updated: 1-inch meter $1,935.00; up to larger meter sizes priced proportionally per the schedule's meter-size table → 1-inch meter $3,892.00; up to larger meter sizes priced proportionally per the schedule's meter-size table

  • Fee updated

    Layton, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record added: Fire Sprinkler — Existing System Remodel (commercial tier) ($100 (0–3,000 sq ft); $150 (3,001–10,000 sq ft); $150 + $0.005/sq ft over 10,000 sq ft; $50 for minor relocation of 10 heads or fewer)

  • Fee updated

    Layton, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record removed: Fire Sprinkler — Existing System Remodel (relevant where the tenant space has existing sprinklers)

  • Fee updated

    Pleasant Grove, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: $250.00 → $250.00 per fee_schedule.php, but $75.00 per building.php — the city's own two pages disagree

  • Fee updated

    Roosevelt, Utah — Commercial Building Permit fee record updated: $5,000.00 (includes $3,500.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line → $3,000.00 (includes $3,000.00 hookup fee, or actual cost if greater); $200.00 inspection fee only if a contractor performs the connection to the City's main line

  • Fee updated

    Roosevelt, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: $5,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures → $3,000.00 water new-connection (City); $5,500.00 sewer connection, Commercial (City) -- see the commercial-building-permit entry above for full figures

  • Fee updated

    South Weber, Utah — Commercial Building Permit fee record removed: SWPPP Inspection (per year) — Commercial/Multi-Family Site

  • Fee updated

    South Weber, Utah — Commercial Building Permit fee record removed: SWPPP Violation Bond (refundable) — Commercial

  • Fee updated

    South Weber, Utah — Commercial Building Permit fee record removed: Site Plan Improvements Inspection (Commercial & Multi-Family)

  • Fee updated

    Unincorporated Wasatch County, Utah — Commercial Building Permit fee record removed: Plan Review Fee

  • New jurisdictions

    2 new Idaho jurisdictions: Rupert, City of St. Maries

  • Permit type added

    Unincorporated Garfield County, Utah — Solar Permit record added

  • New jurisdictions

    1 new Arizona jurisdictions: City of St. Johns

  • Permit type added

    North Salt Lake, Utah — Solar Panel (PV) Permit record added

  • Permit type added

    Payson, Utah — Solar Distributed Generation (Solar PV) Permit record added

  • Fee updated

    Town of Carbondale, Colorado — Residential Addition Building Permit fee record updated: Per the same valuation-based bracket table as new residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as new residential construction (see residential-building-permit)

  • Fee updated

    Town of Carbondale, Colorado — Residential Remodel Building Permit fee record updated: Per the same valuation-based bracket table as new residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as new residential construction (see residential-building-permit)

  • Fee updated

    Town of Carbondale, Colorado — New Commercial Building Permit fee record updated: Per the same valuation-based bracket table as residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as residential construction (see residential-building-permit)

  • Fee updated

    Town of Carbondale, Colorado — Commercial Remodel / Tenant Finish Permit fee record updated: Per the same valuation-based bracket table as residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as residential construction (see residential-building-permit)

  • Fee updated

    Town of Carbondale, Colorado — Commercial Addition Permit fee record updated: Per the same valuation-based bracket table as residential construction (see new-residential-building-permit) → Per the same valuation-based bracket table as residential construction (see residential-building-permit)

  • Permit type added

    Town of Carbondale, Colorado — New Single-Family Dwelling, Duplex, or Townhouse Building Permit record added

  • Permit type added

    Town of Carbondale, Colorado — Re-roof, Window, and Door Replacement Permit record added

  • Permit type removed

    Town of Carbondale, Colorado — New Single-Family Dwelling, Duplex, or Townhouse Building Permit record removed