Do I Need a Permit for a Hot Tub in Utah?

Hot tub permit requirements. Electrical permits, structural support, barrier rules, and installation tips.

Yes — at minimum an electrical permit for the 240V circuit.

Utah-specific rules

Adopted code: 2023 NEC, adopted statewide under Utah Code § 15A-2-103. Hot-tub electrical work — equipotential bonding, GFCI protection, and the disconnect location — is governed by the statewide 2023 NEC; the tub's structural pad and site placement fall under your jurisdiction's local building rules.

Sources: Utah State Construction and Fire Codes Act (Title 15A)

Electrical Permit Is Always Required

Hot tubs require a dedicated 240V/50A circuit with GFCI protection and a disconnect switch within sight of the tub (but at least 5 feet from the water). This always requires an electrical permit and inspection — there's no exception for portable/plug-in hot tubs at this voltage.

Structural Considerations

A filled hot tub with occupants can weigh 3,000-6,000 pounds. If placing on a deck, verify the deck can handle the load — this may require a structural assessment or building permit for deck reinforcement. A concrete pad on grade is the simplest solution.

Barrier Requirements

Some cities require barriers (fencing) around hot tubs, similar to swimming pools. A lockable hard cover with clips may satisfy this requirement in some jurisdictions. Check with your city — rules vary.

120V Plug-In Hot Tubs

Smaller 120V plug-in hot tubs that use a standard outlet do not require an electrical permit. However, the outlet must still be GFCI-protected. If you're installing a new outdoor GFCI outlet for the hot tub, that outlet installation does require an electrical permit.

Any 240V hot tub needs an electrical permit ($40-$75). Check if your city also requires a barrier or building permit for the support structure.

