Do I Need a Permit for a Commercial Tenant Improvement in Colorado?
Commercial tenant improvement permit requirements. When a TI needs a permit, the permit stack, stamped drawings, contractor licensing, and change-of-occupancy triggers.
Almost always yes — a commercial tenant improvement needs a building permit, usually with electrical, mechanical, and fire permits alongside it.
When a Tenant Improvement Needs a Permit
Nearly any commercial tenant improvement that moves a wall, changes the electrical or mechanical layout, or alters exits needs a building permit. Cosmetic work — paint, carpet, and like-for-like fixture swaps — usually does not. The line is structural and life-safety impact, not cost: relocating a single non-bearing partition can trigger a permit while a far more expensive finish package does not. Because a tenant improvement is commercial rather than residential, plan review is typically more involved and the accessibility and fire provisions apply in full.
The Permit Stack
A tenant improvement rarely means one permit. The building permit is the parent, and electrical, mechanical, and plumbing permits are usually pulled alongside it by the respective subcontractors. Fire sprinkler and fire alarm work commonly needs separate review, sometimes by a fire district rather than the building department. Expect each trade permit to carry its own inspections, and expect the certificate of occupancy or completion to depend on all of them passing — one open trade permit can hold up the whole space.
Stamped Drawings and Who Prepares Them
Most jurisdictions require plans prepared by a licensed architect or engineer for commercial work, with the threshold set by floor area, occupant load, or the nature of the change rather than by a single national rule. Structural modifications almost always need an engineer stamp. Energy compliance documentation for the mechanical and lighting scope is commonly required as well. Confirm the stamping threshold with the building department before you commission drawings, because redrawing a set to add a stamp is slower and more expensive than commissioning it stamped.
Contractor Licensing Is a State Question
Who may legally perform a tenant improvement is decided at the state level, and the rules differ more than most people expect. Some states license contractors centrally and separate commercial from residential qualification; some register contractors instead, tied to workers compensation rather than a trade exam; and some leave general contracting to city or county licensing while still licensing the electrical and mechanical trades at state level. The consequences of getting it wrong range from a failed inspection to a contractor losing the right to lien the property. Check the requirement for your state before signing, not after.
Assume a commercial tenant improvement needs a building permit plus trade permits, and budget for plan review. Confirm three things early: whether your drawings need an architect or engineer stamp, whether the work changes the building's occupancy classification, and how your state licenses or registers the contractor doing the work.
Permit fees by city in Colorado
Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.
97 rows
| Permit fee | Source | |
|---|---|---|
| Akron | Not a fixed figure — calculated based on construction cost (valuation-based), due at time of application submissionVerifiedvia Commercial Building Permit | Commercial Building Permit → |
| Alamosa | $24 minimum, scaling per the same valuation tiers as all building permits (e.g., a $150,000 tenant finish = $1,377)Verified | Commercial Tenant Improvement (Tenant Finish) → |
| Arvada | Variable — Table 18-1, based on job contract value or square footageVerified | Commercial Tenant Improvement / Tenant Finish Permit → |
| Aspen | Assessed once the application is deemed complete; payment starts the review clockVerified | Commercial Tenant Improvement / Tenant Finish Permit → |
| Aurora | $3.55 per square foot; $5,000 minimum feeVerified | Commercial Tenant Improvement Permit → |
