Commercial tenant improvement permit requirements. When a TI needs a permit, the permit stack, stamped drawings, contractor licensing, and change-of-occupancy triggers.

Almost always yes — a commercial tenant improvement needs a building permit, usually with electrical, mechanical, and fire permits alongside it.

When a Tenant Improvement Needs a Permit

Nearly any commercial tenant improvement that moves a wall, changes the electrical or mechanical layout, or alters exits needs a building permit. Cosmetic work — paint, carpet, and like-for-like fixture swaps — usually does not. The line is structural and life-safety impact, not cost: relocating a single non-bearing partition can trigger a permit while a far more expensive finish package does not. Because a tenant improvement is commercial rather than residential, plan review is typically more involved and the accessibility and fire provisions apply in full.

The Permit Stack

A tenant improvement rarely means one permit. The building permit is the parent, and electrical, mechanical, and plumbing permits are usually pulled alongside it by the respective subcontractors. Fire sprinkler and fire alarm work commonly needs separate review, sometimes by a fire district rather than the building department. Expect each trade permit to carry its own inspections, and expect the certificate of occupancy or completion to depend on all of them passing — one open trade permit can hold up the whole space.

Stamped Drawings and Who Prepares Them

Most jurisdictions require plans prepared by a licensed architect or engineer for commercial work, with the threshold set by floor area, occupant load, or the nature of the change rather than by a single national rule. Structural modifications almost always need an engineer stamp. Energy compliance documentation for the mechanical and lighting scope is commonly required as well. Confirm the stamping threshold with the building department before you commission drawings, because redrawing a set to add a stamp is slower and more expensive than commissioning it stamped.

Contractor Licensing Is a State Question

Who may legally perform a tenant improvement is decided at the state level, and the rules differ more than most people expect. Some states license contractors centrally and separate commercial from residential qualification; some register contractors instead, tied to workers compensation rather than a trade exam; and some leave general contracting to city or county licensing while still licensing the electrical and mechanical trades at state level. The consequences of getting it wrong range from a failed inspection to a contractor losing the right to lien the property. Check the requirement for your state before signing, not after.

Assume a commercial tenant improvement needs a building permit plus trade permits, and budget for plan review. Confirm three things early: whether your drawings need an architect or engineer stamp, whether the work changes the building's occupancy classification, and how your state licenses or registers the contractor doing the work.