Permit fees by city in Utah

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

110 rows

Permit fees by city in Utah
Permit feeSource
Alpine$1,000.00, payable upon submission of plans and deducted from the plan check feeVerifiedvia Residential Building Permit (New Home)Residential Building Permit (New Home) →
American Fork$100.00VerifiedElectrical Permit →
Bountiful$75.50 ($75.00 permit + $0.75 state fee)VerifiedElectrical Permit →
Brigham CityValuation-based (illustrative sample: $1,951.93 on a $250,000 valuation)Verifiedvia Residential Building Permit (New Single-Family Dwelling)Residential Building Permit (New Single-Family Dwelling) →
Cedar CitySee city page for the current Electrical Permit (incl. Electric Meter) feeElectrical Permit (incl. Electric Meter) →
Cedar HillsBased on valuation (no flat table published; assessed per International Building Code valuation methodology)Verifiedvia Residential Building PermitResidential Building Permit →
Centerville$70.70VerifiedElectrical Permit →
ClearfieldValuation-based per building permit fee table (see residential building permit fees)VerifiedElectrical Permit →
Clinton$58.80Verifiedvia Residential Building PermitResidential Building Permit →
Coalville$10 issuance fee plus $0.035 per square footVerifiedElectrical Permit →
Cottonwood Heights100% of the building valuation data table from the most current IBC edition adopted in UtahVerifiedvia Residential Building Permit (New Dwelling / Remodel)Residential Building Permit (New Dwelling / Remodel) →
Draper$150.00VerifiedElectrical Permit →
Eagle Mountain$24Verifiedvia Residential Building PermitResidential Building Permit →
Enoch CitySet by the Uniform Building Code valuation table, plus a 1% State of Utah surcharge on the total building permit fee.Verifiedvia Residential Building PermitResidential Building Permit →
EphraimICC Building Valuation Data-based, city-limits rate (lowest of the county's three rate tiers); no static current dollar figure published -- quoted through the county's online permit portalVerifiedvia Single-Family Residential Building PermitSingle-Family Residential Building Permit →
Farmington$75.00Verifiedvia Residential Building PermitResidential Building Permit →
Farr WestBased on square footage and valuation; amount cannot be determined until plan review is completed by the Building Inspector.Verifiedvia Residential Building Permit (New Single-Family Home)Residential Building Permit (New Single-Family Home) →
Fruit HeightsSee city page for the current Electrical Permit feeElectrical Permit →
Grantsville0.0068 x total permit valueVerifiedvia Residential Building Permit (Single Family Dwelling)Residential Building Permit (Single Family Dwelling) →
Heber CityValuation-based per the ICC Building Safety Journal fee tables, updated biannuallyVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction) →
Herriman$100VerifiedElectrical Permit →
HighlandAs Set Forth by the International Code Council (valuation-based; no fixed city table published)Verifiedvia Residential Building Permit (New Home)Residential Building Permit (New Home) →
HolladayDetermined per project valuation using the 1997 Uniform Administrative Code, Table 3-AVerifiedvia Residential Building Permit (New Dwelling / Remodel)Residential Building Permit (New Dwelling / Remodel) →
Hurricane$1–$500: $24 flat. $501–$2,000: $24 + $3 per additional $100 or fraction, up to $2,000. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction, up to $40,000. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction, up to $100,000. $100,000–$500,000: $1,027 + $7 per additional $1,000 or fraction, up to $500,000. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction, up to $1,000,000. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction, up to $5,000,000. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction.Verifiedvia Residential Building PermitResidential Building Permit →
IvinsBased on Valuation, using the City's 1997 Valuation CodeVerifiedvia Residential Building PermitResidential Building Permit →
Kaysville$195 plus any impact fee difference (e.g., amperage increase)VerifiedElectrical Permit / Service Upgrade →
La VerkinBased upon 90% of the square foot construction costs chart (dated 06/18/08)Verifiedvia Residential Building PermitResidential Building Permit →
LaytonValuation-based per building permit fee table (see residential building permit fees); plan check is 40% of permit fee (residential) or 65% (commercial)VerifiedElectrical Permit →
LehiValuation-based per Lehi City building permit fee scheduleVerifiedElectrical Permit →
LindonDetermined using 1997 Uniform Building Code, Table 1-A, applied to project valuationVerifiedvia Residential Building Permit (New SFD, Townhome, Duplex, ADU)Residential Building Permit (New SFD, Townhome, Duplex, ADU) →
Logan8% of the Building Permit FeeVerifiedElectrical Permit →
MapletonBased on IBC valuation table, multiplied by a 0.005 factorVerifiedvia Residential Building PermitResidential Building Permit →
Midvale5% of the Building Permit FeeVerifiedElectrical Permit →
Millcreek$70VerifiedElectrical Permit →
