Skip to main content
PermitBase
New privately-owned residential construction only

Where Colorado is building

Two datasets, side by side. Growth ranks come from the U.S. Census Bureau Building Permits Survey — new privately-owned residential construction only, not total permit volume. The fee column is each city’s own published residential building-permit fee, shown verbatim for reference: it is never ranked, averaged, or presented as comparable across cities (why not →).

Census activity data covers 124 of the 128 Colorado jurisdictions PermitBase tracks.

Source: U.S. Census Bureau, Building Permits Survey (BPS) · data through 2026-07

Fastest-growing cities

Trailing-12-month units, ranked by year-over-year growth — each city’s residential permit fee sits alongside for reference, never part of the rank.

Trailing-12-month units, by growth

Superior
566 units
+405.4%
Gypsum
154 units
+202.0%
Firestone
217 units
+201.4%
Castle Pines
366 units
+179.4%
Commerce City
1,011 units
+80.5%

Eligible for a growth rank: fully-reported trailing-12 and prior-12 month windows, a prior-year total of at least 50 units, and place-level (non-county) records only.

Colorado cities by building-permit growth

Ranked by trailing-12-month Census units. The fee column is reference only — see how to read this table.

#JurisdictionTrailing-12 unitsYoY growthResidential permit fee *
1Denver5,690(10 mo)insufficient history$20.00Verifieddetails →
2Colorado Springscounty-wide totals5,366county estimate$50.00Verifieddetails →
3Aurora1,833+45.2%$1.30Verifieddetails →
4Fort Collins1,614+67.1%$0.65Verifieddetails →
5Greeley1,070(11 mo)insufficient history$23.50Verifieddetails →
6Commerce City1,011+80.5%$30.41Verifieddetails →
7Longmont875(8 mo)insufficient history$27.00Verifieddetails →
8Littleton81640.4%$25.85Verifieddetails →
9Parker60240.0%$23.50Verifieddetails →
10Superior566+405.4%$28.50Verifieddetails →
11Johnstown503insufficient history$23.50Verifieddetails →
12Castle Pines366+179.4%$42.00Verifieddetails →
13Thornton328(11 mo)insufficient history$30.00Verifieddetails →
14Dilloncounty-wide totals323county estimate$50.00Verifieddetails →
15Brighton284insufficient history$23.50Verifieddetails →
16Arvada268(11 mo)insufficient history$34.00Verifieddetails →
17Westminster240(10 mo)insufficient history$19.50Verifieddetails →
18Fort Lupton220+4.8%$24.00Verifieddetails →
19Erie218(10 mo)insufficient history$23.50Verifieddetails →
20Firestone217+201.4%$80Verifieddetails →
21Timnath202(11 mo)insufficient historyNot published onlineVerifieddetails →
22Loveland197(9 mo)insufficient history$175.92Verifieddetails →
23Lone Tree18473.4%$23.50Verifieddetails →
24Montrose173+18.5%$1.00Verifieddetails →
25Bennett167+22.8%$23.50Verifieddetails →
26Gypsum154+202.0%$1.00Verifieddetails →
27Avon13946.7%$50.00Verifieddetails →
28Windsor138(4 mo)insufficient historyEqual to SAFEbuilt's own valuation-based feeVerifieddetails →
29Broomfield13685.7%$23.50Verifieddetails →
30Berthoud12725.3%Per the 2024 IRC Appendix AB valuation-based fee tableVerifieddetails →
31Silverthorne127insufficient history$65.00Verifieddetails →
32Boulder123(10 mo)insufficient history$25.00Verifieddetails →
33Lochbuie110+31.0%$33.80Verifieddetails →
34Unincorporated Pueblo Countycounty-wide totals108county estimate$73.93Verifieddetails →
35Unincorporated Teller Countycounty-wide totals103county estimate
36Breckenridge83insufficient history$50.00Verifieddetails →
37Mead818.0%$44.56Verifieddetails →
38Englewood78(10 mo)insufficient history$26.78Verifieddetails →
39Frederick75(11 mo)insufficient history$35.00Verifieddetails →
40Severance70insufficient historyValuation-based, determined by SAFEbuilt ColoradoVerifieddetails →
41Fruita66(10 mo)insufficient history$35.00Verifieddetails →
42Alamosa61(8 mo)insufficient history$24Verifieddetails →
43Durango51insufficient history$24.00Verifieddetails →
44Wellington48below floor$25Verifieddetails →
45Dacono46insufficient historyComputed by the Building Official using the ICC Building Safety Journal's Building Valuation Data (BVD), updated bi-annually each August and FebruaryVerifieddetails →
46Eagle41(8 mo)insufficient history$39.40Verifieddetails →
47Ault40below floor$23.00Verifieddetails →
48Louisville34(11 mo)insufficient history$28.00Verifieddetails →
49Town of Carbondale26insufficient history$27.50Verifieddetails →
50Lakewood2382.3%$26.00Verifieddetails →
51Conejos County (Unincorporated)county-wide totals20county estimate$24Verifieddetails →
52Glenwood Springs20insufficient history$23.50Verifieddetails →
53Delta1977.1%$23.50Verifieddetails →
54Florence18insufficient history$75.00Verifieddetails →
55Cañon City15below floor1.0% of valuation (City of Cañon City Permit Fee Multiplier)Verifieddetails →
56Lafayette14below floor$30.00Verifieddetails →
57Golden12(11 mo)insufficient history$25.85Verifieddetails →
58Keenesburg10(9 mo)insufficient history$33.80Verifieddetails →
59Mountain Village9below floorWaiveddetails →
60Aspen7(11 mo)insufficient history$1Verifieddetails →
61Rifle7(3 mo)insufficient history$23.50Verifieddetails →