Permit fees by city in Colorado

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

97 rows

Permit fees by city in Colorado
Permit feeSource
AkronNot a fixed figure — calculated based on construction cost (valuation-based), due at time of application submissionVerifiedvia Commercial Building PermitCommercial Building Permit
Alamosa$24 minimum, scaling per the same valuation tiers as all building permits (e.g., a $150,000 tenant finish = $1,377)VerifiedCommercial Tenant Improvement (Tenant Finish)
ArvadaVariable — Table 18-1, based on job contract value or square footageVerifiedCommercial Tenant Improvement / Tenant Finish Permit
AspenAssessed once the application is deemed complete; payment starts the review clockVerifiedCommercial Tenant Improvement / Tenant Finish Permit
Aurora$3.55 per square foot; $5,000 minimum feeVerifiedCommercial Tenant Improvement Permit
Avon$50.00 minimum at $1.00-$500 valuation, scaling through the tiers to $6,170 for the first $1,000,000 plus $4.05 for each additional $1,000 or fraction thereof at $1,000,001+Verifiedvia Commercial Building Permit (New Structure / Remodel-Tenant Improvement)Commercial Building Permit (New Structure / Remodel-Tenant Improvement)
Basalt$21.00Verifiedvia Commercial Building Permit (New Construction, Addition, Alteration / Tenant Finish)Commercial Building Permit (New Construction, Addition, Alteration / Tenant Finish)
BoulderPer the City of Boulder Valuation Table – Scope: Tenant Finish = 50%, Core and Shell = 75%, New = 100%VerifiedCommercial Tenant Improvement Permit
Breckenridge$50.00 minimum, scaling per the valuation tiers (e.g., $1,169.55 at $100,000 valuation plus $6.73/$1,000 above)VerifiedCommercial Remodel / Tenant Finish Permit
Broomfield$23.50 minimum ($1-$500 valuation) scaling per the published bands; $2,000.01-$25,000: $69.25 for the first $2,000 plus $14.00 per additional $1,000; $25,000.01-$50,000: $391.75 plus $10.10/$1,000; $50,000.01-$100,000: $643.75 plus $7.00/$1,000; $100,000.01-$500,000: $993.75 plus $5.60/$1,000; over $500,000: $3,233.75 plus $4.75/$1,000VerifiedTenant Finish / Commercial Remodel Permit
CalhanValuation-based per PPRBD Table A (Section RBC108.2, 2023 PPRBC): $50.00 minimum; e.g. $264.00 + $8.00 per $1,000 in the $25,001-$50,000 bracket; $464.00 + $5.00 per $1,000 for $50,001-$100,000; $714.00 + $4.00 per $1,000 for $100,001-$500,000VerifiedCommercial Tenant Improvement / Remodel Permit (PPRBD-Administered as of July 1, 2026)
Cañon City1.0% of valuation (City of Cañon City Permit Fee Multiplier)VerifiedCommercial Tenant Improvement / Alteration Permit (Commercial Alteration)
Castle RockValuation-based, same table as all building permits: $23.50 minimum; $391.25 at $25,000; $643.75 at $50,000; $993.75 at $100,000 + $5.60 per additional $1,000 to $500,000; $3,233.75 at $500,000 + $4.75 per additional $1,000 to $1,000,000VerifiedCommercial Tenant Improvement Permit
Centennial$23.50 minimum, e.g. $391.25 for the first $25,000 plus $10.10 per additional $1,000 to $50,000; $643.75 for the first $50,000 plus $7.00 per additional $1,000 to $100,000; $993.75 for the first $100,000 plus $5.60 per additional $1,000 to $500,000VerifiedCommercial Tenant Improvement Permit
Cheyenne Wells$25.00Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements)Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements)
City of Fountain$2,314.00 for the first $500,000 plus $3.50 for each additional $1,000Verifiedvia Commercial Building PermitCommercial Building Permit
Colorado SpringsVaries by valuation, using the ICC Building Valuation Data with a Commercial Regional Modifier of .97 of the construction type and occupancy valuationVerifiedCommercial Tenant Improvement Permit
Commerce City$30.41 to $7,257.12+ depending on valuationVerifiedCommercial Tenant Improvement Permit (Commercial Alteration / CALT)
Conejos County (Unincorporated)$24Verifiedvia Commercial Building PermitCommercial Building Permit
Cortez$75.00 for valuation $1-$500, scaling through tiers to $5,976.25 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereofVerifiedvia Commercial Building Permit (New Construction, Remodel, Addition & Tenant Improvement)Commercial Building Permit (New Construction, Remodel, Addition & Tenant Improvement)