Moab$1.00–$500.00: $85.00 flat. $501.00–$2,000.00: $100.00 for the first $500 plus $3.66 for each additional $100 (or fraction). $2,001.00–$25,000.00: $119.90 for the first $2,000 plus $16.80 for each additional $1,000 (or fraction). $25,001.00–$50,000.00: $506.30 for the first $25,000 plus $12.12 for each additional $1,000. $50,001.00–$100,000.00: $809.30 for the first $50,000 plus $8.40 for each additional $1,000. $100,001.00–$500,000.00: $1,229.30 for the first $100,000 plus $6.72 for each additional $1,000. $500,001.00–$1,000,000.00: $3,917.30 for the first $500,000 plus $6.72 for each additional $1,000. $1,000,001.00 and up: $7,277.30 for the first $1,000,000 plus $6.72 for each additional $1,000.Verifiedvia Residential Building PermitResidential Building Permit →
Monticello$1–$500: $23.50 flat. $501–$2,000: $23.50 for the first $500 plus $3.05 for each additional $100. $2,001–$25,000: $69.25 for the first $2,000 plus $14.00 for each additional $1,000. $25,001–$50,000: $391.25 for the first $25,000 plus $10.10 for each additional $1,000. $50,001–$100,000: $643.75 for the first $50,000 plus $7.00 for each additional $1,000. $100,001–$500,000: $993.75 for the first $100,000 plus $5.60 for each additional $1,000. $500,001–$1,000,000: $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000. $1,000,000 and up: $5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000.Verifiedvia Residential Building PermitResidential Building Permit →
Morgan County$100.00VerifiedElectrical Permit →
Murray$100VerifiedElectrical Permit →
NephiBased off valuation (no flat citywide table published; fee computed by the contracted plans examiner/building inspector from project valuation)Verifiedvia Residential Building PermitResidential Building Permit →
Nibley$1–$500: $24.00 flat. $501–$2,000: $24 for the first $500 plus $3 for each additional $1,000 (or fraction thereof). $2,001–$40,000: $69 for the first $2,000 plus $11 for each additional $1,000 (or fraction thereof). $40,001–$100,000: $487 for the first $40,000 plus $9 for each additional $1,000 (or fraction thereof). $100,001–$500,000: $1,027 for the first $100,000 plus $7 for each additional $1,000 (or fraction thereof). $500,001–$1,000,000: $3,827 for the first $500,000 plus $5 for each additional $1,000 (or fraction thereof). $1,000,001–$5,000,000: $6,327 for the first $1,000,000 plus $3 for each additional $1,000 (or fraction thereof). $5,000,001 and over: $18,327 for the first $5,000,000 plus $1 for each additional $1,000 (or fraction thereof).Verifiedvia Residential Building PermitResidential Building Permit →
North LoganAs established in the 1997 Uniform Building Code (Table No. 3-A), adjusted annually by the CPIVerifiedvia Residential Building PermitResidential Building Permit →
North OgdenValuation-based: 1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20%Verifiedvia Residential/Commercial Building PermitResidential/Commercial Building Permit →
North Salt LakeValuation-based per most recent ICC Building Valuation Data ScheduleVerifiedvia Residential Building PermitResidential Building Permit →
OgdenValuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)VerifiedElectrical Permit →
Orem$40.00 base + applicable amount from Table 3B, 1997 UAC w/2023 revisionsVerifiedElectrical Permit →
Park City1.32% of the total valuation of construction, plus 1% state surchargeVerifiedElectrical Permit →
PaysonSee ICC valuation table with 0.75 regional multiplierVerifiedvia Residential Building Permit (New Single Family / Additions)Residential Building Permit (New Single Family / Additions) →
Plain CityValuation-based per Table 1-A of the 1997 Uniform Building Code — not a fixed dollar figure. Example brackets: $1-$500 valuation = $23.50; $501-$2,000 = $23.50 + $3.05 per additional $100 (or fraction) up to $2,000; $2,001-$25,000 = $69.25 + $14.00 per additional $1,000 (or fraction) up to $25,000; $25,001-$50,000 = $391.75 + $10.10 per additional $1,000 up to $50,000; $50,001-$100,000 = $643.75 + $7.00 per additional $1,000 up to $100,000; $100,001-$500,000 = $993.75 + $5.60 per additional $1,000 up to $500,000; $500,001-$1,000,000 = $3,233.75 + $4.75 per additional $1,000 up to $1,000,000; over $1,000,000 = $5,608.75 + $3.65 per additional $1,000.Verifiedvia Residential Building PermitResidential Building Permit →
Pleasant Grove$250.00Verifiedvia Residential Building Permit (New Single Family)Residential Building Permit (New Single Family) →
Pleasant View$75.00VerifiedElectrical Permit →
PriceSee city page for the current Residential Building Permit (New Home / Cabin) feeResidential Building Permit (New Home / Cabin) →
ProvoSee city page for the current Electrical Permit feeElectrical Permit →
RichfieldSee city page for the current Residential Building Permit feeResidential Building Permit →
Riverdale$1–$1,100: $48.36. Scales up through published valuation brackets (e.g., $23,001–$25,000: $469.50; $50,000: $773.10; $99,001–$100,000: $1,192.50). $100,000–$500,000: $1,192.50 for the first $100,000 plus $6.75 per additional $1,000 or fraction thereof. $500,001–$1,000,000: $3,880.50 for the first $500,000 plus $5.70 per additional $1,000 or fraction thereof. $1,000,001 and up: $6,730.50 for the first $1,000,000 plus $4.40 per additional $1,000 or fraction thereof.Verifiedvia Residential Building PermitResidential Building Permit →
RivertonAssessed on project valuation per the 1994 Modified UBC 1-A Fee Table (same table as the building permit); valuation estimated from scope of work per February 2020 ICC BVD TableVerifiedElectrical Permit →