62Silver Cliff7insufficient history
63Woodland Park7(11 mo)insufficient history
64Crested Butte6below floor$28.42Verifieddetails →
65Fort Morgan6(11 mo)insufficient history$27.00Verifieddetails →
66Estes Park592.1%$23.50Verifieddetails →
67Mount Crested Butte5below floor$23.50Verifieddetails →
68Eaton4below floorPer Appendix L, 2018 IRC valuation table (as referenced in the Town's current Fee Schedule)Verifieddetails →
69Lamar4below floor$33.00Verifieddetails →
70Milliken4(6 mo)insufficient history$160.00Verifieddetails →
71Telluride4(8 mo)insufficient history$51.50details →
72Westcliffe3below floor$100.00Verifieddetails →
73Blue River2(4 mo)insufficient history$50.00Verifieddetails →
74Frisco2(9 mo)insufficient history$65.00Verifieddetails →
75Gunnison2(10 mo)insufficient history65% of building permit feeVerifieddetails →
76Northglenn1(6 mo)insufficient history$23.50Verifieddetails →
77Unincorporated Washington Countycounty-wide totals1county estimate$100.00Verifieddetails →
78Columbine Valley0(2 mo)insufficient history$7,600Verifieddetails →
Akronno data reportedinsufficient historyNot a fixed figure — calculated based on construction cost (valuation-based), due at time of application submissionVerifieddetails →
Basaltno data reportedinsufficient history$21.00Verifieddetails →
Bow Marno data reportedinsufficient history$56Verifieddetails →
Burlingtonno data reportedinsufficient historyNot publisheddetails →
Calhanno data reportedinsufficient historyTBD based on project — per the Town of Calhan's own official Fee Schedule (Updated 11/10/25), the 'Building Permit' line item's CURRENT value is stated verbatim as 'TBD based on project'; the printed Building Permit Application form separately has no new-construction line item and directs applicants to contact the Town office for a project-specific determinationVerifieddetails →
Centennialno data reportedinsufficient history$23.50Verifieddetails →
Centerno data reportedinsufficient history$0.10Verifieddetails →
Cheyenne Wellsno data reportedinsufficient history$25.00Verifieddetails →
Cortezno data reportedinsufficient history$75.00Verifieddetails →
Craigno data reportedinsufficient history$100.00Verifieddetails →
Cripple Creekno data reportedinsufficient historySet per the City of Cripple Creek Building Fee Schedule (valuation-based), adopted/amended by City Council resolution (most recently identified reference: Resolution 2021-21, 'Approving the Building, Planning and Community Development Fee Schedule')details →
El Pasono data reportedinsufficient history
Evansno data reportedinsufficient history$75.00Verifieddetails →
Federal Heightsno data reportedinsufficient history$23.50Verifieddetails →
City of Fountainno data reportedinsufficient history$80.00Verifieddetails →
Garden Cityno data reportedinsufficient history
Gilcrestno data reportedinsufficient history$23.00Verifieddetails →
Grand Junctionno data reportedinsufficient history$50.00Verifieddetails →
Haxtunno data reportedinsufficient history$10.00Verifieddetails →
Holyokeno data reportedinsufficient history
Hudsonno data reportedinsufficient history$35.00Verifieddetails →
Kerseyno data reportedinsufficient historySet by SAFEbuilt per the Uniform Building Code (UBC) valuation-based fee schedule (not a flat Town-published table)Verifieddetails →
La Juntano data reportedinsufficient historyCalculated from Total Valuation (Materials $ + Labor $) stated on the application; fees payable to the City of La Junta at time of permit issuanceVerifieddetails →
La Salleno data reportedinsufficient history$24details →
Larkspurno data reportedinsufficient history$23.50details →
Lyonsno data reportedinsufficient history$135Verifieddetails →
Morrisonno data reportedinsufficient historyPer the adopted code (2015 IBC valuation-based fee table)Verifieddetails →
Mountain Viewno data reportedinsufficient history$40.00Verifieddetails →
Nederlandno data reportedinsufficient history$275.00Verifieddetails →
Nunnno data reportedinsufficient history$75.00Verifieddetails →
Palisadeno data reportedinsufficient history$10.00Verifieddetails →
Pierceno data reportedinsufficient history$30Verifieddetails →
Plattevilleno data reportedinsufficient history$50.00Verifieddetails →
Poncha Springsno data reportedinsufficient history$50.00Verifieddetails →
Saguacheno data reportedinsufficient history$20.00Verifieddetails →
Salidano data reportedinsufficient history$50.00Verifieddetails →
Sedgwickno data reportedinsufficient history$30.00Verifieddetails →
Steamboat Springsno data reportedinsufficient history$21.15Verifieddetails →
Sterlingno data reportedinsufficient history$23.50details →
Trinidadno data reportedinsufficient history$24.00details →
Vailno data reportedinsufficient history$50.00details →
Victorno data reportedinsufficient history$23.50Verifieddetails →
Walshno data reportedinsufficient history$15.00Verifieddetails →
Wheat Ridgeno data reportedinsufficient history$26.50Verifieddetails →
Winter Parkno data reportedinsufficient history$54.00Verifieddetails →
Yumano data reportedinsufficient history$100.00Verifieddetails →