Craig$100.00Verifiedvia Commercial Building Permit (New Structure)Commercial Building Permit (New Structure)
Crested Butte$28.42Verifiedvia Commercial Building Permit (New Construction, Alteration & Tenant Improvement)Commercial Building Permit (New Construction, Alteration & Tenant Improvement)
Delta$23.50 for valuation $1.00–$500.00; $23.50 + $3.05 per additional $100 (or fraction) up to $2,000; $69.25 + $14.00 per additional $1,000 up to $25,000; $391.25 + $10.10 per additional $1,000 for $25,000.01–$50,000; $643.75 + $7.00 per additional $1,000 for $50,000.01–$100,000; $993.75 + $5.60 per additional $1,000 for $100,000.01–$500,000; $3,233.75 + $4.75 per additional $1,000 for $500,000.01–$1,000,000; $5,608.75 + $3.15 per additional $1,000 above $1,000,000Verifiedvia Commercial Building PermitCommercial Building Permit
DenverPer ADMIN 125/138 Table 1 valuation-based schedule (same table as residential)VerifiedCommercial Tenant Improvement Permit
Dillon$50.00 minimum (valuation $1-$500), scaling through $1,169.55 for the first $100,000.00 plus $6.73 per additional $1,000.00 (to $500,000), $3,663.00 for the first $500,000.00 plus $5.34 per additional $1,000.00 (to $1,000,000), and $6,332.22 for the first $1,000,000.00 plus $3.90 per additional $1,000.00 above thatVerifiedvia Commercial Building Permit (including Tenant Improvement / Tenant Finish)Commercial Building Permit (including Tenant Improvement / Tenant Finish)
Durango$24 minimum; $69 for the first $2,000 + $11/additional $1,000; $487 for the first $40,000 + $9/additional $1,000; $1,027 for the first $100,000 + $7/additional $1,000 (each rounded up to the next interval)VerifiedCommercial Tenant Improvement / Tenant Finish Permit
Eagle$39.40Verifiedvia Commercial Building Permit (New Construction, Additions, Alterations & Tenant Finish)Commercial Building Permit (New Construction, Additions, Alterations & Tenant Finish)
EatonPer Appendix L, 2018 IRC valuation table (as referenced in the Town's current Fee Schedule)Verifiedvia Commercial Building Permit (New Building / Addition / Remodel-Tenant Improvement / Change of Occupancy)Commercial Building Permit (New Building / Addition / Remodel-Tenant Improvement / Change of Occupancy)
Englewood$26.78Verifiedvia Commercial Building PermitCommercial Building Permit
Erie$23.50 minimum, scaling per tier — e.g., $69.25 + $14.00/$1,000 from $2,001-$25,000; $993.75 + $5.60/$1,000 from $100,001-$500,000VerifiedCommercial Tenant Improvement / Tenant Finish Permit
Estes ParkValuation-based per Table 1-A, Ordinance 03-16 — e.g. $391.25 at $25,000 valuation plus $10.10 per additional $1,000 to $50,000; $643.75 at $50,000 plus $7.00 per additional $1,000 to $100,000VerifiedCommercial Tenant Finish / Remodel Permit
Evans$75.00VerifiedCommercial Tenant Improvement (Tenant Finish) Permit
Firestone$80 (valuation $1-$2,000) scaling by tier, e.g. $1,075 for the first $100,000 plus $6.50 per additional $1,000 up to $500,000VerifiedCommercial Tenant Finish (Tenant Improvement) Permit
Fort CollinsUp to $2,000: flat $105.00. $2,000–$25,000: $105 + $15.50 per additional $1,000. $25,000–$50,000: $461.50 + $10.50/$1,000. $50,000–$100,000: $724.00 + $6.50/$1,000. $100,000–$500,000: $1,049.00 + $6/$1,000 (via $60 per $10,000). Above $500,000: $3,449.00 + $5.50/$1,000 (via $55 per $10,000).VerifiedCommercial Tenant Improvement / Remodel Permit
Fort Morgan$27.00Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels / Tenant Improvements)Commercial Building Permit (New Construction, Additions, Remodels / Tenant Improvements)
Frisco$65.00Verifiedvia Commercial Building PermitCommercial Building Permit
Fruita$35.00 up to $500 valuation; $68.00 for the first $2,000 plus $9.90 per additional $1,000 to $25,000; $295.70 for the first $25,000 plus $7.20 per additional $1,000 to $50,000; $475.70 for the first $50,000 plus $5.00 per additional $1,000 to $100,000; $725.70 for the first $100,000 plus $3.90 per additional $1,000 to $500,000; $2,285.70 for the first $500,000 plus $3.30 per additional $1,000 to $1,000,000; $3,935.70 for the first $1,000,000 plus $2.20 per additional $1,000Verifiedvia Commercial Building PermitCommercial Building Permit