| Avon | $50.00 minimum at $1.00-$500 valuation, scaling through the tiers to $6,170 for the first $1,000,000 plus $4.05 for each additional $1,000 or fraction thereof at $1,000,001+Verifiedvia Commercial Building Permit (New Structure / Remodel-Tenant Improvement) | Commercial Building Permit (New Structure / Remodel-Tenant Improvement) → |
| Basalt | $21.00Verifiedvia Commercial Building Permit (New Construction, Addition, Alteration / Tenant Finish) | Commercial Building Permit (New Construction, Addition, Alteration / Tenant Finish) → |
| Boulder | Per the City of Boulder Valuation Table – Scope: Tenant Finish = 50%, Core and Shell = 75%, New = 100%Verified | Commercial Tenant Improvement Permit → |
| Breckenridge | $50.00 minimum, scaling per the valuation tiers (e.g., $1,169.55 at $100,000 valuation plus $6.73/$1,000 above)Verified | Commercial Remodel / Tenant Finish Permit → |
| Broomfield | $23.50 minimum ($1-$500 valuation) scaling per the published bands; $2,000.01-$25,000: $69.25 for the first $2,000 plus $14.00 per additional $1,000; $25,000.01-$50,000: $391.75 plus $10.10/$1,000; $50,000.01-$100,000: $643.75 plus $7.00/$1,000; $100,000.01-$500,000: $993.75 plus $5.60/$1,000; over $500,000: $3,233.75 plus $4.75/$1,000Verified | Tenant Finish / Commercial Remodel Permit → |
| Calhan | Valuation-based per PPRBD Table A (Section RBC108.2, 2023 PPRBC): $50.00 minimum; e.g. $264.00 + $8.00 per $1,000 in the $25,001-$50,000 bracket; $464.00 + $5.00 per $1,000 for $50,001-$100,000; $714.00 + $4.00 per $1,000 for $100,001-$500,000Verified | Commercial Tenant Improvement / Remodel Permit (PPRBD-Administered as of July 1, 2026) → |
| Cañon City | 1.0% of valuation (City of Cañon City Permit Fee Multiplier)Verified | Commercial Tenant Improvement / Alteration Permit (Commercial Alteration) → |
| Castle Rock | Valuation-based, same table as all building permits: $23.50 minimum; $391.25 at $25,000; $643.75 at $50,000; $993.75 at $100,000 + $5.60 per additional $1,000 to $500,000; $3,233.75 at $500,000 + $4.75 per additional $1,000 to $1,000,000Verified | Commercial Tenant Improvement Permit → |
| Centennial | $23.50 minimum, e.g. $391.25 for the first $25,000 plus $10.10 per additional $1,000 to $50,000; $643.75 for the first $50,000 plus $7.00 per additional $1,000 to $100,000; $993.75 for the first $100,000 plus $5.60 per additional $1,000 to $500,000Verified | Commercial Tenant Improvement Permit → |
| Cheyenne Wells | $25.00Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) | Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) → |
| City of Fountain | $2,314.00 for the first $500,000 plus $3.50 for each additional $1,000Verifiedvia Commercial Building Permit | Commercial Building Permit → |
| Colorado Springs | Varies by valuation, using the ICC Building Valuation Data with a Commercial Regional Modifier of .97 of the construction type and occupancy valuationVerified | Commercial Tenant Improvement Permit → |
| Commerce City | $30.41 to $7,257.12+ depending on valuationVerified | Commercial Tenant Improvement Permit (Commercial Alteration / CALT) → |
| Conejos County (Unincorporated) | $24Verifiedvia Commercial Building Permit | Commercial Building Permit → |
| Cortez | $75.00 for valuation $1-$500, scaling through tiers to $5,976.25 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereofVerifiedvia Commercial Building Permit (New Construction, Remodel, Addition & Tenant Improvement) | Commercial Building Permit (New Construction, Remodel, Addition & Tenant Improvement) → |
| Craig | $100.00Verifiedvia Commercial Building Permit (New Structure) | Commercial Building Permit (New Structure) → |
| Crested Butte | $28.42Verifiedvia Commercial Building Permit (New Construction, Alteration & Tenant Improvement) | Commercial Building Permit (New Construction, Alteration & Tenant Improvement) → |
| Delta | $23.50 for valuation $1.00–$500.00; $23.50 + $3.05 per additional $100 (or fraction) up to $2,000; $69.25 + $14.00 per additional $1,000 up to $25,000; $391.25 + $10.10 per additional $1,000 for $25,000.01–$50,000; $643.75 + $7.00 per additional $1,000 for $50,000.01–$100,000; $993.75 + $5.60 per additional $1,000 for $100,000.01–$500,000; $3,233.75 + $4.75 per additional $1,000 for $500,000.01–$1,000,000; $5,608.75 + $3.15 per additional $1,000 above $1,000,000Verifiedvia Commercial Building Permit | Commercial Building Permit → |