Roosevelt$23.50Verifiedvia Residential/Duplex Building PermitResidential/Duplex Building Permit →
RoyDerived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation DataVerifiedvia Residential Building Permit (One & Two Family Dwellings)Residential Building Permit (One & Two Family Dwellings) →
Salt Lake City$57VerifiedElectrical Permit →
Sandy$2,967Verifiedvia Single-Family New ConstructionSingle-Family New Construction →
Santa ClaraBased on Valuation (current ICC rates)Verifiedvia Residential Building PermitResidential Building Permit →
SantaquinCost based on the valuation of the structure, per the current Building Valuation Data sheet from the IRCVerifiedvia Residential Building PermitResidential Building Permit →
Saratoga Springs$22.00 eachVerifiedElectrical Permit →
South Jordan$282VerifiedElectrical Permit →
South Ogden$0–$1,300: $47.00 flat. $1,301–$2,000: $47.00 for the first $1,300 plus $3.05 for each additional $100 or fraction thereof. $2,001–$25,000: $68.35 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof. $25,001–$50,000: $390.35 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof. $50,001–$100,000: $642.85 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof. $100,001–$500,000: $992.85 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof. $500,001–$1,000,000: $3,232.85 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof. $1,000,001+: $5,607.85 for the first $1,000,000 plus $3.65 for each additional $1,000,000 or fraction thereof.Verifiedvia Residential Building Permit (New Construction / Additions / Alterations)Residential Building Permit (New Construction / Additions / Alterations) →
South Salt LakeBuilding Fee (B) = local multiplier x Gross ICCBVD Valuation; Plan Check Fee (P) = B x 0.65; State Surcharge Fee (Y) = B x 0.01; Total = B + P + YVerifiedvia Residential Building Permit (New Construction / Addition / Remodel)Residential Building Permit (New Construction / Addition / Remodel) →
South WeberGross Area x Square Foot Construction Cost x Permit Fee Multiplier, per the 2025 ICC Building Code Valuation DataVerifiedvia Residential Building Permit (New Construction)Residential Building Permit (New Construction) →
Spanish ForkAs set by 2021 IRC/IBC valuation table (same general Building Permit fee — no separate flat electrical sub-permit rate is published)VerifiedElectrical Permit →
SpringvilleNo fixed dollar figure is published for a standalone electrical permit. The Building Fees section of the current FY 2026 Comprehensive Fee Schedule (lines 396-415) lists only Building Permit Fee and Plan Check Fee, both 'Assessed by Plans Examiner,' with no separate electrical line item; the newer Fiscal 2026-2027 schedule adds none either.VerifiedElectrical Permit →
St. GeorgeValuation-based per the 1997 Uniform Building Code fee scale (same tiers as residential building permit above)VerifiedElectrical Permit →
Syracuse$100.00 for Building Value $1-$1,000; $100.00 + $2.70 per addl. $100 (or fraction) for $1,001-$2,000; $127.00 + $16.80 per addl. $1,000 (or fraction) for $2,001-$25,000; $513.00 + $12.11 per addl. $1,000 (or fraction) for $25,001-$50,000; $816.00 + $8.40 per addl. $1,000 (or fraction) for $50,001-$100,000; $1,236.00 + $6.72 per addl. $1,000 (or fraction) for $100,001-$500,000; $3,924.00 + $5.70 per addl. $1,000 (or fraction) for $500,001-$1,000,000; $6,774.00 + $4.65 per addl. $1,000 (or fraction) for $1,000,000.00+Verifiedvia Residential Building Permit (New Home / Addition / Remodel)Residential Building Permit (New Home / Addition / Remodel) →
Taylorsville$60.00VerifiedElectrical Service Permit →
TooeleCalculated from project valuation using IBC-established rate tablesVerifiedvia Residential Building PermitResidential Building Permit →
Tremonton1% of Building ValuationVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Beaver CountyDetermined by the current IBC/IRC valuation methodologyVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Box Elder County$100.00VerifiedElectrical Permit (Meter Upgrade / Generator / Battery) →
Unincorporated Cache County$75VerifiedElectrical Permit →
Unincorporated Carbon CountySee city page for the current Residential Building Permit (New Home / Cabin) feeResidential Building Permit (New Home / Cabin) →
Unincorporated Daggett County$600 (nonrefundable at application; credited toward final plan-check/permit cost)Verifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Davis County$202.00 minimumVerifiedElectrical Permit →
Unincorporated Duchesne CountyCalculated from the county-adopted cost-per-square-foot valuation table published in the August issue of the ICC Building Safety Journal, applied to the project's estimated construction cost valuationVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Emery CountyValuation-based, per square foot value assigned to each building component (basement, main floor, second floor, garage, carport, covered porch/patio/deck, on-site improvements, storage shed, remodel) using the ICBO 1997 Uniform Building Code (UBC) valuation/fee scheduleVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Garfield County$60.00Verifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Grand County$65.00Verifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Iron CountyB.P. $111.25 + State FeeVerifiedElectrical Permit (Service Upgrade, New Meter Base) →