Garden CitySee city page for the current Commercial Building Permit (New Construction / Alterations / Tenant Build-Outs) feeCommercial Building Permit (New Construction / Alterations / Tenant Build-Outs)
GilcrestSee city page for the current Commercial Building Permit (New Construction, Additions & Tenant Improvements) feeCommercial Building Permit (New Construction, Additions & Tenant Improvements)
Glenwood SpringsSame Table 1-A schedule as all building permits: $23.50 minimum, e.g. $993.75 for the first $100,000 plus $5.60 for each additional $1,000 up to $500,000; $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 to $1,000,000; $5,608.75 for the first $1,000,000 plus $3.15 per additional $1,000 above thatVerifiedvia Commercial Building Permit (Including Tenant Improvement / Commercial Remodel)Commercial Building Permit (Including Tenant Improvement / Commercial Remodel)
Golden$25.85 minimum, scaling per valuation tiers (e.g., $430.38 for the first $25,000.00 plus $11.11 for each additional $1,000.00 up to $50,000.00; $708.13 for the first $50,000.00 plus $7.70 per additional $1,000.00 up to $100,000.00)VerifiedCommercial Tenant Improvement (Interior Commercial Alteration) Permit
Grand JunctionPer Table 2 on actual labor + material cost: $50.00 up to $1,200; $68.00 for the first $2,000 plus $9.90/additional $1,000 to $25,000; $295.70 for the first $25,000 plus $7.20/additional $1,000 to $50,000; $475.70 for the first $50,000 plus $5.00/additional $1,000 to $100,000; $725.70 for the first $100,000 plus $3.90/additional $1,000 to $500,000VerifiedCommercial Tenant Improvement / Alteration Permit
Greeley$23.50Verifiedvia Commercial Building Permit (New Construction)Commercial Building Permit (New Construction)
Gunnison$1.00-$500.00: $24.00. $501.00-$2,000.00: $24.00 for the first $500 plus $3.00 for each additional $1,000 or fraction thereof. $2,001.00-$40,000.00: $69.00 for the first $2,000 plus $11.00 for each additional $1,000 or fraction thereof. $40,001.00-$100,000.00: $487.00 for the first $40,000 plus $9.00 for each additional $1,000 or fraction thereof. $100,001.00-$500,000.00: $1,027.00 for the first $100,000 plus $7.00 for each additional $1,000 or fraction thereof. $500,001.00-$1,000,000.00: $3,827.00 for the first $500,000 plus $5.00 for each additional $1,000 or fraction thereof. $1,000,001.00-$5,000,000.00: $6,327.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof. $5,000,001.00 and over: $18,327.00 for the first $5,000,000 plus $1.00 for each additional $1,000 or fraction thereof.Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement)Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvement)
GypsumSee city page for the current Commercial Building Permit feeCommercial Building Permit
Haxtun$10.00Verifiedvia Commercial Building PermitCommercial Building Permit
HolyokeSee city page for the current Commercial Building Permit feeCommercial Building Permit
Johnstown$69.25 for the first $2,000 plus $14.00 per $1,000 of valueVerifiedCommercial Tenant Improvement Permit (Tenant Finish / Commercial Alterations)
JulesburgNot published; determined by Town Hall at time of application per a fee schedule adopted by Town Board resolution (not publicly posted online)Verifiedvia Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements)Commercial Building Permit (New Construction, Additions, Remodels, Tenant Improvements)
KerseySet by SAFEbuilt per the Uniform Building Code valuation-based fee schedule applied to the TI's declared valuation — no TI-specific fee line exists in either Town fee documentVerifiedCommercial Tenant Finish / Remodel (Tenant Improvement) Permit
La JuntaSee city page for the current Commercial Building Permit feeCommercial Building Permit
La SalleSee city page for the current Commercial Remodel / Tenant Finish Permit feeCommercial Remodel / Tenant Finish Permit
Lafayette$30.00 minimum, scaling per the valuation tiers (e.g., $2,001-$25,000: $80.25 + $15.40/$1,000; $25,001-$50,000: $434.45 + $11.11/$1,000; $100,001-$500,000: $1,097.20 + $6.16/$1,000)VerifiedCommercial Tenant Finish (Tenant Improvement) Permit