| Denver | Per ADMIN 125/138 Table 1 valuation-based schedule (same table as residential)Verified | Commercial Tenant Improvement Permit → |
| Dillon | $50.00 minimum (valuation $1-$500), scaling through $1,169.55 for the first $100,000.00 plus $6.73 per additional $1,000.00 (to $500,000), $3,663.00 for the first $500,000.00 plus $5.34 per additional $1,000.00 (to $1,000,000), and $6,332.22 for the first $1,000,000.00 plus $3.90 per additional $1,000.00 above thatVerifiedvia Commercial Building Permit (including Tenant Improvement / Tenant Finish) | Commercial Building Permit (including Tenant Improvement / Tenant Finish) → |
| Durango | $24 minimum; $69 for the first $2,000 + $11/additional $1,000; $487 for the first $40,000 + $9/additional $1,000; $1,027 for the first $100,000 + $7/additional $1,000 (each rounded up to the next interval)Verified | Commercial Tenant Improvement / Tenant Finish Permit → |
| Eagle | $39.40Verifiedvia Commercial Building Permit (New Construction, Additions, Alterations & Tenant Finish) | Commercial Building Permit (New Construction, Additions, Alterations & Tenant Finish) → |
| Eaton | Per Appendix L, 2018 IRC valuation table (as referenced in the Town's current Fee Schedule)Verifiedvia Commercial Building Permit (New Building / Addition / Remodel-Tenant Improvement / Change of Occupancy) | Commercial Building Permit (New Building / Addition / Remodel-Tenant Improvement / Change of Occupancy) → |
| Englewood | $26.78Verifiedvia Commercial Building Permit | Commercial Building Permit → |
| Erie | $23.50 minimum, scaling per tier — e.g., $69.25 + $14.00/$1,000 from $2,001-$25,000; $993.75 + $5.60/$1,000 from $100,001-$500,000Verified | Commercial Tenant Improvement / Tenant Finish Permit → |
| Estes Park | Valuation-based per Table 1-A, Ordinance 03-16 — e.g. $391.25 at $25,000 valuation plus $10.10 per additional $1,000 to $50,000; $643.75 at $50,000 plus $7.00 per additional $1,000 to $100,000Verified | Commercial Tenant Finish / Remodel Permit → |
| Evans | $75.00Verified | Commercial Tenant Improvement (Tenant Finish) Permit → |
| Firestone | $80 (valuation $1-$2,000) scaling by tier, e.g. $1,075 for the first $100,000 plus $6.50 per additional $1,000 up to $500,000Verified | Commercial Tenant Finish (Tenant Improvement) Permit → |
| Fort Collins | Up to $2,000: flat $105.00. $2,000–$25,000: $105 + $15.50 per additional $1,000. $25,000–$50,000: $461.50 + $10.50/$1,000. $50,000–$100,000: $724.00 + $6.50/$1,000. $100,000–$500,000: $1,049.00 + $6/$1,000 (via $60 per $10,000). Above $500,000: $3,449.00 + $5.50/$1,000 (via $55 per $10,000).Verified | Commercial Tenant Improvement / Remodel Permit → |
| Fort Morgan | $27.00Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels / Tenant Improvements) | Commercial Building Permit (New Construction, Additions, Remodels / Tenant Improvements) → |
| Frisco | $65.00Verifiedvia Commercial Building Permit | Commercial Building Permit → |
| Fruita | $35.00 up to $500 valuation; $68.00 for the first $2,000 plus $9.90 per additional $1,000 to $25,000; $295.70 for the first $25,000 plus $7.20 per additional $1,000 to $50,000; $475.70 for the first $50,000 plus $5.00 per additional $1,000 to $100,000; $725.70 for the first $100,000 plus $3.90 per additional $1,000 to $500,000; $2,285.70 for the first $500,000 plus $3.30 per additional $1,000 to $1,000,000; $3,935.70 for the first $1,000,000 plus $2.20 per additional $1,000Verifiedvia Commercial Building Permit | Commercial Building Permit → |
| Garden City | See city page for the current Commercial Building Permit (New Construction / Alterations / Tenant Build-Outs) fee | Commercial Building Permit (New Construction / Alterations / Tenant Build-Outs) → |
| Gilcrest | See city page for the current Commercial Building Permit (New Construction, Additions & Tenant Improvements) fee | Commercial Building Permit (New Construction, Additions & Tenant Improvements) → |