Unincorporated Juab CountyValuation-based; computed by the Planning and Zoning Department from the applicant's Total Valuation at time of reviewVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Kane CountyBased on ICC Current Valuation Data (average ~$2,500 per current-cycle reference) plus a 25% plan check fee and a 1% state education feeVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Millard County$25.00 + 1% state surcharge ($0.25) = $25.25 totalVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Piute CountySee city page for the current Residential Building Permit feeResidential Building Permit →
Unincorporated Rich CountySet by the fee table in the International Residential Code (IRC) edition adopted at the time of application — Rich County does not publish a separate dollar-figure fee schedule; per Rich County Ordinance for Building Permits and Certificates of Occupancy (adopted 2025), Section 2.D: 'The County adopts the building permit fees set out in the International Residential Code applicable at the time of application.'Verifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Salt Lake County$70.00VerifiedElectrical Permit →
Unincorporated San Juan County1.75 × square footage of the structure (example given by the county: 2,000 sq ft = $3,500)Verifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Sanpete CountySee city page for the current Residential Building Permit feeResidential Building Permit →
Unincorporated Sevier CountySee city page for the current Residential Building Permit feeResidential Building Permit →
Unincorporated Summit County0.0075 (3/4 of 1%) of construction valuation; $100 minimum fee (covers the cost of one inspection)Verifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Tooele CountyValuation-based, per Uniform Building Code fee-calculation provisionsVerifiedvia Residential Building PermitResidential Building Permit →
Unincorporated Uintah County$50.00VerifiedElectrical Permit →
Unincorporated Utah County$101.00VerifiedElectrical Permit →
Unincorporated Wasatch Countyapprox. $1.25 per sq ft (as of 6/13/2016 per the county's published FAQ figure; includes all square footage — finished, unfinished garage, porches, and decks)Verifiedvia Residential Building Permit (Single Family Dwelling, New Construction)Residential Building Permit (Single Family Dwelling, New Construction) →
Unincorporated Washington CountyValuation-based per the Washington County building permit fee schedule (see residential building permit fees above)VerifiedElectrical Permit →
Unincorporated Wayne CountySee city page for the current Residential Building Permit feeResidential Building Permit →
Vernal$50.00VerifiedElectrical Permit (Maintenance / Repair) →
Vineyard$1 to $1,300: $86 flat. $1,301–$2,000: $86 for the first $1,300 plus $3 per additional $100 or fraction thereof. $2,001–$40,000: $107 for the first $2,000 plus $11 per additional $1,000 or fraction thereof. $40,001–$100,000: $525 for the first $40,000 plus $9 per additional $1,000 or fraction thereof. $100,001–$500,000: $1,065 for the first $100,000 plus $7 per additional $1,000 or fraction thereof. $500,001–$1,000,000: $3,865 for the first $500,000 plus $5 per additional $1,000 or fraction thereof. $1,000,001–$5,000,000: $6,365 for the first $1,000,000 plus $3.50 per additional $1,000 or fraction thereof. $5,000,001 and over: $20,354 for the first $5,000,000 plus $2 per additional $1,000 or fraction thereof.Verifiedvia Residential Building Permit (New Construction / Addition / Remodel)Residential Building Permit (New Construction / Addition / Remodel) →
Washington City$30.00Verifiedvia Residential Building Permit (Single Family)Residential Building Permit (Single Family) →
Washington TerraceSet by the 'Building Permit Fee Schedule' in the most current adopted code edition, applied to project valuation determined from the 'Building Valuation Data' table published in the current issue of ICC's 'Building Standards.'Verifiedvia Residential Building PermitResidential Building Permit →
West Bountiful$1,000Verifiedvia Residential Building PermitResidential Building Permit →
West HavenEstablished in WHCC § 151.15, as amendedVerifiedvia Residential Building Permit (New Construction / Additions / Remodels)Residential Building Permit (New Construction / Additions / Remodels) →
West Jordan$70VerifiedElectrical Permit →
West PointBased on building valuation and square footageVerifiedvia Residential Building PermitResidential Building Permit →
West Valley City$53VerifiedElectrical Permit →
Woods Cross$1.00–$500.00: $24.70 flat. $501.00–$2,000.00: $24.70 + $3.20 per additional $100 (or fraction). $2,001.00–$25,000.00: $72.70 + $14.70 per additional $1,000 (or fraction). $25,001.00–$50,000.00: $410.80 + $10.60 per additional $1,000. $50,001.00–$100,000.00: $675.80 + $7.40 per additional $1,000. $100,001.00–$500,000.00: $1,045.80 + $5.90 per additional $1,000. $500,001.00–$1,000,000.00: $3,405.80 + $5.00 per additional $1,000. $1,000,001.00 and up: $5,905.80 + $3.80 per additional $1,000.Verifiedvia Residential Building Permit (New Single-Family Dwelling)Residential Building Permit (New Single-Family Dwelling) →

See the national overview for this permit →