LakewoodVaries by valuation — see Residential Building Permit fee tiers ($26.00 minimum up to $5,570.15 + $3.45/$1,000 over $1,000,000)VerifiedCommercial Tenant Improvement Permit
Littleton$25.85 minimum; sliding scale by total valuationVerifiedCommercial Tenant Improvement (Tenant Finish) Permit
Lochbuie$33.80 minimum, scaling by valuation — e.g., $448.11 for the first $25,000 plus $11.49/$1,000 to $50,000; $735.36 for the first $50,000 plus $7.88/$1,000 to $100,000; $1,129.36 for the first $100,000 plus $6.30/$1,000 to $500,000VerifiedCommercial Tenant Improvement (Tenant Finish) Permit
LongmontPer the Primary Fee Schedule — $27.00 minimum, scaling to $6,448.55 + $4.20/$1,000 over $1,000,000VerifiedCommercial Tenant Improvement Permit
Louisville$28.00 minimum, scaling per the standard valuation tiers (Table 4, CC 12/03/24)VerifiedCommercial Tenant Improvement / Tenant Finish Permit
LovelandBased on the current ICC Building Valuation Data (square-foot construction cost by occupancy group/construction type) applied to project square footage; e.g., effective March 15, 2026, B (Business) Type VB is $213.27/sq ft and M (Mercantile) Type VB is $135.89/sq ft; for shell-only buildings, deduct 20 percent from the applicable valuation per the table's footnoteVerifiedvia Commercial Building Permit (New Construction / Addition)Commercial Building Permit (New Construction / Addition)
Mead$44.56Verifiedvia Commercial Building Permit (New Construction / Tenant Improvement)Commercial Building Permit (New Construction / Tenant Improvement)
MillikenValuation-based per the Town's 1997 UBC fee scheduleVerifiedCommercial Tenant Improvement / Tenant Finish Permit
MontroseSee city page for the current Commercial Building Permit feeCommercial Building Permit
Mount Crested ButteSee city page for the current Commercial Building Permit (New Construction, Addition & Tenant Improvement/Alteration) feeCommercial Building Permit (New Construction, Addition & Tenant Improvement/Alteration)
Mountain View$40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 per additional $1,000.00 (or fraction) from $500,001.00-$1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 (or fraction) above $1,000,000.00Verifiedvia Commercial Building Permit (New Construction / Shell / Remodel / Addition)Commercial Building Permit (New Construction / Shell / Remodel / Addition)
Mountain VillageWaivedVerifiedvia Commercial New Building PermitCommercial New Building Permit
Northglenn$23.50 minimum, scaling per the valuation tiersVerifiedCommercial Tenant Improvement / Tenant Finish Permit
NunnSee city page for the current Commercial Building Permit (New Construction, Additions, Remodels & Tenant Finish) feeCommercial Building Permit (New Construction, Additions, Remodels & Tenant Finish)
PalisadeSee city page for the current Commercial Tenant Improvement / Alteration Permit — Town Planning Clearance + Mesa County Building Permit feeCommercial Tenant Improvement / Alteration Permit — Town Planning Clearance + Mesa County Building Permit
Parker$23.50VerifiedCommercial Tenant Finish / Remodel / Change of Occupancy Permit (Tenant Improvement)
PlattevilleFollows the fee schedule embedded in the adopted 2024 International Building Code, incorporated by reference; no separate Town-published valuation table exists, and a commercial permit is not subject to the $50.00 zoning-compliance surcharge that applies to residential applicationsVerifiedvia Commercial Building Permit (New Construction, Shell, Tenant Finish, Remodel/Addition)Commercial Building Permit (New Construction, Shell, Tenant Finish, Remodel/Addition)
Poncha SpringsSee city page for the current Commercial Building Permit (New Construction, Alteration, Change of Occupancy/Use) feeCommercial Building Permit (New Construction, Alteration, Change of Occupancy/Use)
PuebloProject area (sq ft) x ICC Building Valuation Data per-sq-ft figure (occupancy/construction-type specific, published by ICC, not fixed by SoCoBD) x 1.00Verifiedvia Commercial Building Permit (New Construction / Addition)Commercial Building Permit (New Construction / Addition)