| Glenwood Springs | Same Table 1-A schedule as all building permits: $23.50 minimum, e.g. $993.75 for the first $100,000 plus $5.60 for each additional $1,000 up to $500,000; $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 to $1,000,000; $5,608.75 for the first $1,000,000 plus $3.15 per additional $1,000 above thatVerifiedvia Commercial Building Permit (Including Tenant Improvement / Commercial Remodel) | Commercial Building Permit (Including Tenant Improvement / Commercial Remodel) → |
| Golden | $25.85 minimum, scaling per valuation tiers (e.g., $430.38 for the first $25,000.00 plus $11.11 for each additional $1,000.00 up to $50,000.00; $708.13 for the first $50,000.00 plus $7.70 per additional $1,000.00 up to $100,000.00)Verified | Commercial Tenant Improvement (Interior Commercial Alteration) Permit → |
| Grand Junction | Per Table 2 on actual labor + material cost: $50.00 up to $1,200; $68.00 for the first $2,000 plus $9.90/additional $1,000 to $25,000; $295.70 for the first $25,000 plus $7.20/additional $1,000 to $50,000; $475.70 for the first $50,000 plus $5.00/additional $1,000 to $100,000; $725.70 for the first $100,000 plus $3.90/additional $1,000 to $500,000Verified | Commercial Tenant Improvement / Alteration Permit → |
| Greeley | $23.50Verifiedvia Commercial Building Permit (New Construction) | Commercial Building Permit (New Construction) → |
| Gunnison | $1.00-$500.00: $24.00. $501.00-$2,000.00: $24.00 for the first $500 plus $3.00 for each additional $1,000 or fraction thereof. $2,001.00-$40,000.00: $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof. $40,001.00-$100,000.00: $487.00 for the first $40,000 plus $9.00 for each additional $1,000 or fraction thereof. $100,001.00-$500,000.00: $1,027.00 for the first $100,000 plus $7.00 for each additional $1,000 or fraction thereof. $500,001.00-$1,000,000.00: $3,827.00 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof. $1,000,001.00-$5,000,000.00: $6,327.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof. $5,000,001.00 and over: $18,327.00 for the first $5,000,000 plus $1.00 for each additional $1,000 or fraction thereof.Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement) | Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement) → |
| Gypsum | See city page for the current Commercial Building Permit fee | Commercial Building Permit → |
| Haxtun | $10.00Verifiedvia Commercial Building Permit | Commercial Building Permit → |
| Holyoke | See city page for the current Commercial Building Permit fee | Commercial Building Permit → |
| Johnstown | $69.25 for the first $2,000 plus $14.00 per $1,000 of valueVerified | Commercial Tenant Improvement Permit (Tenant Finish / Commercial Alterations) → |
| Julesburg | Not published; determined by Town Hall at time of application per a fee schedule adopted by Town Board resolution (not publicly posted online)Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) | Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements) → |
| Kersey | Set by SAFEbuilt per the Uniform Building Code valuation-based fee schedule applied to the TI's declared valuation — no TI-specific fee line exists in either Town fee documentVerified | Commercial Tenant Finish / Remodel (Tenant Improvement) Permit → |
| La Junta | See city page for the current Commercial Building Permit fee | Commercial Building Permit → |
| La Salle | See city page for the current Commercial Remodel / Tenant Finish Permit fee | Commercial Remodel / Tenant Finish Permit → |
| Lafayette | $30.00 minimum, scaling per the valuation tiers (e.g., $2,001-$25,000: $80.25 + $15.40/$1,000; $25,001-$50,000: $434.45 + $11.11/$1,000; $100,001-$500,000: $1,097.20 + $6.16/$1,000)Verified | Commercial Tenant Finish (Tenant Improvement) Permit → |
| Lakewood | Varies by valuation — see Residential Building Permit fee tiers ($26.00 minimum up to $5,570.15 + $3.45/$1,000 over $1,000,000)Verified | Commercial Tenant Improvement Permit → |
| Littleton | $25.85 minimum; sliding scale by total valuationVerified | Commercial Tenant Improvement (Tenant Finish) Permit → |