How to read this table

Rows are ranked only by Census building-activity units — the one figure that’s measured the same way in every city. The fee column is never ranked, averaged, or sorted, because permit fees aren’t measured the same way from city to city: some jurisdictions charge a flat fee, others price on a sliding scale tied to construction valuation, others per square foot, others as a percentage of the building permit fee. Averaging or sorting those numbers together would compare figures that don’t measure the same thing — a “cheapest city” ranking built on that mix would be a misleading metric, so we don’t build one.

A dagger (†) next to a fee means it’s the starting tier from a valuation-based or sliding-scale schedule per the jurisdiction’s own published fee table — not a final total for every project. Open the linked permit page for the complete schedule.

The growth percentage only appears when a jurisdiction’s trailing-12-month and prior-12-month windows were both fully reported to the Census Bureau, and the prior-year total was at least 50 units. Below that floor a percentage swings too wildly on a small base to be meaningful, so we withhold it rather than publish a misleading rate. County-level rows never get a growth rank, since county totals can include Census imputation for non-reporting offices.

Two provenance regimes are stacked on this page: Census activity figures are self-reported by jurisdictions to the Bureau on a monthly cadence, while permit fees are independently verified by PermitBase against each department’s own published schedule (see the confidence badge and source link on each fee). A jurisdiction shown as “no data reported” did not report to the Census Bureau for that period — that is never the same as zero activity.

Frequently asked questions

Why don't you rank cities by permit cost?
Permit fees aren't measured the same way from city to city — one jurisdiction charges a flat fee, another prices on a sliding scale tied to construction valuation, another per square foot, another as a percentage of the building permit fee. Sorting those numbers together and calling the smallest one "cheapest" would compare figures that don't measure the same thing, which is a misleading metric dressed up as a ranking. So this page ranks only what's genuinely comparable across cities — Census building-activity units — and shows each city's own published fee next to it, verbatim, for reference only.
What does the growth percentage measure?
Year-over-year change in trailing-12-month housing units authorized for new privately-owned residential construction, per the Census Bureau Building Permits Survey. It only appears when both the current and prior 12-month windows were fully reported and the prior-year total meets a minimum reporting floor — otherwise a percentage would be either impossible to compute or too volatile to be meaningful.
What does the dagger (†) next to a fee mean?
It marks a fee that's a starting tier from a valuation-based or sliding-scale schedule, not a flat final total. Open the city's permit page for the complete fee table.
Why do some cities show “no data reported” instead of a number?
That jurisdiction didn't report to the Census Bureau for that period. We show it as unreported, never as zero — assuming zero activity for a non-reporting jurisdiction would be inventing a data point that doesn't exist.

See full Colorado building-activity detail →·Look up a specific Colorado permit fee →

Get this as a monthly email

The Colorado Growth & Permit Costs Report: one email a month when fresh Census data lands — fastest-growing Colorado cities by trailing-12-month building activity, each paired with its own published residential permit fee. New privately-owned residential construction only.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.