RifleSee city page for the current Commercial Building Permit (New Construction) feeCommercial Building Permit (New Construction)
SaguacheSee city page for the current Commercial Building Permit feeCommercial Building Permit
SalidaSee city page for the current Commercial / Mixed-Use / Multi-Family Building Permit (New Construction, Addition, Alteration, Tenant Improvement) feeCommercial / Mixed-Use / Multi-Family Building Permit (New Construction, Addition, Alteration, Tenant Improvement)
Sedgwick$30.00Verifiedvia Building Permit (Commercial New Construction, Retail, Office, Manufacturing)Building Permit (Commercial New Construction, Retail, Office, Manufacturing)
SilverthorneSee city page for the current New Commercial Construction / Commercial Addition / New Mixed-Use (Residential and Commercial) Building Permit feeNew Commercial Construction / Commercial Addition / New Mixed-Use (Residential and Commercial) Building Permit
Springfield$50.00 flatVerifiedvia Building Permit (Commercial New Construction, Additions, Remodels, Tenant Improvements, Repairs)Building Permit (Commercial New Construction, Additions, Remodels, Tenant Improvements, Repairs)
Steamboat Springs$21.15 minimum, scaling per the same valuation tiers used for residential in the RCRBD Permit Fee Schedule-PoliciesVerifiedvia Commercial Building Permit (New Construction, Additions & Alterations)Commercial Building Permit (New Construction, Additions & Alterations)
SterlingSee city page for the current Commercial Building Permit (New Construction / Major Alteration) feeCommercial Building Permit (New Construction / Major Alteration)
Superior$28.50Verifiedvia Commercial Building Permit (New Construction / Additions / Alterations)Commercial Building Permit (New Construction / Additions / Alterations)
TellurideSee city page for the current Commercial Building Permit (New Construction / Addition) feeCommercial Building Permit (New Construction / Addition)
ThorntonVaries by valuation — $30.00 minimum up to $5,615.25 + $3.75/$1,000 over $1,000,000VerifiedCommercial Tenant Improvement Permit
TimnathSee city page for the current Commercial Tenant Improvement / Tenant Finish Permit feeCommercial Tenant Improvement / Tenant Finish Permit
TrinidadSee city page for the current Commercial Building Permit (New Construction) feeCommercial Building Permit (New Construction)
Unincorporated Pueblo CountySee city page for the current Commercial Building Permit (includes Tenant Improvements) feeCommercial Building Permit (includes Tenant Improvements)
Unincorporated Teller CountySee city page for the current Commercial Building Permit feeCommercial Building Permit
Unincorporated Washington County$150.00 flatVerifiedvia Commercial Building Permit (Use by Special Review)Commercial Building Permit (Use by Special Review)
VailSee city page for the current Commercial Remodel / Tenant Improvement / Addition Permit feeCommercial Remodel / Tenant Improvement / Addition Permit
VictorSee city page for the current Commercial Building Permit (New Construction & Addition) feeCommercial Building Permit (New Construction & Addition)
Walsh$15.00Verifiedvia Building Permit (Commercial Construction and Tenant Improvements)Building Permit (Commercial Construction and Tenant Improvements)
Wellington$25 flatVerifiedCommercial Tenant Finish / Remodel (Tenant Improvement) Permit
WestminsterPer the City of Westminster Building Division Fee Schedule valuation tiersVerifiedCommercial Tenant Improvement Permit
Wheat Ridge80% of the appropriate occupancy's ICC Building Valuation Data (BVD) figureVerifiedvia Commercial Building Permit (New Construction / Shell)Commercial Building Permit (New Construction / Shell)
WindsorSee city page for the current Commercial Tenant Finish / Remodel (Tenant Improvement) Permit feeCommercial Tenant Finish / Remodel (Tenant Improvement) Permit
Winter ParkSee city page for the current Commercial Building Permit feeCommercial Building Permit
Yuma$100.00Verifiedvia Building Permit (Commercial New Construction, Addition, Alteration, Tenant Improvement)Building Permit (Commercial New Construction, Addition, Alteration, Tenant Improvement)