| Lochbuie | $33.80 minimum, scaling by valuation — e.g., $448.11 for the first $25,000 plus $11.49/$1,000 to $50,000; $735.36 for the first $50,000 plus $7.88/$1,000 to $100,000; $1,129.36 for the first $100,000 plus $6.30/$1,000 to $500,000Verified | Commercial Tenant Improvement (Tenant Finish) Permit → |
| Longmont | Per the Primary Fee Schedule — $27.00 minimum, scaling to $6,448.55 + $4.20/$1,000 over $1,000,000Verified | Commercial Tenant Improvement Permit → |
| Louisville | $28.00 minimum, scaling per the standard valuation tiers (Table 4, CC 12/03/24)Verified | Commercial Tenant Improvement / Tenant Finish Permit → |
| Loveland | Based on the current ICC Building Valuation Data (square-foot construction cost by occupancy group/construction type) applied to project square footage; e.g., effective March 15, 2026, B (Business) Type VB is $213.27/sq ft and M (Mercantile) Type VB is $135.89/sq ft; for shell-only buildings, deduct 20 percent from the applicable valuation per the table's footnoteVerifiedvia Commercial Building Permit (New Construction / Addition) | Commercial Building Permit (New Construction / Addition) → |
| Mead | $44.56Verifiedvia Commercial Building Permit (New Construction / Tenant Improvement) | Commercial Building Permit (New Construction / Tenant Improvement) → |
| Milliken | Valuation-based per the Town's 1997 UBC fee scheduleVerified | Commercial Tenant Improvement / Tenant Finish Permit → |
| Montrose | See city page for the current Commercial Building Permit fee | Commercial Building Permit → |
| Mount Crested Butte | See city page for the current Commercial Building Permit (New Construction, Addition & Tenant Improvement/Alteration) fee | Commercial Building Permit (New Construction, Addition & Tenant Improvement/Alteration) → |
| Mountain View | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 per additional $1,000.00 (or fraction) from $500,001.00-$1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 (or fraction) above $1,000,000.00Verifiedvia Commercial Building Permit (New Construction / Shell / Remodel / Addition) | Commercial Building Permit (New Construction / Shell / Remodel / Addition) → |
| Mountain Village | WaivedVerifiedvia Commercial New Building Permit | Commercial New Building Permit → |
| Northglenn | $23.50 minimum, scaling per the valuation tiersVerified | Commercial Tenant Improvement / Tenant Finish Permit → |
| Nunn | See city page for the current Commercial Building Permit (New Construction, Additions, Remodels & Tenant Finish) fee | Commercial Building Permit (New Construction, Additions, Remodels & Tenant Finish) → |
| Palisade | See city page for the current Commercial Tenant Improvement / Alteration Permit — Town Planning Clearance + Mesa County Building Permit fee | Commercial Tenant Improvement / Alteration Permit — Town Planning Clearance + Mesa County Building Permit → |
| Parker | $23.50Verified | Commercial Tenant Finish / Remodel / Change of Occupancy Permit (Tenant Improvement) → |
| Platteville | Follows the fee schedule embedded in the adopted 2024 International Building Code, incorporated by reference; no separate Town-published valuation table exists, and a commercial permit is not subject to the $50.00 zoning-compliance surcharge that applies to residential applicationsVerifiedvia Commercial Building Permit (New Construction, Shell, Tenant Finish, Remodel/Addition) | Commercial Building Permit (New Construction, Shell, Tenant Finish, Remodel/Addition) → |
| Poncha Springs | See city page for the current Commercial Building Permit (New Construction, Alteration, Change of Occupancy/Use) fee | Commercial Building Permit (New Construction, Alteration, Change of Occupancy/Use) → |
| Pueblo | Project area (sq ft) x ICC Building Valuation Data per-sq-ft figure (occupancy/construction-type specific, published by ICC, not fixed by SoCoBD) x 1.00Verifiedvia Commercial Building Permit (New Construction / Addition) | Commercial Building Permit (New Construction / Addition) → |
| Rifle | See city page for the current Commercial Building Permit (New Construction) fee | Commercial Building Permit (New Construction) → |
| Saguache | See city page for the current Commercial Building Permit fee | Commercial Building Permit → |
| Salida | See city page for the current Commercial / Mixed-Use / Multi-Family Building Permit (New Construction, Addition, Alteration, Tenant Improvement) fee | Commercial / Mixed-Use / Multi-Family Building Permit (New Construction, Addition, Alteration, Tenant Improvement) → |
| Sedgwick | $30.00Verifiedvia Building Permit (Commercial New Construction, Retail, Office, Manufacturing) | Building Permit (Commercial New Construction, Retail, Office, Manufacturing) → |
| Silverthorne | See city page for the current New Commercial Construction / Commercial Addition / New Mixed-Use (Residential and Commercial) Building Permit fee | New Commercial Construction / Commercial Addition / New Mixed-Use (Residential and Commercial) Building Permit → |
| Springfield | $50.00 flatVerifiedvia Building Permit (Commercial New Construction, Additions, Remodels, Tenant Improvements, Repairs) | Building Permit (Commercial New Construction, Additions, Remodels, Tenant Improvements, Repairs) → |
| Steamboat Springs | $21.15 minimum, scaling per the same valuation tiers used for residential in the RCRBD Permit Fee Schedule-PoliciesVerifiedvia Commercial Building Permit (New Construction, Additions & Alterations) | Commercial Building Permit (New Construction, Additions & Alterations) → |
| Sterling | See city page for the current Commercial Building Permit (New Construction / Major Alteration) fee | Commercial Building Permit (New Construction / Major Alteration) → |
| Superior | $28.50Verifiedvia Commercial Building Permit (New Construction / Additions / Alterations) | Commercial Building Permit (New Construction / Additions / Alterations) → |
| Telluride | See city page for the current Commercial Building Permit (New Construction / Addition) fee | Commercial Building Permit (New Construction / Addition) → |
| Thornton | Varies by valuation — $30.00 minimum up to $5,615.25 + $3.75/$1,000 over $1,000,000Verified | Commercial Tenant Improvement Permit → |
| Timnath | See city page for the current Commercial Tenant Improvement / Tenant Finish Permit fee | Commercial Tenant Improvement / Tenant Finish Permit → |
| Trinidad | See city page for the current Commercial Building Permit (New Construction) fee | Commercial Building Permit (New Construction) → |
| Unincorporated Pueblo County | See city page for the current Commercial Building Permit (includes Tenant Improvements) fee | Commercial Building Permit (includes Tenant Improvements) → |
| Unincorporated Teller County | See city page for the current Commercial Building Permit fee | Commercial Building Permit → |
| Unincorporated Washington County | $150.00 flatVerifiedvia Commercial Building Permit (Use by Special Review) | Commercial Building Permit (Use by Special Review) → |
| Vail | See city page for the current Commercial Remodel / Tenant Improvement / Addition Permit fee | Commercial Remodel / Tenant Improvement / Addition Permit → |
| Victor | See city page for the current Commercial Building Permit (New Construction & Addition) fee | Commercial Building Permit (New Construction & Addition) → |
| Walsh | $15.00Verifiedvia Building Permit (Commercial Construction and Tenant Improvements) | Building Permit (Commercial Construction and Tenant Improvements) → |
| Wellington | $25 flatVerified | Commercial Tenant Finish / Remodel (Tenant Improvement) Permit → |
| Westminster | Per the City of Westminster Building Division Fee Schedule valuation tiersVerified | Commercial Tenant Improvement Permit → |
| Wheat Ridge | 80% of the appropriate occupancy's ICC Building Valuation Data (BVD) figureVerifiedvia Commercial Building Permit (New Construction / Shell) | Commercial Building Permit (New Construction / Shell) → |
| Windsor | See city page for the current Commercial Tenant Finish / Remodel (Tenant Improvement) Permit fee | Commercial Tenant Finish / Remodel (Tenant Improvement) Permit → |
| Winter Park | See city page for the current Commercial Building Permit fee | Commercial Building Permit → |
| Yuma | $100.00Verifiedvia Building Permit (Commercial New Construction, Addition, Alteration, Tenant Improvement) | Building Permit (Commercial New Construction, Addition, Alteration, Tenant Improvement) → |